Cost of Wind 1 James McCalley Harpole Professor of Electrical & Computer Engineering.

Slides:



Advertisements
Similar presentations
Agribusiness Library LESSON L060088: DEVELOPING AN INCOME STATEMENT.
Advertisements

Capital Budgeting.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Capital Investments Chapter 12. Capital Budgeting How managers plan significant outlays on projects that have long-term implications such as the purchase.
Chapter 17 Investment Analysis
Ch. 2 - Understanding Financial Statements, Taxes, and Cash Flows , Prentice Hall, Inc.
Business Transactions and the Accounting Equation
EE535: Renewable Energy: Systems, Technology & Economics
CASH FLOW ANALYSIS PROFITABILITY. GENERAL CASH FLOW APPROACH CASH FLOW ANALYSIS PROVIDES A RIGOROUS METHOD TO COMPARE PROFITABILITY USES THE SAME COMPONENTS.
EVALUATING THE PERFORMANCE OF AN INVESTMENT CENTER ROE ROI EVA.
INFLATION AND CAPITAL BUDGETING INFLATION IS THE INCREASE IN THE GENERAL LEVEL OF PRICES FOR ALL GOODS AND SERVICES IN AN ECONOMY.
Accounting and Finance
Chapter 3.
Understanding the Balance Sheet and Statement of Owners’ Equity Chapter 3.
Engineering Economics in Canada Chapter 9 Inflation.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 2000 Chapter Three Opportunity Cost of Capital and of Capital and Capital Budgeting.
Chapter 21. Learn why managers use budgets Develop strategy PlanActControl 3Copyright 2009 Prentice Hall. All rights reserved.
IOWA STATE UNIVERSITY Department of Civil, Construction and Environmental Engineering Cost Estimate for Different Wind Turbine Technologies Bin Cai Wind.
Future Value Present Value Annuities Different compounding Periods Adjusting for frequent compounding Effective Annual Rate (EAR) Chapter
ACCOUNTING CONCEPTS. BASIC CASH FLOW MODEL  REVENUES = PRICE * VOLUME = R  SALVAGE = VALUE OF CAPITAL AT THE END OF THE PROJECT LIFE = S  PROFIT =
FOOD ENGINEERING DESIGN AND ECONOMICS
Wind Engineering Module 6.1: Cost and Weight Models Lakshmi N. Sankar 1.
1 Microeconomics Lecture 11 Capital market Institute of Economic Theories - University of Miskolc Mónika Orloczki Assistant lecturer Andrea Gubik Safrany,
ECE 7800: Renewable Energy Systems Topic 12: Economic Analysis of Renewable Energy Systems Spring 2010 © Pritpal Singh, 2010.
Engineering Economy Why is Engineering Economy important? Practical everyday questions –Should you finance your car or pay cash? Finance for $6995 –vs-
Classification of PP&E
1 © Copyright 2007 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star Logo, and South-Western are trademarks used herein under.
Measuring Financial Performance 1 ENTREPRENEURIAL FINANCE.
Money and Capital Markets 6 6 C h a p t e r Eighth Edition Financial Institutions and Instruments in a Global Marketplace Peter S. Rose McGraw Hill / IrwinSlides.
Opportunity Cost of Capital and Capital Budgeting
Energy Economics A synthetic methane plant from coal is to be constructed at a cost of $4 billion dollars. It requires 14,000 tons/day of coal (10,000.
The Statement of Cash Flows Chapter 4 The Statement of Cash Flows Answers u u How Much Cash Was Provided by Operations u u What Amount of Property and.
Business Valuation IV.. Income Statement Revenues Only revenues from sales during the period should be included in revenues (i.e., not cash revenues).
1 Chapter 2 Financial Statement and Cash Flow Analysis.
Engineering Economic Analysis Canadian Edition
1 Process Analysis and Design Cost Accounting and Profitability Analysis.
Pro Forma Income Statement Projected or “future” financial statements. The idea is to write down a sequence of financial statements that represent expectations.
Capital Budgeting MF 807 Corporate Finance Professor Thomas Chemmanur.
Business Transactions and The Accounting Equation
Copyright © Texas Education Agency, All rights reserved.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. 1-1 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights.
1 Chapter 9, Part 2 Time Value of Money 1. Present Value of a Single Amount 2. Present Value of an Annuity 3. Future Value of a Single Amount 4. Future.
Opportunity Cost of Capital and Capital Budgeting Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Engineering Economic Analysis Canadian Edition Chapter 3: Interest and Equivalence.
MAKING INVESTMENT DECISIONS WITH THE NET PRESENT VALUE RULE
Chapter 8 Capital Asset Selection and Capital Budgeting.
Using the wind to create electricity is great. By using windmills to create wind power is great because we are helping the Earth and the O-zone layer.
Financial Planning Skills By: Associate Professor Dr. GholamReza Zandi
1 Chapter Nine Capital Budgeting. 2 Capital Budgeting Decisions require sizable commitments of cash. are expected to generate returns that will last more.
Financial Statements Income Statements Revenues Revenues Expenses (expired costs) Expenses (expired costs) Timing of recording Timing of recording at time.
Chapter 3 Accrual Accounting Concepts. Why is Accrual Accounting Needed? Cash received or paid Revenue earned Expense incurred.
LESSON 2 – SUMMARY – TIME VALUE OF MONEY The concept of Real Interest Rate The costs associated with financial transactions The notion of costs The All-in.
1 Chapter 6: Reporting & Analyzing Operating Assets Part 3: Property, Plant & Equipment.
Financial Statements, Forecasts, and Planning
Chapter Inflation and Capital Investment Analysis
Personal Financial Statements Chapter 12 Personal Financial Statements The Balance Sheet.
Chapter 9 Project cash flow analysis 1.Understanding project cost elements 2.Why use cash flow in economic analysis 3.Income-tax rate to use in economic.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 3.
Energy Economics A synthetic methane plant from coal is to be constructed at a cost of $4 billion dollars. It requires 14,000 tons/day of coal (10,000.
Statement of cash flows –indirect method Table when adjusting Net Income to Operating Cash Flows Find the net income Determine depreciation expense. Changes.
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin BNFO 621: Business and Entrepreneurship : ACCOUNTING Roxanne M. Spindle Associate Professor.
Levelized Cost of Wind 1 J. McCalley EE 459/559. Discount rate 2 The discount rate, i, is the annual payment as percentage of the amount owed. The discount.
Chapter 3 Learning Objectives
Income Taxes and the Net Present Value Method
Chapter 9 Learning Objectives
Chapter 3 Learning Objectives
Process Economics Factors that affect profitability
10 Measures of Operating Capacity.
Intro to Financial Management
Presentation transcript:

