FIDIC 2005 Beijing Workshop 13 Design - Build Opportunities and Challenges in Australasia Tony Barry, President Association of Consulting Engineers Australia.

Slides:



Advertisements
Similar presentations
David DeLaRue, CPCU, ARM, AIC Senior Vice President National Project Insurance Practice General Liability Only Wrap-Ups.
Advertisements

Managing Construction Risks
FIDIC 2005 Beijing Workshop 14 Risk and Liability for Consulting Engineers: An Australian Perspective Tony Barry, President and Therese Charles CEO Association.
Vergabeformen Building Procurement – Contract strategy Procurement Systems – an initial overview Proper choice of delivery system can help to reduce conflicts.
PUBLIC PRIVATE PARTNERSHIP (PPP) CONTRACT MANAGEMENT
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
An Introduction to PPIR
Understanding Public Private Partnerships in Canada John Gamble, CET, P.Eng. OSPE Policy Series June 1, 2011.
Presented by BUSINESS INSURANCE FOR CONTRACTOR CANDIDATES EXPERTS IN FREELANCER & CONTRACTOR INSURANCE Tania Bowers.
JOINT VENTURES General Contractors’ Risk Management Perspective.
A Match made in Heaven? Connecting you with a builder.
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
LEGAL CONSEQUENCES John Mullins 03/09/ POTENTIAL LIABILITIES IN SPORT Torts Law – negligence Contract law Statutory obligation - workplace health.
Proudly supported by: Procurement Challenges “Perspectives on Insurance” Simon Gray State Manager NSW/ACT Planned Cover.
Value Engineering: A Legal Perspective David M. Governo Governo Law Firm LLC 260 Franklin St. Boston, MA
Delivering Service through Intermediaries. Service Provider Participants Service principal (originator) creates the service concept (like a manufacturer)
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
Managing your client risks in difficult times Peter Scott PETER SCOTT CONSULTING.
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
PROTECTION OF CONSUMER & PROPERTY RIGHTS CE.13E. Question What is the role of the United States government in protecting consumer rights and property.
Adrian L. Bastianelli, III Paul C. Monte Michael C. Zisa Joint Ventures 1.
Insurances. Insurance Insurance, is a form of risk management primarily used to hedge against the risk of a contingent loss. Insurance is defined as the.
Date Supplier Engagement models Traditional Delivery Partner Alliance Limited Partnership DBOM Limited Partnership Outsourcing Supplier Engagement.
Workshop 13 Design - Build Onerous Terms in D&C Agreements in Australasia Tony Barry, President Association of Consulting Engineers Australia.
© 2003 McGraw-Hill Australia Pty Ltd, PPTs t/a Accounting Information & Reporting Systems by A. Aseervatham & D. Anandarajah. Slides prepared by Kaye Watson.
About ACE Purpose of ACE ACE exists to represent its members’ interests to clients, both government and private sector, and stakeholder organisations,
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 11 Procurement Management Embedding value into the.
FIDIC CONFERENCE 2005, BEIJING Workshop 13 Design & Build - Role of Consulting Engineers in the Tender Process Tse Yau Shing.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
ATLANTA | CINCINNATI | CLEVELAND | COLUMBUS | DAYTON | NEW YORK | WASHINGTON, D.C. The Health & Personal Care Logistics Conference Spring Meeting 2015.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Steven P Janes Sherrards Solicitors London UK CASE STUDIES:
Copyright © 2008 by Robert B. Carton Selected Business Law Topics.
14 - 1Copyright 2008, The National Underwriter Company Product Liability Insurance  What is it?  Liability exposure of the manufacturer whose malfunctioning.
Liability and Insurance Issues Theodore A. (Ted) Feitshans Extension Associate Professor Department of Agricultural & Resource Economics North Carolina.
Ministry of Transport and Road Safety. Introduction Historical Approach to Contracting with Foreign Companies Current Policy and Requirements for Foreign.
Local Government Forum, 15 September 2010 Tender Negotiations, Indemnity and Exclusion of Liability Kathryn Walker Senior Associate (08)
ICPHSO: U.S. and Canadian Product Liability and Safety Regulatory Risks Kenneth Ross Bowman and Brooke LLP October 27, 2009.
Chapter 4 Agency Law. Chapter Objectives After reading this chapter, you will know the following: How agency relationship work and the authority that.
FIDIC Beijing 2005 Report of the risk management forum Stephen Bamforth Chairman FIDIC Risk Management Forum.
David Barrett – Simmons & Simmons Stephen Wares – Hiscox Lisa Hansford-Smith - MARSH Products vs Services and what type of insurance solution is required.
First Generation Magnox Storage Pond (FGMSP) Programme Partner Requirements February 2014 Steve Topping.
International Insurance Chris MacKinnon RIBA Insurance Agency.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Manager and Service Provider Liability – Where are we now? World Alternative Investment Summit Canada 2010 Ingrid Pierce, Walkers.
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships NCPPP/AGC Conference Phoenix, AZ Christopher D. Lloyd January 27,
PTGC Part Time General Counsel Prepared for:. The Concept Having a high caliber, senior level “legal insider” on location part-time, compared to the outside.
Agency Law-. What is a Principal ? A party who delegates authority to another party.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
CHAPTER 16 BONDING, CRIME INSURANCE, REINSURANCE.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Greece Public Sector Martin S Hirko, MIRCS: Regional Director, Faithful+Gould November 2015 Restructuring Greece: Project Managing the Challenge.
Public-Private-Partnership and Environmental Management in Liberia, Presented by: Washington Waka GEF National Dialogue Initiative & National Environmental.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Key Legal Considerations for Agencies Wake Forest Business School Charlotte Campus June 12, 2013.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Preventing Legal Liability Related to Independent Contractors.
PROFESSIONAL LIABILITY & QUALITY CONTROL
ARI’S Services Contract Research & Consulting Engaging with industry
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
WRHA Supply Chain Forum Presentation
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
Project closeout and termination
Insurance, Liability and Indemnity issues for Assigned Certifiers
Presented by: Ian Massey
FIRE UPGRADES OF EXISTING BUILDINGS
Delivering Successful Outcomes
Presentation transcript:

