Radiation-protection experience at Belle / summary of beam abort system 22 September, 2003 T.Tsuboyama (KEK)

Slides:



Advertisements
Similar presentations
Background issues in the KEKB
Advertisements

Vibration issues for SuperKEKB M. Masuzawa, R. Sugahara and H. Yamaoka (KEK) Vibration issues for SuperKEKB (IWAA2010)
Plot Approval Yat Long Chan (CUHK) Igor Mandic (Ljubljana) Charlie Young (SLAC)
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Fiber-Optic Communications
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
PEP-II Status and Outlook John T. Seeman For the PEP-II Team SLAC EPAC Meeting June 12, 2003.
Machine Detector Interface Summary Junji Haba, KEK.
DORIS - 2 GeV Experiences in 2011 Olympus Collaboration Meeting April 27th, 2011 F.Brinker.
ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)
Dark Current Measurements and Simulations Chris Adolphsen 2/4/15.
Progress of SC RF Cavity during the RF Group May 10, 2007.
Operational Experience with machine backgrounds at KEKB 23 September 2003 T.Tsuboyama (KEK)
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
Semi-conductor Detectors HEP and Accelerators Geoffrey Taylor ARC Centre for Particle Physics at the Terascale (CoEPP) The University of Melbourne.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
W. KozaneckiIR summary, BES-III workshop Interaction Region: a terse summary  Accelerator issues  Parameter comparison with PEP-II/KEKB  IR layout 
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
SILICON DETECTORS PART I Characteristics on semiconductors.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
RHIC Run14 Time Meeting. Run14 Status – Apr. 29 Operations running well, 11 full stores over the past 7 days; setting STAR ZDC rates to 50 khz is now.
IP-BPM status Siwon Jang KNU. Contents The electronics repair status –Repair work status –Electronics RF test (by using Oscilloscope) –Electronics shipment.
IPHC-LBNL meeting 3-5 April 2008 Radiation damage in the STAR environment and performance of MAPS sensors Compilation of different test results mostly.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
F AcceleratorDivision Introduction to RF for Particle Accelerators Part 2: RF Cavities Dave McGinnis.
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
LHCb Vertex Detector and Beetle Chip
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
Experimental Study of the BEPC Ⅱ Backgrounds JIN Da-Peng IHEP, Beijing, China Representing the Backgrounds Study Group May 11, 2007, BEPC Ⅱ IMAC Meeting.
Commissioning of REX Jose Alberto Rodriguez, BE-OP-PSB (167538) on behalf of the ISOLDE operations team.
9/6/2007 PEP-II LER RF High Current MD Report Dan Van Winkle, Claudio Rivetta, Kirk Bertsche, Themis Mastorides.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Setting BLM Limits in the Booster The Booster is now delivering all the protons needed by the collider program, and about 40% of the protons needed by.
KEKB crab RF architecture & controls K.Nakanishi KEK Dec. 16, 2010 LHC-CC10 1.
TE-MPE-CP, RD, LHC risk review 06-Mar R. Denz TE-MPE-CP Radiation Hardness of Cold By-pass Diodes Acknowledgements: D. Hagedorn (former project.
Beam Background Simulation at Belle/KEKB Motivation SR background Particle background Feedback to the detector design SR alarm Summary O. Tajima (Tohoku.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Accuracy of the orbit measurement by KEKB BPM system for the study of ILC damping ring H. Fukuma (KEK) Requirement for the accuracy of BPM data.
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Halo Collimation of Protons and Heavy Ions in SIS-100.
RF acceleration and transverse damper systems
KEK news ( ) S.Tanaka.
Failure analysis at BEPCII
SNS Operational History
Introduction to the Backgrounds Study in the BEPCⅡ/BESⅢ
The PEP-II Interaction e+e- Factories Workshop
PEP-II Status and Plans e+e- Factories Workshop
Vertex Detector Overview Prototypes R&D Plans Summary.
Radiation Abort Policy
Luminometer Integration at IR2
Sunday/Monday & :30 Stable beams. Fill #1851.
Performance Recovery at CEBAF
Accelerator R&D Results from the B-factory
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
BEPCII Background Issues: Collimators and Masks
Tuesday 20 September 2011.
Longitudinal Focusing & The Gamma Transition
Presentation transcript:

Radiation-protection experience at Belle / summary of beam abort system 22 September, 2003 T.Tsuboyama (KEK)

Purpose of Beam abort system (1)Protection of Belle/SVD (silicon vertex detector). Belle SVD (1999) was made with VA1 (1.4 um), which can survive up to 1 Mrad dose. Even in the first year of KEKB operation, when beam current was much lower than now, SVD sometimes suffered a few krad dose in one beam loss. When large background enters the silicon sensor and preamplifier, the huge charge flowing into the readout chip causes serious damage to the front end amplifiers and can degrades its performance at once. –Fatal single event latch up, fortunately, has not happened. When KEKB beam is lost close to Belle, KLM (IFR for Babar) suffers large charge and its readout system tripped often.

