IT in Nuclear Decommissioning: Minimising Exposure to Risk Mark Biagi, Strategic Projects Director 10 th March 2008.

Slides:



Advertisements
Similar presentations
Bentley’s Substation Design Solution Al Gray
Advertisements

1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
Seminario Nuevas Tecnologías de Bentley para Minería 2007 Hotel Intercontinental – Santiago – Chile 04 Diciembre 2007 Bentley Mining Solution Rich Scotti.
1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
1 EM Update and Perspective David Huizenga Senior Advisor for Environmental Management 2012 DOE Project Management Workshop April 3, 2012.
Bentley Systems, Incorporated
© 2010 Bentley Systems, Incorporated Integrating the Plant Design Process for Structural Engineers Mitch Sklar, Technical Director, Structural Products.
ISOE Information System on Occupational Exposure: An Overview Brian Ahier, Ted Lazo (ISOE Joint Secretariat, OECD Nuclear Energy Agency) 2007 Asian Regional.
Nuclear power plant siting International Nuclear Power Conference October 23, 2009, Tallinn.
ProjectWise Navigator Visual Collaboration for Immersive Project Review & Analysis Joe Croser Global Marketing Director, Platform & SELECT.
Design Intelligent P&ID's 3d Modeling Walkthrough & Visualization
<Insert Picture Here>
Copyright © 2003 Americas’ SAP Users’ Group Use of Impress SAP-P3 Interface for Projects – Session 3804 Stuart Graham, Halliburton Process Lead - Project.
ProjectWise V8i Overview Part 2
Unlock Your Data Rich connectivity Robust data integration Enterprise-class manageability Deliver Relevant Information Intuitive design environment.
WORKDAY TECHNOLOGY Stan Swete CTO - Workday 1.
IKnow Process Visibility Process Management iRule Nordic QualityStage rule sets Petter Enqvist Senior systems consultant Intelligent Communication AS.
Navision Business Analytics Joyce Leung, Partner Technology Specialist.
Chapter 15: Accounting and Enterprise Software
Release Management and Rollout A very brief overview.
TrackDayTimeTitle ProjectTuesday12:30pm-1:45pm Managing tasks and projects with SharePoint Online and Project Pro for Office 365 ProjectWednesday9:00am-10:15amManaging.
© 2007 Bentley Systems, Inc Bentley Confidential ConceptualizeDesign Analyze Construct HandoverOperate & Maintain AutoPLANT PlantSpace AutoPIPE STAAD/RAM.
AXSYS ®.Process Overview. AXSYS Products AXSYS.Process – Process Engineering Environment for Front End Design & Engineering, providing an integrated Process.
UK Cleanup Market Overview A Strategic approach to Cleanup & Hazard Reduction Nov 2010 Marcus Mackay mercury stone.
Hello and welcome. This presentation will introduce ProjectWise Navigator and explain how it has been designed to satisfy 5 key project and design requirements.
Olivier Amiot Director, Enterprise Marketing Sierra Wireless mHealth.
Bob Thome, Senior Director of Product Management, Oracle SIMPLIFYING YOUR HIGH AVAILABILITY DATABASE.
Server Virtualization: Navy Network Operations Centers
1Copyright © 2012, Oracle. All rights reserved.Confidential Oracle Technology Day May 21, 2013 Art Pasquinelli Director, Repositories and Preservation.
Oracle Open World 2014 Integrating PeopleSoft for Seamless IT Service Delivery: Tips from UCF 1 Robert Yanckello, Chief Technology Officer University of.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
Standard way of sharing product data for nuclear power plants in Korea April 11th, 2005 Soonhung Han Plant Engineering Life Cycle Conference.
“Navigating IT Solutions. Delivering Results.” Bay State, Inc. ◊ 4201 Northview Drive, Suite 408, Bowie, MD ◊ t: ◊
INTRODUCTION TO PRIMAVERA PROJECT MANAGEMENT MODULE (P6) The Primavera Project Management module is comprehensive, multi- project planning and control.
