The Future of Nuclear Power: Renewal or Re-run? David Lochbaum Director, Nuclear Safety Project February 25, 2008.

Slides:



Advertisements
Similar presentations
New Reactors: NRC Plans, Process, and Progress David B. Matthews Director Division of New Reactor Licensing February 28, 2008.
Advertisements

Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
USHA Autumn Seminar in association with AUDE A Presentation by Richard Habgood APS President Thursday, 12 th September 2013.
1 Extension of Construction Authorization for the Mixed Oxide Fuel Fabrication Facility David Tiktinsky Senior Project Manager Division of Fuel Cycle Safety,
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
RETS – REMP Workshop NRC Activities June 25, 2007 Presented by Steve Garry.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Tritium. Bldg Site of SNAP8ER Reactor Accident.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
1 GAO Study on Radioactive Waste Management Scenarios Ric Cheston US Government Accountability Office (GAO)
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
What are we afraid of? How do we overcome our fears to promote clean energy? Patrick Pocock NUCLEAR ENERGY.
Safety of Nuclear Power Reactors Final Presentation ESL Fall 2006 Anatoliy Borodin.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Rated # 1 “BEST PLACES TO WORK IN THE FEDERAL GOVERNMENT” Dale A. Powers US Nuclear Regulatory Commission.
The 20th and 21st Centuries: The Modern Era
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
Westinghouse Operational Experience and Prospects for New Build
Transportation of Radioactive Material in the United States Earl P. Easton.
Nuclear Power in the 21 st Century Crystal Ball or Rearview Mirror? David Lochbaum Director, Nuclear Safety Project March 26, 2008.
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
AP Environmental Nuclear Energy. NUCLEAR ENERGY When isotopes of uranium and plutonium undergo controlled nuclear fission, the resulting heat produces.
Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519 (1978) Strategic Delay in Derailing Public Policy.
1 Attributes of a Successful Nuclear Construction Project – A Regulator’s Perspective Victor M. McCree Deputy Regional Administrator for Operations U.S.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
1 American Society of Quality September 20, 2005 Presented by Linda Smith USNRC Region IV.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
Sustained Reliability U.S. Nuclear Plant Average Capacity Factor 91.1% in % in % in % in % in % in %
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
The Reactor Oversight Process: Development and Results Tom Houghton Nuclear Energy Institute September 20, 2005.
1 Nuclear Energy Division MIT Report on the Future of Nuclear Power in the United-States : review and discussion Eric Proust Director, Industrial Affairs.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD.
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
Energy and the Environment. Background Americans only make up 5% of world’s population but consume 20% of its energy Americans only make up 5% of world’s.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
Nuclear Power Reactors
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519 (1978) Strategic Delay in Derailing Public Policy.
New Plant Regulatory Issues Kati Austgen Washington International Representatives Meeting July 12, 2012.
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
Japanese Nuclear Accident And U.S. Response April 20, 2011.
UCL ENERGY INSTITUTE UK Energy Policy: Late Lessons from Fukushima Westminster, Dr Paul Dorfman.
Nuclear Power Plant Basics
Transportation of Radioactive Material in the United States
South Carolina Perspective on Part 61 Proposed Revisions
Industry Guidance on Part 21 Evaluation and Reporting
Nuclear Power Public safety concerns and the costs of addressing them have constrained the development and spread of nuclear power in the United States,
Nuclear Power Update for The Society of American Military Engineers
Offerings for design safety from harmonization
NRC Cyber Security Regulatory Overview
Research and Test Reactor Safety: The Regulatory Perspective
Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519 (1978)
San Onofre.
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
GNI Advanced Reactors Security Analysis & Findings
Anna Bradford, Deputy Director Division of New Reactor Licensing
Japanese Nuclear Accident And U.S. Response
LEARNING OBJECTIVES The key objectives of this lecture are to familiarize the workshop participants with the: Different stages of the licensing process.
Presentation transcript:

The Future of Nuclear Power: Renewal or Re-run? David Lochbaum Director, Nuclear Safety Project February 25, 2008

Slide 2 Reactor design issues: Undetected design errors 21 st century threats New design problems New design solutions New reactor licensing Nuclear’s past (really passed or just paused?) Agenda (Not Hidden)

UCS’s recent report concluded that NRC’s regulations are generally adequate. The safety bar is okay – too many reactors too often are doing the limbo below it. Background: Nuclear Safety Limbo

NRC’s Double Standard Examples (very abridged list): PWR containment sumps (GSI-191), Thermo-Lag and Hemyc fire barriers, uncontrolled and unmonitored leaks of contaminated water

Old Reactor Designs, Bad Reactor Designs In May 1996, the NRC reported that the Millstone nuclear plant had long been operating outside of their design bases. Follow-up NRC inspections and efforts documented that Millstone was not alone.

Old Reactor Designs, Bad Reactor Designs The NRC documented that hundreds of design errors in “new plants” were not detected until after the reactors had operated for years and years. Why did the design reviews, pre-operational testing, and subsequent surveillance tests and inspections ALL fail to detect these hundreds of design errors?

