Mario Fiorillo – Transportation – Civil Mario Fiorillo Present work experience Florida If you have any questions please me at

Slides:



Advertisements
Similar presentations
Tysons Corner Consolidated Transportation Impact Analyses (CTIAs)
Advertisements

WASHOE COUNTY TRAFFIC ANALYSIS WORKSHOP FEBRUARY 19, 2008.
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
Tuesday, April 14, 2015 Southeast Florida Status of Model Developments Model Coordinators D4: Min-Tang Li D6: Phil Steinmiller.
NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Mario Fiorillo – Transportation – Civil - Computers Mario Fiorillo, SI Florida, New York, New Jersey WORK EXPERIENCE.
Comparative Traffic Study Morrisville-Carpenter Road versus Crabtree Crossing Extension Presentation to: Morrisville Town Council Prepared by: Parsons.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Freight Action Strategy for the Everett-Seattle-Tacoma Corridor February 2003.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Florida Gas Transmission Mainline Hydrostatic Test From the intersection of Milam Dairy Road with NW 65 th Street to the intersection of Galloway Road.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Florida Gas Transmission Mainline Hydrostatic Test From the Palmetto Expressway Interchange with Okeechobee Road to the Intersection of Milam Dairy Road.
ITS America 2005 Enhanced Transit Information CIN RTO Consumer Information Network Regional Transit Organization Presented by: Jesus A. Martinez, P.E.
NE 203 rd Street & NE 215 th Street Intersection Improvements between US 1 & West Dixie Highway Florida Department of TRANSPORTATION Upcoming Project Development.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Florida Gas Transmission Section #1 Hydrostatic Test 14-Inch Saint Petersburg Lateral Pipeline From Compressor Station 30 (Plant City West) to Main Line.
Working Group Core Team Meeting II February 14, 2008.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
Orem City Roundabout Feasibility Study Brigham Young University and the City of Orem Determination of available land Roundabout parameters established.
SR 997 / KROME AVENUE Florida Department of Transportation April 27th, 2006 South Miami-Dade Watershed Study Advisory Committee.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Florida Gas Transmission Mainline Hydrostatic Test From the Golden Glades Interchange to the interchange of NW 122 nd Street with the Palmetto Expressway.
Access Management: South Carolina’s Experience Rick Werts Director of Traffic Engineering South Carolina Department of Transportation.
1 Traffic-Intolerant Bicyclists and Boston’s Greenway Network Peter G. Furth Professor Department of Civil & Environmental Engineering Northeastern University.
Development of A Traffic Monitoring Program Using Emme 3 Based on A San Joaquin COG Travel Demand Model Jia Hao Wu, Ph.D., Joy Bhattacharya, P.E. and Chris.
Integrated Macro-Micro Highway Demand/Operational Analysis Case Study: Cross Bronx Expressway Corridor, Bronx, NY Presented at the 15 th TRB Transportation.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Orange County Traffic Signal System Consolidation of Services Study Commission Meeting September 8, 2005.
Florida Gas Transmission 10-Inch Hydrostatic Test 10-Inch Saint Petersburg Lateral Pipeline From I-275 (Valve B) to US-19 North of SR 688/Ulmerton.
Problem 1: Determination of Facility Types for Analysis.
11th TRB National Transportation Planning Applications Conference CORRADINO May 9, Validation of Speeds and Volumes in a Large Regional Model Southeast.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Village of Palmetto Bay
Premium Transit District 4, Office of Modal Development Making the Connection.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Program Manager Administrator
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Visit Our Website at: Click to edit Master title style.
The I-465 West Leg Reconstruction Project
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Florida Gas Transmission 18-Inch Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
Tasnim Rabee’ Nagham Dmaidi
Evaluation and Redesign Faisal and Amman Streets
2016 SCORT Annual Meeting Federal Grant Opportunities
Florida Gas Transmission Mainline Hydrostatic Test
Florida Gas Transmission Mainline Hydrostatic Test
Proposed Driscoll Expansion Brookline, Massachusetts
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
School of Civil Engineering
Presentation transcript:

Mario Fiorillo – Transportation – Civil Mario Fiorillo Present work experience Florida If you have any questions please me at Thanks you

Mario Fiorillo – Transportation – Civil A. City of Fort Pierce, FL. Developed computer software (Excel) to manage the City Concurrency Management System within the City limits. The proposed new turning movement site traffic for is enter on individual spread sheets and link capacity for these corridors affected by the new traffic are analyzed during the P.M. Peak Hour for two way link volume. Bi-directional link capacity analysis is perform thru-ought the network. The contributing Traffic percentage of each individual approved project is also calculated and it will be used for future mitigation. The existing traffic volume can also be updated via spread sheet. A total of 13 major corridor were developed with 42 nodes and approximately 62 links for this network. B. City of Homestead, FL. Developed computer software (Excel) to manage the City Concurrency Management System within the City limits. The new turning movement site traffic for any new development is enter on individual spread sheets and link capacity for these corridor affected by the new traffic are analyzed for total link volume capacity. The contributing percentage of each individual approved project is also calculated for future mitigation.

Mario Fiorillo – Transportation – Civil D. Blessed John XXIII, Miramar, FL. The project includes a Church, School, Office and 75 DU of Senior Residential. Currently modeling and analyzing the existing and projected traffic operations along Miramar Parkway between SW 172nd AVE. and I-75 SB ON and OFF ramps using Synchro and SimTraffic software. C. City of Pahokee, FL. Developed a computer software (Excel) to manage the City Concurrency Management System within the City limits. The new turning movement site traffic for any new development is enter on individual spread sheets and link capacity for these corridor affected by the new traffic are analyzed for total link volume capacity. The contributing percentage of each individual approved project is also calculated for future mitigation. E. Isla Verde of Wellington, Wellington, FL. Preparation of signalization plan for main access driveway and State Road 7 (U.S. 441), duties included the inventory of existing conditions, developing phasing, timing, electrical wiring diagram signalization layouts, details etc using AutoCad.

Mario Fiorillo – Transportation – Civil G. Weston General Planning Services, Weston, FL. Currently modeling and analyzing the existing and projected traffic operations of the Weston Road arterial from Southpost Road to Griffin Road using Synchro and SimTraffic software. Includes analysis of gap study data, speed study data and traffic classification data. Future signalization of three intersection within the City limit. F. Palm Beach, FL. Refurbished existing traffic signal at Royal Poinciana and Cocoanut Row after hurricane damages from 2005, duties included the preparation of plan removal of temporary signalization and future updated signalization plan, electrical wiring diagram layouts, etc. click here for plan view click here for plan view H. Midway Road PD&E Study, St. Lucie, FL. Currently modeling and analyzing the existing and future traffic operations of the Midway Road arterial from South 25th Street to US-1 using Synchro and SimTraffic software. Includes analysis of traffic operations of various proposed Midway Road cross-sections. Developed and maintain Project Web Site. click for link click for link

Mario Fiorillo – Transportation – Civil I. Tri-Rail Double Track Corridor, South FL. Tri-Rail Double Track Corridor Improvement Program, Segment 5 Project that will allow the South Florida Regional Transportation Authority/ Tri-Rail to expand commuter rail service to relieve South Florida’s congested highways while providing improved connectivity. Once completed, the Segment 5 Project will allow SFRTA/Tri-Rail to run trains every 20 minutes during peak hours. This work includes the review of existing safety conditions at 32 major crossing between Palm Beach, Broward and Dade County and the modification and expansion of signal. For this study, existing traffic data and observation of exiting queues at these locations were observed and a simulation of the existing condition was developed using SimTraffic to duplicated the field observation. This files was them modified on the basis of future traffic projections and new train schedules to simulate future condition and analyses possible queues between major intersections and railroad crossings.

Mario Fiorillo – Transportation – Civil J. City of West Palm Beach, FL Transportation Planner Consultant to The City of West Palm Beach, work at City Hall helping the Planning Department on Traffic and transportation issues. From preparing and reviewing Traffic Impact Studies, parking layout, internal circulation, provide recommendation to the City Planning Department before current applications are approve.