Manage, Find & Share ProjectWise will be music to your ears Joe Croser Global Marketing Director, Platform Products & SELECT.
PBNC- 1 Overview of US Nuclear Energy Initiatives /06- 1 Harold McFarlane President American Nuclear Society.
AIRCRAFT HEALTH MANAGEMENT Data is the Key Presented by Mark StinsonSES_AC_Health_Mgt_Dec07 Presented by Mark Stinson Operations Director.
© 2012 Bentley Systems, Incorporated Jimmy Lau Technical Resource Manager A Spatially Enabled Real-Time Traffic Information Managed Environment.
Municipal License Subscription (MLS) Program Overview.
Information Builders Teradata Virtual User Forum Eric Greisdorf November 16 th, 2011.
© 2007 Bentley Systems, Inc Bentley Confidential ConceptualizeDesign Analyze Construct HandoverOperate & Maintain AutoPLANT PlantSpace AutoPIPE STAAD/RAM.
MicroStation Extensions for SELECT subscribers… (free stuff) Bentley Systems, Inc.
11 Presented by: Kevin Smith, Manager September 29, 2015 ORP’s Path to Reinvigorating Technology Development DOE National Cleanup Workshop EM Technology.
CRESCENDO CRESCENDO Philippe HOMSI Paul WEBSTER
National Cleanup Workshop Managing Large Capital Projects Ken Picha Deputy Assistant Secretary for Tank Waste and Nuclear Material.
1 By Jim McCormick-Barger DOE, WTP Lead Construction Inspector Quality Challenges with the Construction of the First Large Nuclear Facility in the Past.
Howard Cooper Head of Quality, Sellafield Ltd The Sellafield Excellence Journey Date: 2 nd November 2011.
1 Construction of Salt Waste Processing Facility (SWPF) Charting the Course for Major EM Successes in September 29, 2015 Frank.
The Nuclear Fuel Cycle 1. NUCLEAR FUEL Nuclear fuel is the energy source of nuclear reactors and an essential element of the reactor core. The heat energy.
Version # Software Engineering Institute Carnegie Mellon University Pittsburgh, PA Sponsored by the U.S. Department of Defense © 1999 by Carnegie.
March 2004 At A Glance NASA’s GSFC GMSEC architecture provides a scalable, extensible ground and flight system approach for future missions. Benefits Simplifies.
1 2001: WTP Construction Began. 2 WTP in 2015 Pretreatment Facility High-Level Waste Facility Low-Activity Waste Facility Analytical Lab.
Bechtel National Inc. 1 Using Human Performance Analysis to Eliminate Errors Presented September 13, 2006 DOE Integrated Safety Management Best Practices.
Waste Treatment Plant Project Innovation in Design The ISM Process at the Hanford Tank Waste Treatment and Immobilization Plant John Hinckley August, 2009.
ORCALE CORPORATION:-Company profile Oracle Corporation was founded in the year 1977 and is the world’s largest s/w company and the leading supplier for.
1 EM Update Presented to the National Governors Association Federal Facilities Task Force Dr. Inés Triay Principal Deputy Assistant Secretary for Environmental.
IT Services Model Business Requirements IT Strategies Goals
1. 2 Director General Department of Management Department of Nuclear Safety and Security Department of Technical Cooperation Department of Nuclear Science.
© 2007 Bentley Systems, Inc Bentley Confidential ConceptualizeDesign Analyze Construct HandoverOperate & Maintain AutoPLANT PlantSpace AutoPIPE STAAD/RAM.
© 2009 Bentley Systems, Incorporated Intermediate Status Dec 8, 2009 FM Handover Aquarium (COBie2)
Total control software for Breton fabshop equipment.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
Peter Idoine Managing Director Oracle New Zealand Limited.
John Christian President, Logistics, Processing and Disposal
Nuclear Power - a reliable partner
Real-time data delivery may be easier than you think
ISOE Information System on Occupational Exposure: An Overview
Chapter 15: Accounting and Enterprise Software
CAD DESK PRIMAVERA PRESENTATION.
Presentation transcript:

IT in Nuclear Decommissioning: Minimising Exposure to Risk Mark Biagi, Strategic Projects Director 10 th March 2008

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 Introduction Case study 1: Leningrad Nuclear Power Plant Case study 2: Japan Nuclear Fuels Limited Case study 3: Hanford Waste Treatment Plant

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 Operating from 1966 to 2015 Preparing for SAFSTOR Creating a decommissioning database for future generations based on Bentley technology Researching ways of presenting and organising information “An information system for decommissioning is absolutely required.” - Neolant Case study 1 – Leningrad NPP, Neolant

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 Case study 1 – Summary Information volume Information integrity ~2015 ~2106 time Comprehensibility Longevity Standardisation

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 Standardisation – ISO 15926

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 Integrated engineering system based on Bentley technology since 2002 Major 2D – 3D legacy data translation 3D decommissioning system based on MicroStation and Navigator Security and accountability documentation Case study 2 – JNFL, Japan Nuclear Fuels Limited Reprocessing Plant Uranium Enrichment

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 解体手順計画 グループ構造を維持した切断

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 Case Study 2 – Summary Risk minimised through: −Work breakdown structure optimisation −Advanced simulations −Immersive visualisation −Container optimisation −Special WBS research project underway with a major nuclear equipment vendor

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems M gallons of radioactive liquid waste stored in 177 underground tanks World’s largest radioactive waste treatment vitrification plant Distributed engineering environment, 3 design centres, largest ProjectWise deployment to date Complex project, on the scale of 2 nuclear power plants Case study 3 – Bechtel, Hanford Waste Treatment Plant Hanford WTP

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 WTP Project Primary Design Office Richland, WA WTP Project Remote Design Office San Francisco, CA WTP Project Remote Design Office Fredrick, MD High-level waste facility model Pre-treatment facility model Master DB Oracle Replication Technology

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 Case Study 3 – Summary Risk minimised through: −Distributed enterprise work sharing −Remote collaboration of best available resources −Associated construction with decommissioning

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 Summary of case studies Case study 1: Leningrad Nuclear Power Plant Preparing for decommissioning: Information system for future generations Change management Case study 2: Japan Nuclear Fuels Limited Actively decommissioning: Optimisation Simulation WBS Planning Case study 3: Hanford Waste Treatment Plant Construction associated with decommissioning: Work sharing Remote collaboration

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 Decommissioning challenge YearNPP’s to decommission Capacity to replace (MWe) Equivalent New Build 52611, , , , , (Assumes average 40 year NPP lifespan and 1000MWe new build) Data source: IAEA Current NPP age profile (Total = 437) Number Age (years)

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 Comprehensive Portfolio

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 ASME III Class 1 Piping Systems ADLPipe Design and Analysis Bentley AutoPIPE STAAD.Pro Bentley WinNOZL Bentley PlantFlow Bentley PULS AutoPLANT PDW Bentley Architectural Bentley Structural PlantSpace Isometrics PlantSpace Design Series PlantSpace Orthographics PlantSpace SupportModeler Haested WaterCAD Bentley Rebar Haested PondPak PW Schedule Simulation PW Interference Manager Power Civil Bentley CloudWorx Nuclear QA&R * Configuration Management and Collaboration ProjectWise PW LifeCycle Server ISO Bentley I/RAS B PW Navigator AXSYS.Integrity Bentley Redline Bentley View PW Plot Organizer PDF Composer Control and Communication Systems Bentley I&W Bentley Hookups Bentley Inside Plant FEED AXSYS.Process AXSYS.Engine Bentley P&ID Data Manager Datasheets PlantWise Bentley Nuclear Solutions * Bentley maintains a nuclear QA subscription program which meets all applicable requirements of 10CFR50 App. B, 10CFR21, ASME NQA-1 and ANSI N45.2. Both AutoPIPE and STAAD.PRO software are covered under Bentley Nuclear QA program and widely used for safety-related applications.

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 A few of our nuclear customers

European Nuclear Forum 2008, Brussels Copyright © Bentley Systems 2008 Conclusion Minimising risk through IT in nuclear decommissioning: −Today it’s about digitisation, decommissioning databases, remote collaboration, work packaging, simulation, visualisation −Tomorrow it will be about open standard interoperability of information and tools for lifecycle engineering management, and nuclear strength management of change Bentley is a leading IT provider in the nuclear engineering market Leningrad NPP JNFL Hanford WTP

Thank you.