PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.

Slides:



Advertisements
Similar presentations
NTDC Projects for which Financing is Required
Advertisements

SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATED COST (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
AVAILABILITY BASED TARIFF SCHEDLING PROCEEDURE AND SETTLEMENT MECHANISM UNDER ABT REGIME T. SRINIVAS MANAGER,SRLDCBANGALORE.
1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION. 2 PROJECTS IN PROGRESS IN SOUTHERN REGION 400 KV MADURAI-TRIVANDRUM LINE WITH 400 KV SS AT TRIVANDRUM 400.
Quarterly Report on NTDC Development Projects
TRANSMISSION SYSTEM KERALA K ASOKAN DIRECTOR INSTITUTE FOR SUSTAINABLE DEVELOPMENT AND ENERGY STUDIES (InSDES)
Transmission System in India
Pallatana-Bongaigaon Transmission System. 2 Generation Project Summary  Pallatana (726.6 MW): being implemented by OTPC –Unit - 1 : Dec-2011 –Unit -
POWER GRID CORPORATION OF INDIA LTD
 POWERGID – PERSPECTIVE PLAN. POWERGRID – Introduction  POWERGRID, the Central Transmission Utility, is responsible for  Establishment and Operation.
WELCOME TO K. SWAMINATHAN, CHAIRMAN K. SREERAMA MURTHY, MEMBER
1 WORLD BANK MISSION. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN.
Sterlite Grid Limited Committed to the nation's mission to provide quality power for all.
POWER GRID CORPORATION OF INDIA LTD. An Overview of SOUTHERN REGION GRID OPERATION By D.K.Guru & S.P.Barnwal SRLDC, BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC,BANGALORE.
1 POWER GRID CORPORATION OF INDIA LIMITED BANGALORE.
POWER GRID CORPORATION OF INDIA LTD. SRLDC, BANGALORE PRESENTATION By L.K.Kanungo SOUTHERN REGIONAL GRID ON U.K.Verma &
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 139 TH SREB MEETING 19 TH DECEMBER 2005 HYDERABAD GRID EVENTS AND ISSUES.
POWERGRID Welcomes Hon’able Members of “Standing Committee on Energy”
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
1 DELEGATES FROM JAPAN. 2 INDIA POLITICAL MAP POPULATION :- 103 CRORES AREA :- 3,419 (‘000 SQ KM) STATES :- 29 UT :- 6 BIGGEST CITY :- MUMBAI WE ARE HERE.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE.
1 ALL INDIA GENERATION COMPOSITION Total Market Size = BU 1,27,110 MW.
1 REGIONAL GRIDS QUICK FACTS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 34,207.
Discussion on Draft Restoration (Black Start)procedures.
WELCOME TO CIGRE MEMBERS
S.P.KUMAR CM(SCADA-IT) SRLDC, POWER GRID
RAMAGUNDAM- HYDERABAD-KURNOOL- GOOTY LINE HOW EARLY COMMISSIONING WOULD HELP.
I SLANDING SCHEMES SOUTHERN REGION SRPC, Secretariat.
CHALLENGES IN INTEGRATING SR WITH NEW GRID V.S.Verma Member(CERC )
POWER GRID CORPORATION OF INDIA LTD.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 Operating the Power Grid: Current Scenario and Challenges Ahead V. K. AGRAWAL General Manager SRLDC, Bangalore 8 th November, 2006.
POWER GRID CORPORATION OF INDIA LTD.
LANDMARK EVENTS AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF AVAILABILITY BASED TARIFF ULDC SCHEME ULDC SCHEME ULDC SCHEME.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT SOUTHERN REGIONAL LOAD DESPATCH CENTRE BANGALORE.
Overall National Grid Development: Constraints & Options
SOUTHERN REGION EXPERIENCE
POWER GRID CORPORATION OF INDIA LTD
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
WELCOMES & CHAIRMAN & MEMBERS POWER GRID CORPORATION OF INDIA LIMITED
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
PRESENTATION ON TRIPPING SCHEMES OF TALCHER STAGE-II UNITS (4X500MW) IN THE EVENT OF TALCHER – KOLAR HVDC POLE(S) OUTAGE BY NATIONAL THERMAL POWER CORPORATION.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
1 AUDITORS. 2 SOUTHERN REGION WESTERN REGION EASTERN REGION NORTHERN REGION NORTH- EASTERN REGION INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :-
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
FREQUENCY EVENTS NTPC (INJECTION - DC) ISSUES NLY – II STAGE 1 (INJECTION - DC) NLY – II STAGE 2 (INJECTION - DC) NLY TPS I (Exp) (INJECTION - DC) ULDC.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
National Integrated Power Project Update Presentation to the Presidential Power Sector Workshop on May Niger Delta Power Holding Company Limited.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND % OF TIME FREQUENCY IN NORMAL BAND.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
SPECIFIC IMPROVEMENT IN SR IN RECENT PAST FREQUENCY IN NORMAL BAND – % OF TIME NORMAL VOLTAGES THROUGH OUT THE GRID SYSTEM STRENGTHENING –GAZUWAKA.
SOUTHERN REGIONAL LOAD DESPATCH CENTRE
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO SHRI U. C. MISRA Director (Personnel )
BANGALORE TRANSMISSION PLANNING
LOAD FLOW STUDIES TO DURING THE ABOVE PERIOD FOR EACH YEAR AND EACH QUARTER IN EACH YEAR MAXIMUM AND MINIMUM FREQUENCY OF A DAY.
UI SUMMARY BOTTLENECKS IN SR GRID RECENT GRID DISTURBANCES MERIT ORDER OCC PRESENTATION FGMO KAR DISTURBANCE REDUCING THE LOSSES IN GRID BUYING AND SELLING.
ENERGY CONSERVATION IN SR - A CASE STUDY
Sterlite Grid Limited Sterlite Grid Limited
REACTIVE POWER MANAGEMENT IN SOUTHERN GRID
REGIONAL GRIDS IN INDIA – QUICK FACTS
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
SPECIAL PROTECTION SCHEME FOR KOODANKULAM
ISSUE OF CONCERN.
EVACUATION STRATEGIES FOR KARWAR ULTRA MEGA THERMAL POWER PROJECT
PRESENTATION COVERS Past/Present Power Scenario Issues involved
PROJECTS IN THE PIPELINE IN SOUTHERN REGION
THE RPUF SCHEME KHAMMAM VIJAYAWADA NAGARJUNASAGAR HYDERABAD RAICHUR
Presentation transcript:

PROJECTS IN THE PIPELINE IN SOUTHERN REGION

PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS SYSTEM STRENGTHENING/ AUGMENTATION PROJECTS SYSTEM STRENGTHENING/ AUGMENTATION PROJECTS SYSTEM STRENGTHENING/ AUGMENTATION PROJECTS SYSTEM STRENGTHENING/ AUGMENTATION PROJECTS INTER REGIONAL PROJECTS INTER REGIONAL PROJECTS INTER REGIONAL PROJECTS INTER REGIONAL PROJECTS

GENERATION EVACUATION SCHEMES RAMAGUNDAM STAGE –III RAMAGUNDAM STAGE –III RAMAGUNDAM STAGE –III RAMAGUNDAM STAGE –III KOODANKULAM APP KOODANKULAM APP KOODANKULAM APP KOODANKULAM APP NEYVELI TS-II EXPANSION NEYVELI TS-II EXPANSION NEYVELI TS-II EXPANSION NEYVELI TS-II EXPANSION KAIGA STAGE -II KAIGA STAGE -II KAIGA STAGE -II KAIGA STAGE -II

RAMAGUNDAM STAGE - III RAMAGUNDAM-HYDERABAD D/C RAMAGUNDAM-HYDERABAD D/C HYDERABAD-KURNOOL S/C HYDERABAD-KURNOOL S/C KURNOOL – GOOTY S/C KURNOOL – GOOTY S/C GOOTY – NELAMANGALA S/C GOOTY – NELAMANGALA S/C LINES ESTIMATED PROJECT COST: RS 390 CRORES AP KAR RAMAGUNDAM HYDERABAD KURNOOL GOOTY NELAMANGALA

NEW PROJECTS ON THE ANVIL KUDANKULAM TRANSMISSION SYSTEM( 2000MW) LINES : = 950 Km. ESTIMATED COST = 1710 CRORES  KUDANKULAM-TIRUNELVELI 2 X 400 KV D/C LINES WITH 2 X 400 KV D/C LINES WITH QUAD (108 & 83 Km.) QUAD (108 & 83 Km.)  TIRUNELVELI-UDUMALPET D/C LINE WITH TWIN D/C LINE WITH TWIN MOOSE (300Km) MOOSE (300Km)  LILO OF BOTH CIRCUITS OF MADURAI-TRIVANDRUM LINE MADURAI-TRIVANDRUM LINE AT TIRUNELVELI ( 2 X 55 Km) AT TIRUNELVELI ( 2 X 55 Km)  EDAMON-MUVATTUPUZHA D/C LINE QUAD (150Km) D/C LINE QUAD (150Km)  TIRUNELVELI-EDAMON 400KV D/C LINE (110Km).  MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH QUAD CONDUCTORS (90Km) CONDUCTORS (90Km) T N KARNATAKA KERALA

