EXISTING OVERALL PLAN | UICN Plant 3 and Willow Creek Golf Course Figure 1 – Existing Overall Plan Legend Lien Holder (498,584 SF or 12 Acres) UICN (7,000,103.

Slides:



Advertisements
Similar presentations
Edwardsport IGCC Mine Stabilization Project Construction at the Largest Remediation Mine Grouting Project in North America Presented by: Howard Concrete.
Advertisements

Sea Level Rise 2014 City Council Update
The CSO Abatement Project Presented by: Paul Nordstrom Director of Operations and Engineering.
Wastewater Treatment Plant City Of Valentine FRANK X. SPENCER & ASSOCIATES Consulting Civil Engineers & Land Surveyors INTERNSHIP PROJECT PRESENTATION.
Treatment of Slaughterhouse Wastewater
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
City of Black Hawk Water HammerSeptember 2002 Arber Water Hammer Travis Meyer, P.E. Richard P. Arber Associates.
COLEGIO CRISTIANO AVIVANDO EL FUEGO
PUBLIC SCOPING MEETING Draft Environmental Impact Report for the SEWER AUTHORITY MID-COASTSIDE (SAM) WET WEATHER FLOW MANAGEMENT PROJECT August 28, 2007.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
October 20-21,2009 Agenda Item 6a.. Ohio River CSO Communities Pennsylvania – 10 communities West Virginia – 10 communities Ohio – 10 communities Kentucky.
1 Water and Wastewater System Information. 2 PWCSA Water Purchase Key Points From April 21, 2008 Meeting With PWCSA PWCSA is willing to re-open discussions.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Florida Water Forum Everglades Restoration June 3, 2011.
Wastewater Storage Pond Design
Pond and Wetland BMPs, Retrofitting Detention Basins.
Managing Water Shortage for Livestock Operations Shawn Shouse ISU Extension Ag Engineer.
Lei NA Xiaolong Chen. Historical Background  In 1956, Basin F was constructed by the Army in the northeast section of RMA in Colorado.  It was designed.
BOB BROZ UNIVERSITY OF MISSOURI EXTENSION (573) ISE #78 WATER MANAGEMENT STRATEGIES FOR DROUGHT MITIGATION AND SUSTAINABLE AGRICULTURAL PRODUCTION.
Wastewater Treatment & Collection System Improvements.
Spokane River Forum 23 May 2011
Cornerstone Engineering Group The Foundation for Your Civil Engineering Needs Camanche Reservoir Water Treatment Plant Project Cecilia Zamora Evangelina.
POTABLE WATER CVEN 451 Term Project. Demand Estimate Water Use Average Flow (GPD/Capita ) # of People ADD (GPD ) MDD^ (ADD*2.4) PHD^ (MDD*1.85) Residential.
Proposed Improvements to the Water System Infrastructure in the Anacostia Area of Washington, D.C. November 20, 2002 Prepared by Prepared for Our Customers,
WESTERN CARY WATER STORAGE TANK Town of Cary Preliminary Engineering Report Progress Meeting June 8, 2015.
Nutrient Inventory and Storage and Handling (Planner Training) John W. Worley.
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
Water Treatment & Distribution System Overview.
July Middle Fork Project Additional Information Potential Project Betterments to be evaluated during Relicensing July 2006.
City of West Linn Bolton Reservoir Replacement Planning Commission Hearing July 1, 2015 Presented by: Thomas P. Boland, P.E. Murray, Smith & Associates,
ELK MEADOWS HOA Water Master Plan (Supply, Treatment, Distribution, and Storage) May 2005.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
STORM WATER STORAGE AND TREATMENT
CE 3372 Water Systems Design
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Construction OF AMMONIA REMOVAL UPGRADES FOR FIRST BROAD RIVER WWTP
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
CE 3372 Water Systems Design
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
1 Town of Taghkanic Highway Department Highway Facility Addition and Salt/Sand Storage.
Foxfire Village Water Service from Moore County Foxfire Village Council Meeting April 11, 2013.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
Kevin Colvett, P.E. Nashville Corrective Action Plan and Engineering Report, Phase III for Metro Water Services and the City of Brentwood, TN Presentation.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
Santa Rita Wastewater Treatment Plant Alternative Site Investigation Addendum Sawmill Road Site.
Town Branch Wet Weather Storage Public Information Meeting February 19, 2014 Lexington Fayette Urban County Government Division of Water Quality.
1 CTC 450 Review WW Sludge Processes. 2 Objectives Understand the basics with respect to operation of wastewater systems.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Water Filtration Plant Improvements Project Summary
CTC 450 Review WW Sludge Processes.
26 – Wastewater Conveyance System Design 2
Florida Gulf Coast Marine Fisheries Enhancement Center
LAS VEGAS VALLEY WATER DISTRICT
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Storm Water Storage and Treatment
10TR Nominal Glycol Chiller
Bay Ridge & Gum Bayou P.E.R.
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Septage Management Options
Big Sky Wastewater Facility Plan Update
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Columbia Basin Project Water Conservation
Big Sky Wastewater Facility Plan Update
Figure 11-1.
Figure Overview.
Kastanis- Existing Conditions
Figure Overview.
Presentation transcript:

EXISTING OVERALL PLAN | UICN Plant 3 and Willow Creek Golf Course Figure 1 – Existing Overall Plan Legend Lien Holder (498,584 SF or 12 Acres) UICN (7,000,103 SF or 161 acres) WWTP (103,446 SF) EXISTING PRIMARY EFFLUENT POND EXISTING UICN PLANT 3 EXISTING OVERFLOW PONDS EXISTING WILLOW CREAK GOLF COURSE PUMP STATION EXISTING LAKEVIEW GOLF COURSE PUMP STATION EXISTING TWIN PONDS EXISTING TWIN PONDS PUMP STATION EXISTING POND EMERGENCY OVERFLOW POND EMERGENCY OVERFLOW PONDS

EXISTING ENLARGED SITE PLAN | UICN Plant 3 and Willow Creek Golf Course Figure 2 – Existing Enlarged Site Plan UICN PLANT 3 WWTP OVERFLOW RESERVOIR #2 (OR #2) MAX POOL EL=2614 STORAGE CAPACITY=2.51 AC FT TOB EL=2615 INV OUT EL=2609 OVERFLOW RESERVOIR #1 (OR #1) MAX POOL EL=2614 STORAGE CAPACITY=1.37 AC FT TOB EL=2615 INV IN EL=2606 INV OUT EL=2608 PRIMARY EFFLUENT RESERVOIR (PER) MAX POOL EL=2614 STORAGE CAPACITY=2.65 AC FT TOB EL=2615 INV OUT EL=2610 WILLOW CREEK GOLF COURSE PUMP STATION EL=2619 LAKEVIEW GOLF COURSE PUMP STATION EL=2619 Existing 24-inch PVC Outfall Existing 16-inch PVC Overflow Line Existing 16-inch PVC Overflow Line PER OR#1 OR#2 Total existing storage capacity estimated to be 2,127,820 gallons (per Kevin Tucker Design Group, Drawing C-4 of Phase Three Interim Solution Plans dated August 29, 2012). Legend Lien Holder UICN WWTP

EXISTING OVERVIEW – Option #1 | UICN Plant 3 and Willow Creek Golf Course Figure 1 – Existing Overall Plan Legend Lien Holder (498,584 SF or 12 Acres) UICN (7,000,103 SF or 161 acres) WWTP (103,446 SF) EXISTING PRIMARY EFFLUENT POND EXISTING UICN PLANT 3 EXISTING OVERFLOW PONDS EXISTING WILLOW CREAK GOLF COURSE PUMP STATION EXISTING LAKEVIEW GOLF COURSE PUMP STATION EXISTING TWIN PONDS EXISTING TWIN PONDS PUMP STATION EXISTING POND EMERGENCY OVERFLOW POND EMERGENCY OVERFLOW PONDS

ENLARGED SITE PLAN – Option #1 | UICN Plant 3 and Willow Creek Golf Course Figure 3 – Enlarged Site Plan Option #1 UICN PLANT 3 WWTP PRIMARY EFFLUENT RESERVOIR (PER) MAX POOL EL=2614 STORAGE CAPACITY=3.0 AC FT TOB EL=2615 INV OUT EL=2610 WILLOW CREEK GOLF COURSE PUMP STATION EL=2619 LAKEVIEW GOLF COURSE PUMP STATION EL=2619 Existing 24-inch PVC Outfall PER Option #1 – New Storage Pond, Remediate PER, Abandon OR#1 and OR#2 Construct new PER-1 of approximately 4.0 AC FT or 1.3 MG Improve booster stations and install new connection to existing wetwells from PER-1; install new overflow line from PER-1 to PER Remediate PER Add valves to isolate either PER from plant outfall and pump stations Total storage volume would match existing volume ~ 2.1 MG PER AC FT Legend Valve Lien Holder UICN WWTP