Cost of Wind 1 James McCalley Harpole Professor of Electrical & Computer Engineering

Discount rate 2 Discount rate, i. the annual payment as a percentage of the amount owed; the value given to possession of money now rather than later, since having it now allows it to be invested to earn a return. In this sense, the discount rate is the annual income as a percentage of the amount invested, i.e., average interest rate.

Moving single amounts in time 3 “Present” amount of money “Future” amount of money Number of time periods Observe that “F” may be a cost or a revenue. In either case, the equivalent amount of money in the present is smaller. I prefer to incur a $100 cost later than a $100 cost now. I prefer to obtain a $100 revenue now than a $100 revenue later.

Annuitizing 4 “Annual” amount of money Note that payment A is made at the end of a period, so there is no payment made at the beginning of period 1, but there is a payment made at the end of period N.

Inflation 5 The discount rate does not reflect the effects of inflation. Inflation, e, changes the buying power of money. “Current dollars” are the actual cash flow that would occur during a particular year, m, accounting for inflation. “Constant dollars” are the dollars that would have been required if the cost was paid in the “base year,” n. We refer to this as “n dollars” as in “2012 dollars.” N=m-n

Inflation and discounting 6 The discount rate in the absence of inflation is called the “real” discount rate, i r. The discount rate accounting for inflation is called the “nominal” discount rate, i n. Current dollar amount at year N (accounting for inflation) Constant dollar amount at year N (without inflation)

Levelized cost of energy DataWind Turbine Purchase cost$1820/kW Installation cost$ Levelized fixed charge rate 20% Plant rating1.5 MW Capacity factor0.35 Nominal discount rate 8% Levelized fixed charge rate: Capital cost Return on investment Depreciation Fed and state income taxes Property tax Insurance costs The initial investment is ($1820/kw)*1500kW =$3,300,000 The fixed annual charges are then 0.2*3,300,000=$660,000. This is called the levelized annual revenue requirements (LARR) The average annual energy production is =Capacity*8760hrs/yr*CapacityFactor =1.5MW*8760hrs/yr*.35=4599MWhrs 7