Purpose of Beam abort system (2) Protection of Movable masks Movable masks are installed to reduce the background to Belle. Serious damages to masks happened when beam got out of control. –Some masks can effectively reduce Belle background when they are adjusted close (a few mm?) to the beam orbit. When beam becomes unstable, the high-current beam can hit such a mask directly. –The electro-magnetic shower leaves huge heat in the mask head and damages the mask at once. –Once a movable mask is damaged, the operation condition of KEKB for enough beam life and quiet background condition becomes narrow. Replacement of movable masks requires a few months preparation and one to two days KEKB shutdown.

Beam abort statistics Rate: 5-7 per day The rate depends on accelerator conditions Abort sources –RF --- Klystron and Cavity –Beam loss --- Ionization chamber and Silicon PIN diodes in the tunnel –Belle abort: PIN diodes close to the SVD readout chip –Earth quake RF Beam loss Manual

Abort request from RF: Beam phase abort The phase between the accelerating RF field and beam bucket (beam phase) is used in the feed back loop of the KEKB RF system. When the normal accelerator condition is lost, (for example when more than two RF stations trip) the deviation of the beam phase in another RF system becomes larger than normal level and the beam will be out of control in a short time. Even 0.5 % of beam-energy deviation, the beam can hit movable masks and can cause damages to masks and SVD.

Beam phase abort (cont.) Since 2001, beam-abort is requested when the beam phase becomes out of control. RF voltage of SC cavity is also used as a beam-abort source. The beam can be discarded before the unstable beam damages movable masks and the Belle detector. Since then, the frequency of beam loss with high dose to Belle and movable mask accidents decreased significantly.

Beam abort due to beam loss There are cases BPA can not predict fatal beam instability. Total of m-length ionization chambers in installed the KEKB tunnel. PIN diode monitors are installed around movable masks. PIN diode monitors are also installed on the interaction-point beryllium chamber of Belle in order to protect Belle/SVD. These monitors request aborts when the background increases. –There are some occasions when background enters to Belle while the KEKB operation is not influenced. –Dust trapping –Vacuum leak around IR –Bad setting of movable masks –Bad injection condition –Relatively low but persistent background. (decided by software)

Belle/SVD radiation monitor On each probe, 3 sensors are integrated. RADFET (dose integration) PIN diode (high gain) PIN diode (Low gain) RTD 16 hybrids were installed –8 close to the IP chamber –8 close to the readout chip

PIN diode readout There are two independent sensors and circuits. –In normal operation, the radiation level is ~10 mrad/sec. –We would like to abort beam immediately when background becomes extremely high, 100 rad/sec for example. –In order to meet the requirement, two diodes are used in each probe and read out independently. –The software-abort request is sent if the radiation dose in 1 minute exceeds 10 rad. Bias voltage is not applied to PIN diodes. –Pro: Small temperature dependence of the offset level. –Con: The natural depletion depth becomes shallower according to integrated dose, gain correction after irradiation is necessary

Diagnostics of beam loss The beam current, beam phase, vertical and horizontal orbits of beam are recorded with oscilloscopes and fast data loggers at every beam abort. The KEKB operators diagnose the reason of the beam loss. Typical beam phase abort The beam loss starts before the beam phase shifted. Yellow ---beam phase Cyan --- RF power Green ----beam current Magenta --- abort request

Another example First a beam loss happened long before than this figure, then the beam phase starts oscillation. The beam is aborted when the phase exceeded the limit. The loss monitor outputs started increase just before the beam abort.

Vacuum “burst” causes beam-phase change In this case, the vacuum increased suddenly in a vacuum chamber. The beam lost its energy. The feed back system shifted to the phase to recover the accelerating energy. Since the recovery is not successful, the beam could not be held. The beam phase changed significantly before the beam was lost. Vacuum level

Summary After the installation of “beam-phase abort (BPA)”, the rate of accidents to movable mask and Belle due to lost beam reduced significantly. The rate of BPA is 0.5 to 1 times per day. Abort due to beam-loss monitors in the tunnel, close to the movable masks and close to Belle/SVD helps to abort the beam before whole beam is lost in the ring and Belle. The RF monitor data, beam monitor data and loss monitors are recorded by fast data loggers and oscilloscopes at each beam abort. Analysis of the logged data is indispensable for understanding the reason of beam instability and for determining how to reduce damages to the KEKB and Belle.