1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Department of Transportation Review and Discussion of Draft Scope of Work for Study of Issues Associated with Increasing Transportation.
Advertisements

Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
ODOT's Environmental Site Assessment Process
MIKMAQ ECOLOGICAL KNOWLEDGE STUDIES (MEKS) Presentation by - Membertou Geomatics Solutions Mikmaq Ecological Knowledge Studies.
Phase I Environmental Site Assessment
PHASE II ESA 2014 ESA GUIDELINES. PHASE II ESA 2014 ESA GUIDELINES PROJECT DEVELOPMENT PROCESSES –PATH 2 AND 3 PROJECTS –PATH 4 AND 5 PROJECTS W/ WORK.
ENVIRONMENTAL SITE ASSESSMENTS OHIO COMMUNITY DEVELOPMENT CONFERENCE JENNIFER MILLER NOVEMBER 7, 2012.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
Vermilion County Brownfield Assessment Grant. Overview Brownfield Basics USEPA Brownfield Assessment Grant Vermilion County Assessment Grant Site Selection.
ENVIRONMENTAL SITE ASSESSMENT SCREENING. Purpose First step in ODOT’s ESA Process Identifies all sites in project Use hard data to screen the project.
Geotechnical Investigation Step 1 - Gather Existing Information Structure Data Bridge, building, road, wall, etc. Type - stories, loads, materials, etc.
1 Public Lands Advocacy HOW TO REVIEW A FEDERAL PLANNING DOCUMENT.
REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.
Soils Investigation Soil Investigation
Phase I and Phase II Environmental Site Assessments Environmental Specialist Brownfields/Voluntary Cleanup Program June 2014.
W E L C O M E to the SB 1022 Real Estate Due Diligence Training SB 1022 Real Estate Due Diligence Training.
Bringing it all Together: Oil & Gas Operations after Acquisition and Diligence Gina M. Banai.
Presented by Dwain Butler District Director of Environmental Health Southeast Health District Waycross, Georgia.
1 A SDB contractor was awarded a $6.2 million contract to construct two buildings in Hawaii that were 300 yards apart and 700 yards from the ocean. The.
Excavation Instructional Goal: through class participation and discussion, the participant will identify the issues and hazards related to trenching and.
Investigating Ground Water Contamination at Ohio’s C&DD Landfills Aaron Shear Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013.
Project X RD&D Plan Conventional Facilities (Civil Construction) Russ Alber AAC Meeting February 3, 2009.
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
Brandon Real Estate Board - June 19/20031 Your Logo Here ENVIRONMENTAL SITE ASSESSMENTS Phase I ENVIRONMENTAL SITE ASSESSMENTS Phase I.
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Procedures and Processes Phase II: Evaluation CRM Phases I-III This presentation uses materials taken from Ricardo Elia’s Cultural Resources Archaeology.
Debra Harrington FDEP Groundwater Protection Watershed Monitoring Meeting August, 2004 INTEGRATING GROUND WATER INTO WATERSHED MANAGEMENT and BASIN ASSESSMENTS.
“Coal Sector Policy Support Programme” This project is funded by the European Union Implemented by Human Dynamics Consortium TACIS Project: “Coal Sector.
Direct-Heat Geothermal Systems: steps to improve understanding about the source of heat Rick Allis Utah Geological Survey March Workshop.
National Semiconductor Disaster Response – Recommended Plan 1.Assess Scope of Disaster 2.Recommended Response Sent to Foundation Executive Board by CR.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Former DuPont Barksdale Works Project Update December 14, 2004 DuPont Corporate Remediation Group Great Lakes Visitors Center.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Prepared By: Presented By: Lawrence H. Ernst, PG, CEG, CHG Principal Hydrogeologist/Wood Rodgers November 21, 2014.
3D Technology and the Section 106 Process Matt Diederich Archaeologist Oregon State Historic Preservation Office (SHPO) Oregon Heritage Programs Division.
Carousel Tract Environmental Remediation Project Update by Expert Panel to Regional Board July 11, 2013.
Today’s Lecture Announcements Phase I Environmental Site Assessment
Steps in Foundation Engineering Understand project and site Develop design criteria Identify possible foundation alternatives Conduct soil investigation.
South Australia’s Environment Protection Authority Articulating aesthetics Monday 24 August 2015 Andrew Pruszinski.
Corrective Action Program: Working with Your Local Agency to Solve Local Problems James Clay County of San Diego Department of Environmental Health Site.
Deanna Streifel Environmental Engineering Officer Arnprior Waste Disposal Site Annual Monitoring Results.
Mineral Exploration Tel: (07) Fax: (07)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Geotechnical Conditions Tom Joos Civil/Structural Engineer BNL Plant Engineering.
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
Environmental Considerations prior to purchasing Properties Sabine E. Martin, Ph.D., P.G. Center for Hazardous Substance Research Kansas State University.
1 A SDB contractor was awarded a $6.2 million contract to construct two buildings in Hawaii that were 300 yards apart and 700 yards from the ocean. The.
Microzonation Study of Soil Liquefaction Potential and Damage Wei F. Lee Taiwan Construction Research Institute Ming-Hung Chen National Center for Research.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
Environmental Site Assessments Hazardous Materials/ Regulated Substances Categorical Exclusion Training Class.
Brownfields 101 Environmental Engineering Considerations Presented By: Ileen Gladstone, P.E., LSP, LEED.
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
Protecting Cultural Sites Shoshone-Bannock Tribes Environmental Waste Management Program By Zannita Armell.
ASTM E1527 (Phase I Environmental Site Assessments) ASTM E1528 (Transaction Screen Process) ASTM 1903 (Phase II Environmental Site Assessments) ASTM Standards.
Multnomah County Central Courthouse Site Due Diligence Update April 9, 2015 JD Deschamps Mike Pullen Mike Day.
Pinecastle Jeep Range Resolution Board of County Commissioners Discussion Item November 29, 2011.
N. C. Department of Environment and Natural Resources Division of Waste Management Stony Hill Road Contamination Wake County.
Collaborating for sustainable growth
Community Redevelopment Initiatives Presented to the
Preventing Exposure to Lead in Drinking Water
Geotechnical Investigation
Redevelopment Authority of the County of Washington O
Well 38 Drilling & Testing Amendment
Environmental Site Assessments
Connecticut Remediation Standard Regulations: Volatilization Criteria
Butte County Board of Supervisors November 8, 2016
Allocation of Risk Arising from Subsurface Conditions
Environmental Considerations prior to purchasing Properties
Presentation transcript:

1. Identify Stakeholders 2. Establish the Criteria 3. Identify Potential Sites 4. Initial Screening/ Evaluations & Short List 5. Specific Site Study 6. 2 Purchase Land

 Rigorous review of records (including historic maps and aerial imagery)  Review of historic databases for environmental issues  Site inspection  Interviews with owners, occupants, neighbors, and local government officials  There were no indicators, or triggers discovered that would indicate the need to do further investigation (Phase II Assessment) for soil or water contamination 3

 Executed twenty-six (26) soil test borings. Borings were drilled to depths ranging from 10 to 50 feet below the existing ground surface.  Performed a laboratory testing on each boring  Provided foundation, lateral earth pressure, and pavement design recommendations  Minor risks noted with soil settlement typical to construction projects  Nothing noted from report that couldn’t be mitigated by design 4

5  We are seeking a motion to purchase this land from Mr. Cahill located at 740 Figsboro Road in the amount of $545,000 pending approval of appropriated funds from the Henry County Board of Supervisors