Levelized cost of energy DataWind Turbine Purchase cost$1820/kW Installation cost$ Levelized fixed charge rate 11.6% Plant rating1.5 MW Capacity factor0.35 Nominal discount rate 8% Levelized fixed charge rate: Return on investment Depreciation Fed and state income taxes Property tax Insurance costs The initial investment is ($1820/kw)*1500kW =$3,300,000 The fixed annual charges are then 0.116*3,300,000=$382,800. This is called the levelized annual revenue requirements (LARR) The average annual energy production is =Capacity*8760hrs/yr*CapacityFactor =1.5MW*8760hrs/yr*.35=4599MWhrs 8

Levelized cost of energy DataWind Turbine Purchase cost$1820/kW Installation cost$ Levelized fixed charge rate 20% Plant rating1.5 MW Capacity factor0.40 Nominal discount rate 8% Levelized fixed charge rate: Return on investment Depreciation Fed and state income taxes Property tax Insurance costs The initial investment is ($1820/kw)*1500kW =$3,300,000 The fixed annual charges are then 0.2*3,300,000=$660,000. This is called the levelized annual revenue requirements (LARR) The average annual energy production is =Capacity*8760hrs/yr*CapacityFactor =1.5MW*8760hrs/yr*.40=5256MWhrs 9

Levelized cost of energy DataWind Turbine Purchase cost$1820/kW Installation cost$ Levelized fixed charge rate 11.6% Plant rating1.5 MW Capacity factor0.40 Nominal discount rate 8% Levelized fixed charge rate: Return on investment Depreciation Fed and state income taxes Property tax Insurance costs The initial investment is ($1820/kw)*1500kW =$3,300,000 The fixed annual charges are then 0.116*3,300,000=$382,800. This is called the levelized annual revenue requirements (LARR) The average annual energy production is =Capacity*8760hrs/yr*CapacityFactor =1.5MW*8760hrs/yr*.40=5256MWhrs 10

Levelized cost of energy ResourceLCOE PC plant$59.94/MWhr NGCC plant$99.64/MWhr Nuclear plant$66.49/MWhr Wind, CF=0.35, FCR=20%$143.51/MWhr Wind, CF=0.35, FCR=11.6%$83.24/MWhr Wind, CF=0.40, FCR=20%$125.58/MWhr Wind, CF=0.40, FCR=11.6%$72.83/MWhr

Levelized cost of energy 12 Additional note: Another term that should be added in is the annual operating expenses (AOE). This includes land lease cost, levelized O&M cost, and levelized replacement cost: AOE=LLC+LOM+LRC with units of $/year. So the expression for LCOE is AOE is generally only about 2% of the purchase cost. The above expression is sometimes expressed as: which implies AOE is given in $/MWhr.

Levelized cost of energy 13 Nuclear Energy Institute, “The cost of new generating capacity in perspective,” Sept., 2011, available online at Data from Electric Power Research Institute

Levelized cost of energy 14 Nuclear Energy Institute, “The cost of new generating capacity in perspective,” Sept., 2011, available online at Data from US DOE Energy Information Administration

Levelized cost of energy 15 Nuclear Energy Institute, “The cost of new generating capacity in perspective,” Sept., 2011, available online at National Research Council (National Academies of Science and of Engineering)

Representative split – capital costs 16 Source: P. Jamieson, “Innovation in wind turbine design,” Wiley, Note – this book has an entire chapter dedicated to “Cost of Energy.” ComponentCost fraction Blades0.177 Hub0.077 Gearbox0.143 Generator0.076 Yaw system0.019 Nacelle cover0.020 Nacelle structure0.040 Tower0.219 Variable speed system0.073 Pitch system0.043 Rotor brake0.006 Couplings0.003 Shaft0.041 Other0.063 Total turbine1.00 This is for capital (investment) costs. It is for a representative wind turbine design, but one should recognize that there are different designs. But it does provide some indication of relative splits among major wind turbine components.

Representative split - LCOE 17 Source: P. Jamieson, “Innovation in wind turbine design,” Wiley, Note – this book has an entire chapter dedicated to “Cost of Energy.” Initial capital costsTurbineRotorRotor lock Blades Hub Nacelle systemsGearbox Generator Rotor brake Nacelle cover Nacelle structure Couplings Shaft Yaw system Bearings Electrics and controlPitch system Variable speed system Tower Other Balance of plantRoads & civil works Electrics and grid con Assembly & insttlltn Transportation Foundations Financial and legal O&M0.180Labor Parts Operation Equipment Facilities0.0072