EXISTING OVERVIEW – Option #2 | UICN Plant 3 and Willow Creek Golf Course Figure 1 – Existing Overall Plan Legend Lien Holder (498,584 SF or 12 Acres) UICN (7,000,103 SF or 161 acres) WWTP (103,446 SF) EXISTING PRIMARY EFFLUENT POND EXISTING UICN PLANT 3 EXISTING OVERFLOW PONDS EXISTING WILLOW CREAK GOLF COURSE PUMP STATION EXISTING LAKEVIEW GOLF COURSE PUMP STATION EXISTING TWIN PONDS EXISTING TWIN PONDS PUMP STATION EXISTING POND EMERGENCY OVERFLOW POND EMERGENCY OVERFLOW PONDS

ENLARGED SITE PLAN – Option #2 | UICN Plant 3 and Willow Creek Golf Course Figure 4 – Enlarged Site Plan – Option #2 UICN PLANT 3 WWTP WILLOW CREEK GOLF COURSE PUMP STATION EL=2619 LAKEVIEW GOLF COURSE PUMP STATION EL=2619 Existing 24-inch PVC Outfall Option #2 – New Storage Tank, Abandon PER, OR#1 and OR#2 Construct 2.1 MG storage tank (120 ft dia) or pair of 1 MG storage tanks (60 ft dia each) Improve booster stations and install new connection to existing wetwells from storage tanks Legend Valve Lien Holder UICN WWTP

EXISTING OVERVIEW – Option #3 | UICN Plant 3 and Willow Creek Golf Course Figure 1 – Existing Overall Plan Legend Lien Holder (498,584 SF or 12 Acres) UICN (7,000,103 SF or 161 acres) WWTP (103,446 SF) EXISTING PRIMARY EFFLUENT POND EXISTING UICN PLANT 3 EXISTING OVERFLOW PONDS EXISTING WILLOW CREAK GOLF COURSE PUMP STATION EXISTING LAKEVIEW GOLF COURSE PUMP STATION EXISTING TWIN PONDS EXISTING TWIN PONDS PUMP STATION EXISTING POND EMERGENCY OVERFLOW POND EMERGENCY OVERFLOW PONDS

ENLARGED SITE PLAN – OPTION #3 | UICN Plant 3 and Willow Creek Golf Course Figure 3 – Enlarged Site Plan Option #3 UICN PLANT 3 WWTP OVERFLOW RESERVOIR #2 (OR #2) MAX POOL EL=2614 STORAGE CAPACITY=2.51 AC FT TOB EL=2615 INV OUT EL=2609 OVERFLOW RESERVOIR #1 (OR #1) MAX POOL EL=2614 STORAGE CAPACITY=1.37 AC FT TOB EL=2615 INV IN EL=2608 INV OUT EL=2606 PRIMARY EFFLUENT RESERVOIR (PER) MAX POOL EL=2614 STORAGE CAPACITY=3.30 AC FT TOB EL=2615 INV OUT EL=2610 PROPOSED OUTFALL OF DIVERSION LINE INV ”x12” GATE VALVE WILLOW CREEK GOLF COURSE PUMP STATION EL=2619 LAKEVIEW GOLF COURSE PUMP STATION EL=2619 SEDIMENT BASIN FORE BAY WITH SPILLWAY Option #3 – Remediate Ponds in Place Install temporary line to OR#2 (A) Install temporary suction to booster pump stations (B) to withdraw from OR#1 and OR#2 Remediate PER and improve booster pump stations Abandon line (B) and use rehabilitated PER Install diversion line to OR#2 (C) Plug overflow line from PER to OR#1 Remediate OR#1 Plug overflow line from OR#1 to OR#2 Remediate OR#2 Abandon in place line (A) and (C) Existing 24-inch PVC Outfall Existing 16-inch PVC Overflow Line Existing 16-inch PVC Overflow Line PER OR#1 OR#2 A A B B C C Legend Valve Lien Holder UICN WWTP

ANALYSIS OF OPTIONS | UICN Plant 3 and Willow Creek Golf Course Table 3 – Analysis of Options OptionAdvantagesDisadvantages Preliminary Opinion of Construction Costs Operating Costs 1. New Storage Pond, Remediate PER, Abandon OR#1 and OR#2 Least complex construction Opens space for other use through abandonment of OR#1 and OR#2 Aesthetically pleasing In progress 2. New Storage Tank, Abandon PER, OR#1 and OR#2 Reduced maintenance (eliminates pond maintenance) Highest construction cost Least aesthetic alternative In progress 3. Remediate Ponds in Place Complicated construction Least optimal use of space UICN Land Remediation NA In progress