NEW PROJECTS ON THE ANVIL KUDANKULAM TRANSMISSION SYSTEM( 2000MW) SUB-STATIONS  NEW 400/220KV SUBSTATIONS AT TIRUNELVELI, MUVATTUPUZHA MUVATTUPUZHA  AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE TRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/S TRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/S SUPPLEMENTARY TRANSMISSION SYSTEM  LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY AT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION AT AT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION AT KARAIKUDI (TAMILNADU) KARAIKUDI (TAMILNADU)  LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA 400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT 400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT HASSAN.(KARNATAKA) HASSAN.(KARNATAKA)

NEW PROJECTS ON THE ANVIL KAIGA 3 & 4 TRANSMISSION SYSTEM LINES : 413 Kms  MYSORE-KOZHIKODE D/C LINE  LILO OF KOLAR-SRIPERUMBADUR AT MELAKOTTAIYUR (40KM) AT MELAKOTTAIYUR (40KM)  NARENDRA-DAVANGERE D/C LINE SUB-STATION : 2 Nos. New  NEW 400/220KV SUBSTATION AT KOZHIKODE & MELAKOTTAIYUR KOZHIKODE & MELAKOTTAIYUR  2 ND 315MVA TRANSFORMER AT HIRIYUR S/S. HIRIYUR S/S.  BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) & HIRIYUR. HIRIYUR. COST ESTIMATE : 512 CRORES KERALAKERALA

NEW PROJECTS ON THE ANVIL NLC-TS-II EXPANSION TRANSMISSION SYSTEM LINES : 467 Km.  2 NOS. 400KV S/C LINES FROM NEYVELI-TS-II (EXISTING) NEYVELI-TS-II (EXISTING) TO NLC TS-II (EXPAN) (8 KM). TO NLC TS-II (EXPAN) (8 KM).  NEYVELI-PUGALUR D/C LINE  PUGALUR-MADURAI D/C LINE  UDUMALPET-ARASUR D/C LINE  LILO OF NEYVELI-SRIPERUMBU- DUR LINE AT PONDY. DUR LINE AT PONDY. SUB-STATION  NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR & PONDICHERRY. PONDICHERRY. COST ESTIMATE : 721 CRORES T N KERALAKERALA KARNATAKA

SYSTEM STRENGTHENING SCHEMES 400 KV D/C KAIGA-NARENDRA 400 KV D/C KAIGA-NARENDRA 400 KV D/C MADURAI-TRIVANDRUM 400 KV D/C MADURAI-TRIVANDRUM 400 KV D/C NELMANGALA-SOMANAHALLI 400 KV D/C NELMANGALA-SOMANAHALLI 400 KV D/C RAICHUR-GOOTY LINE 400 KV D/C RAICHUR-GOOTY LINE LILO OF SRISAILAM-NUNNA AT N’SAGAR LILO OF SRISAILAM-NUNNA AT N’SAGAR LILO OF N’SAGAR-RAICHUR AT MEHBOOBNAGSR LILO OF N’SAGAR-RAICHUR AT MEHBOOBNAGSR LILO OF NELLORE-MADRAS D/C AT ALMATHI LILO OF NELLORE-MADRAS D/C AT ALMATHI 2X315 MVA, 400/220 KV SS AT ALMATHI 2X315 MVA, 400/220 KV SS AT ALMATHI

INTER REGIONAL SCHEMES 2 ND POLE AT GAZUWAKA ASSOCIATED SCHEMES ASSOCIATED SCHEMES PROVIDING 50% SERIES COMPENSATION ON JEYPORE GAZUWAKA LINE AT JEYPORE END PROVIDING 50% SERIES COMPENSATION ON JEYPORE GAZUWAKA LINE AT JEYPORE END GAZUWAKA-NUNNA D/C LINE WITH 63 MVAR LINE REACTOR AT BOTH ENDS GAZUWAKA-NUNNA D/C LINE WITH 63 MVAR LINE REACTOR AT BOTH ENDS AP ERER JEYPORE GAZUWAKA