Old Reactor Designs, Bad Reactor Designs How were they detected? Fewer than half were reported found due to intentional, active looking. Luck seems to play a big role.

Old Reactor Designs, Bad Reactor Designs Lest anyone think that the “design errors” merely involved green paint vice red paint, Licensee Event Reports (LERs) are submitted for issues above a safety significance threshold and accident sequence precursors are an even higher threshold.

Old Reactor Designs, Bad Reactor Designs

If new nuclear power reactors are built and operated in the US, the design review, pre-operational testing, and post- licensing surveillance testing and inspection processes must produce the following outcomes: 1)Significantly fewer design errors detected AFTER the reactors commence operation 2)Significantly shorter residence periods for undetected design errors. Fewer undetected design errors and shorter “hiding” times translate into safer, more economical nuclear energy.

21 st Century Threats, 18 th Century Defenses Following the 9/11 tragedy, the NRC undertook what it termed a “top to bottom” review of security for nuclear power reactors. Shortfalls identified by that review were addressed by Order and revised regulations. Curiously, a review triggered by terrorists using suicide aircraft attacks resulted in Orders and regulations which assume a zero percent chance of aircraft attack. Like Paul Revere and the Minute Men, nuclear power reactors only defend against attacks by land and by sea.

21 st Century Threats, 18 th Century Defenses

Nearly 25 years ago, the NRC chartered an industry panel to examine design changes that would make nuclear power reactors less vulnerable to sabotage. The panel identified many feasible design changes – none of which have been incorporated into “advanced” reactor designs like the AP-600, AP-1000, ABWR, etc. To the extent practical and feasible, nuclear power reactors built in the 21 st century must be designed against 21 st century, not 18 th century, threats.

New Reactor Designs, Bad Reactor Designs? AP-1000: To save money, vendor cut way back on concrete and steel. The result is a ratio of containment volume to thermal power below that of today’s PWRs, thereby increasing the risk of containment over-pressurization and failure in event of a severe accident. PBMR: To save even more money, vendor replaced containment structure with less-robust “confinement” structure that will protect the public from an accident unless there is an accident.

New Reactor Designs, Bad Reactor Designs? Generation IV: While the Gen IV reactor designs remain largely conceptual, these concepts rely on two shaky foundation supports – (1) need for uninvented, super- resistance materials, and (2) fuel reprocessing and fast breeder reactors.

New Reactor Designs, Good Reactor Designs? The EPR design appears to be the safest and most secure design among the new reactor designs.

New Reactor Designs, Good Reactor Designs? The EPR design is resistant to aircraft hazards.

New Reactor Designs, Good Reactor Designs? Even the spent fuel pool is resistant to aircraft hazards.

New Reactor Designs, Good Reactor Designs If another nuclear power reactor is built in the US, it must be protected from aircraft hazards to the maximum extent by design features and to the minimum extent by compensatory measures by workers (i.e., fire hose brigades).

New Reactor Licensing Slide 20 The “old” reactor licensing process featured two steps: 1)NRC issuance of a construction permit based upon review of preliminary design information 2)NRC issuance of an operating license based upon review of final design information The “new” reactor licensing process features a single step – NRC’s authorization to build and then operate the reactor.

New Reactor Licensing Slide 21 The “old” reactor licensing process featured information on a specific reactor design to be constructed at a specific site. The “new” reactor licensing process is bifurcated: The NRC certifies a new reactor design without any clue where that reactor might be constructed and operated. The NRC approves a site for a nuclear reactor without any clue of which specific design might be constructed.

New Reactor Licensing Slide 22 “One-step” reactor licensing is at best misleading and at worst an outright lie. By splitting the new reactor licensing process into two separate and distinct parts, the NRC essentially – and we believe intentionally – eliminated meaningful public participation. Who is going to intervene in the certification process for a reactor that may or may not be built in their backyard? Who can intervene in the site permitting process for an unspecified reactor? No one. By design.

Public Participation “No evidence has been found to support industry statements that citizen opposition and regulatory changes have been the primary causes for rising costs, and construction delays.” US House Committee on Government Operations

Nuclear Numbers Nuclear reactors ordered 253 Construction permits issued 175 Operating licenses issued 130 Operating licenses ended 26 Sources: NEI & NRC

Nuclear Numbers 45 of the reactors issued construction permits by the NRC (AEC) were not completed. At least not as nuclear reactors. The Midland and Zimmer plants were completed as fossil-fueled generators.

Walking a Nuclear Tightrope Slide 26 Full report and the 51 year-plus reactor outage case studies available at: Walking a Nuclear Tightrope: Unlearned Lessons from Year-plus Reactor Outages released by UCS on September 18, of the nuclear power reactors licensed by the NRC (AEC) experienced year-plus outages to restore safety levels – 10 reactors did it twice!

Industry Participation “To the contrary, FPC [Federal Power Corporation] statistics show that mismanagement is more of a determinant than regulatory changes and citizen opposition.” US House Committee on Government Operations Mismanagement was a problem during construction. Mismanagement was a problem during operation. Mismanagement will be a challenge during construction and operation of new reactors – time will tell whether that challenge will be successfully met.