FIDIC 2005 Beijing Workshop 13 Design - Build Opportunities and Challenges in Australasia Tony Barry, President Association of Consulting Engineers Australia Director Connell Wagner Pty Ltd

2 Project Delivery Traditional Construct Only Design & Construct (D&C) Design, Construct & Maintain (DCM) Build Own Operate (BOO) Build Own Operate & Transfer (BOOT) Public Private Partnerships (PPP) Alliances

3 Design & Construct Design-Build = Design & Construct There is a D&C Contract embedded in every PPP, BOOT, BOT, DCM contract D&C is the most common form of project delivery in the Building, Urban Infrastructure and Power Generation Markets in Australia Construct Only Contracts most common in NZ, D&C increasing

4 Roles for the Consulting Engineer in D&C Owner’s Planner and Engineer Banker’s Engineer Contractor’s Designer Contractor’s Verifier Proof Engineer (Principal & Contractor) Construction Verifier (Principal & Contractor) Independent Reviewer (Principal & Contractor)

5 Why Design & Construct ? Initially Reduce claims by contractors against Principals Innovation without risk Larger projects – contractors perceived with greater capacity to manage than government Speed of Delivery Cost and program, both risks to politicians

6 Why Design & Construct ? Now Total risk transfer from Principal to Contractor – very few claims Innovative Solutions Successful delivery, great projects Even larger projects Speed of Delivery Projects delivered in one political term

7 The Risk Environment for Consultants Legal framework – Common Law, Contract Law, Trade Practices Act, Occupational Health & Safety Acts Onerous Agreements Contractors capacity Contractors plan to deal with commercial loss

8 The Risks Client risk dumping Risks inherent in Design & Construct Tender process suppresses risk $ Client Information risk The risks are commercial risks Losses crystalise in the D&C team Contractor has no avenue to claim against client Claim against consultant PI cannot support commercial risks

9 Onerous Terms High standards of care Responsibility for client supplied information Absolute Fitness for Purpose warranties Strict compliance Open ended Indemnities Duty of Care to multiple parties Liability for delays outside control Disclosing terms of PI Policy

10 The Solution Don’t accept unreasonable terms – walk away Negotiate a good contract to maintain a good relationship and a good business Use Limits of Liability above which Clients carry the risk Adopt commercially sustainable PI Insurance levels and guidelines Negotiate scope carefully and exclude others’ responsibilities

11 The Future More Design & Construct Bigger projects Fewer contractors Higher cost to Principals More work and more opportunity for Consulting Engineers More claims and litigation Better risk management by all parties

12 Better Risk Management Open identification and pricing in tenders Risk sharing with agreed specified outcomes Limitation of liability for contractors and consultants Risk management record and tender evaluation criteria

13 Design & Construct Business Model Principal D & C Contractor ConsultantSubcontractors Total Risk Transfer Risk Transfer Risk Transferred or Managed

14 Contractor–Consultant Liability Transfer Model Master – servant relationship Head contract conditions passed down Risk transfer through onerous terms Impossible and impractical notice requirements Representations designed to create TPA breaches Certify compliance or breach contract Excessive and protective administration Aggressive and manipulative behaviours Designers site role suppressed / limited Post-contract claims and disputes Careers destroyed

15 Contractor–Consultant Liability Managed Model Co-operative integrated relationship Methods of managing Head contract conditions agreed without transfer to consultant Consultant carries negligence risk Consultant assists Contractor to identify and manage risks Contractor to certify compliance or non- conformance Consultant to retain independent judgement Consultant uses Contractor administrative systems Co-operative behaviours and excellent performance Designers site role expanded and integrated Post-contract awards Careers enhanced

16 Tony Barry Connell Wagner Pty Ltd on behalf of Level 12, 75 Miller Street | North Sydney NSW 2059 (02) | |