Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that no longer.

Slides:



Advertisements
Similar presentations
Garfield graphics are copyrighted and reproduced with kind permission of PAWS Inc. All rights reserved Nuclear Power – Safety (Part 1)
Advertisements

Waste Management System in Egypt Owner (Generator) Regulator RWM Operator Justification Minimization Segregation Transportati on Treatment Conditioning.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Fabien Elie and Will Wicks : Established as a plutonium production site. Before the Manhattan project, farm land : Deactivation as a nuclear.
Visaginas, 2008 INPP Decommissioning Strategy, Programme, Licensing.
Nuclear Power. Source: Uranium-235 Process: – An unstable uranium nucleus is bombarded with a neutron and splits into two smaller nuclei and some neutrons.
By Siouxsie Downs & Tyler Menger. Here is the basic design…
In this lesson What is nuclear power ? What is used for fuel ? What are the side effects ? Where are nuclear power plants ? Are their any power plants.
The Harnessed Atom Lesson Seven Waste from Nuclear Power Plants.
Long Term Storage, The Failure of the Federal Government, and NIMBY.
Nucular Waste A Technical Analysis Ian Baird 5/12/08.
Non-renewable Power Resources: Nuclear Power
NUCLEAR ENERGY What is it? David J. Diamond Energy Sciences & Technology Department February 2009.
Nuclear Energy Targets: Explain how the nuclear fuel cycle relates to the true cost of nuclear energy and the disposal of nuclear waste. Describe the issues.
Safety of Nuclear Power Reactors Final Presentation ESL Fall 2006 Anatoliy Borodin.
NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED NUCLEAR FUEL CYCLE PLANTS OF ENEA AND FN TO BE DECOMMISSIONED FN INDUSTRIAL FUEL FABRICATION.
Decommissioning Nuclear Reactors. Background Before a company decides to close it’s power reactors the facility must be put in to a state that it no longer.
MODULE “STRATEGY DEVELOPMENT”
Chapter 12 Nuclear Energy. Overview of Chapter 12 o Introduction to Nuclear Power Atoms and radioactivity Atoms and radioactivity o Nuclear Fission o.
Nuclear Reactors Health Physics Society - Power Reactor Section Radiation Science Education.
RUBY REVELES PERIOD 3 4/14/11 Solar & Nuclear Energy.
Nuclear Power. it’s neither safe nor clean If a meltdown should occur, the accident could kill and injure a lot of people radioactive Waste.
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
Nuclear Waste Katherine Sanchez Navarro – General Supervisor Shannon McLaughlin – Historian Aleeza Momin – Biologist Rebecca Johnson – Chemist Shahzeb.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
Nuclear Reactors and Nuclear Energy Conversion of mass-energy to electrical energy mass-energy  thermal  kinetic  electric Produces large amounts of.
Nuclear Energy and Nuclear Waste The Good, The Bad, and the Ugly…
The environment is everything that isn’t me. Albert Einstein Albert Einstein.
Nuclear Energy. Nuclear Fission Neutrons split a fissionable atom (U-235) which releases neutrons and other byproducts. New neutrons go on to break apart.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
Chapter 12 Renewable Energy. Heating Buildings and Water  Passive solar energy- no machines used.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
MethodAdvantageDisadvantage Landfills: Waste is buried in the ground  rotting material produces methane gas which cold be collected  filled ground.
Nuclear Decommissioning in the UK Presented by Chris Jones.
The Pilgrim Power Plant By Khloe, Oliver, Galina, Robert and Rachel.
The Nuclear Fuel Cycle 1. NUCLEAR FUEL Nuclear fuel is the energy source of nuclear reactors and an essential element of the reactor core. The heat energy.
Nuclear Energy.
Nuclear Waste Disposal By: Tierra Simmons. Nuclear Waste Disposal Controversy Nuclear energy provides enough efficient sources of energy than all fossil.
Water Pollution . 5 minutes – mark the roll
Unit 1 Physics Detailed Study 3.3 Chapter 12.3: Nuclear Fissions Reactors.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
MethodAdvantageDisadvantage Landfills: Waste is buried in the ground  rotting material produces methane gas which cold be collected  filled ground.
Fundamentals of Nuclear Power
Chapter 12 Nuclear Energy
US-DPRK Next Steps Workshop January 27, 2003Washington, D.C. Yongbyon Spent Fuel Experience Presented by Mark Mohr
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
Section 19.3 Using the Nucleus as a Source of Energy 1.To introduce fusion and fission as sources of energy 2.To learn about nuclear fission 3.To understand.
Nuclear Power Plant How A Nuclear Reactor Works.
The Nuclear Fuel industry The nuclear fuel cycle.
DECOMMISSIONING FROM THE FRONT LINES HISTORY, EXPERIENCE, AND THE PATH FORWARD Deb Katz Executive Director Citizens Awareness Network Contact: (413)
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
Vermont Yankee. Boiling Water Reactor Reactor Building Carbon steel 370 Ci/m3 Concrete 3.8 Ci/m3 Spent fuel pool.
 Uranium: a metal with heavy, unstable atoms; an element  Fission: to split the nucleus of an atom.  Fission Products: created through fission; highly.
What do you know of Japan’s Nuclear crisis? How about any past nuclear issues? Do you feel that nuclear power is safe? Why or why not? Question of the.
Radioactive Waste Management Infrastructure in Egypt:
Nuclear Energy and Nuclear Waste
Preliminary Decommissioning Plan for the Canadian Light Source
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Management of Radioactive Waste
Chapter 12 Nuclear Energy
VII. Radioactive Waste.
Nuclear Energy and Nuclear Waste
Nuclear Energy Fission vs Fusion.
Nuclear Energy and Nuclear Waste
Nuclear Energy and Nuclear Waste
Nuclear Energy.
NUCLEAR ENERGY What is it?
Chapter 12 Nuclear Energy
Pros of Fracking Access to natural gas or oil Natural gas in “cleaner”
Chapter 12 Nuclear Energy
Presentation transcript:

Decommissioning Nuclear Reactors

Background Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean up of all radioactive contaminated systems and structures, and remove the radioactive fuel.

When to decommission? Most nuclear power plants are designed to last for about 30 years. (Newer plants are designed to last for about years.) Companies have been attempting to have longer operating periods in order to help balance the amount of money required to make the plants with the amount of money made while operating. Georgia Tech decided t decommission its research reactor after thirty years because it was only designed to really last that long and because it had begun to cause adverse financial effects.

Georgia Tech’s Research Reactor(GTRR) The GTRR was a 5MW Heavy Water Thermal Reactor licensed in 1964 for only 1MW(converted to 5MW in 1974) Its core contained up to 19 MTR type fuel elements with a biological shield composed of Boral, Steel, Lead, and High Density Concrete

Decommissioning Strategies There are three main strategies to decommission a nuclear facility. DECON (Immediate Dismantling), SAFSTOR (Safe Enclosure), and Entombment. The first, being the fastest, is known as DECON (Decommission). This is the immediate dismantlement of the facility and all parts of said facility are decontaminated to a safe level.

Safe Storage The second type is SAFSTOR, it takes longer than DECON and in this a nuclear facility is monitored until the radioactivity decreases to a level that allows the facility to be dismantled without decontamination requirements Essentially storing the materials until deemed safe enough for removal.

Entombing The final type is ENTOMB. As the word suggests, this is where the structure becomes permanently encased by a material that would prevent the leaking of radioactive materials. Usually involves reducing the size of the area the radioactive material is taking and encasing the entire structure to a degree that it will ensure the radioactivity is longer a concern.

Decommissioning the GTRR In order to dismantle the plant, the fuel must first be removed. The HEU(Highly Enriched Uranium) was removed from the reactor’s core and moved to the Hot Cell Area where the fuel section was removed The fuel was then put into a BMI Cask and the fuel was shipped back to Savannah River

Decommissioning the GTRR (cont.) After the fuel was removed, the heavy water had to be shipped off-site and returned to the DOE Additional piping was added onto existing overflow pumps in order to channel the water into the shipping drums

Decommissioning the GTRR (cont.) After the heavy water was removed, the rest of the reactor was disassembled The radioactive waste was then packaged and disposed of The plant was successfully decommissioned without any off-site contamination The entire process cost 8 million dollars

Final Result? After decommissioning a reactor there should be no danger of a radioactive accident occurring to anyone going anywhere on the property. Essentially the entire site is put under a radioactive ‘clean-up’ and decommissioning is not entirely complete until the plot land is deemed harmless.

References collections/fact-sheets/decommissioning.html collections/fact-sheets/decommissioning.html