PAF Status Meeting June 2015 B. Shillue. February Slide Phased Array Feeds The Jan 2015 GBT test was successful, demonstrating: – Seven low-noise beams.

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

Cryogenic PAF Development Progress Report PAF WorkshopMay 3-5, 2010 Provo, UTRoger Norrod.
Antennas for MeerKAT March TDP AWG, 13-14/3/08, San Francisco MeerKAT Semantics K.A.T. = Karoo Array Telescope –KAT is Afrikaans for cat –MeerKAT:
Schediwy: Advantages and Disadvantages of Sparse Aperture Arrays Fermilab: October 2009.
TDP Progress Report, June 4, 2010
NRAO Receivers Richard Prestage
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Integrated Receivers.
Shilpa Bollineni, Glen Langston, John Ford, Randy McCullough and Paul Demorest DATA ACQUISITION ON THE 43M TELESCOPE.
SKAMP - the Molonglo SKA Demonstrator M.J. Kesteven CSIRO ATNF, T. J. Adams, D. Campbell-Wilson, A.J. Green E.M. Sadler University of Sydney, J.D. Bunton,
SKA TDP Receiver Antenna Interface March 21, 2008 Total system noise contributions Choice of operating temperature Wideband feeds.
Phased-Array Feed Measurements at Green Bank Karl Warnick, Brian Jeffs Jonathan Landon, Mike Elmer Roger Norrod, Rick Fisher.
BDT Radio – 2b – CMV 2009/10/09 Basic Detection Techniques 2b (2009/10/09): Focal Plane Arrays Case study: WSRT System overview Receiver and.
Sascha D-PAD Sparse Aperture Array.
Receiver TDP Report to US SKA Consortium Nov 17, 2008, Emphasis in Caltech TDP Meeting the 35K Tsys goal,
The SKA Molonglo Prototype (SKAMP) Project SKA Meeting - April 2006 Anne Green.
ATA Antennas Feeds and Systems NSF Review 8/05/08 Jack Welch.
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
Receiver TDP Report to US SKA Consortium May 22, 2008 Sandy Weinreb, Joe Bardin, Glenn Jones, and Hamdi Mani California Institute of Technology
Antenna, Feed, and LNA Integration S. Weinreb, May 7, 2009, LAX Antenna Working Group Meeting 1.Issues 2.Feed Summary 3.LNA Summary 4.Differential LNA’s.
Receiver Systems Suzy Jackson – based on previous talks by Alex Dunning & Graeme Carrad.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Digital Signal Processing.
AA-mid demonstrator Dion Kant AAVP – 10 December 2010, Cambridge, UK.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array NRAO Millimeter/THz.
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
Technologies for Radio Astronomy Graeme Carrad | Assistant Director - Engineering Mark Bowen | Group Leader – Front End Technologies JULY 2012 CSIRO ASTRONOMY.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
Meteor Receiver Olajide Durosinmi Hugh Kinsel Kenny Mills Austin Pierce Nick Stelmashenko October 21, 2009.
GBT K-band Focal Plane Array Monitor and Control Interface, Cryogenic LNA Bias System February 27, 2008.
Mark Bowen Acting Theme Leader – Technologies for Radio Astronomy CSIRO Astronomy and Space Science 14 October 2010 Australia Telescope Users Committee.
Phased Array Feeds John O’Sullivan SKANZ 2012 CSIRO Astronomy and Space Science,
S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy.
Cryogenics on the Stratospheric TeraHertz Observatory Gary Mills Ball Aeropace & Technologies Corp Abe Young, Ruben Dominguez, Brian Duffy,Craig Kulesa,
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Meeting Summary Richard.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
Proposed Versatile 1.2 to 14 GHz Radio Telescope Receiver S. Weinreb, JPL/Caltech, Draft July 5, 2005 Contents 1.Introduction and intended applications.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K band History Science workshop determined efficiency improvements necessary for K Band: weather, observing requests, mapping programs. Only enough funds.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
SKA Dishes, CSIRO February 2013 SKA Dish Verification Antenna #1 Gary Hovey Astronomy Technology Program – Penticton 12 February 2013.
Electromagnetic Design of Broadband Antenna Feed Systems for the Northern Cross Radio Telescope (Bologna, Italy) Designed Broad Band Antenna Feed Systems.
GBT Focal Plane Array Development Program Steven White Program Manager.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Phased Array Feed Development.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
Centimeter Receiver Design Considerations with a look to the future Steven White National Radio Astronomy Observatory Green Bank, WV.
1 EM COMPONENTS UPDATE & PERFORMANCE RESULTS S. Srikanth Critical Design Review GBT K-Band Focal Plane Array January 30-31, 2009.
Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.
1 Our Proposed Involvement in QUIET Phase II Assembly of ~1500 W-band Polarization Analyzer Modules ~ 2 year production run Collaborative effort with Caltech.
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
K-Band Focal Plane Array Steven White Program Manager.
GBT Focal Plane Array K band 7 Pixel Steven White Program Manager.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Engineering Opportunities.
A discussion on the Readout Schedule leading to PDR Ganesan Rajagopalan Cornell University.
Possible Instrumentation Development Items for SKA at ASIAA Chau-Ching Chiong (ASIAA) and Yuh-Jing Hwang, Homin Jiang, Chao-Te Li.
Single Cryocooler 1.2 to 116 GHz Receiver for ngVLA S. Weinreb, A. Soliman, and H. Mani July 30, Rationale 2.Synergistic Reflector Design 3.Dewar.
Cosmic Microwave Technology, Inc.
Matt Morgan National Radio Astronomy Observatory
Mid Frequency Aperture Arrays
Phased Array Feeds Wim van Cappellen
The Development of Broadband VLBI Technologies in SHAO
Cryogenic PAF Development
Wideband Single Pixel Feeds
GlueX Electronics Review Jefferson Lab July 23-24, 2003
NRAO-GB Support for VSOP-2
EVLA Advisory Panel Mtg. System Overview
as a prototype for Super c-tau factory
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

PAF Status Meeting June 2015 B. Shillue

February Slide Phased Array Feeds The Jan 2015 GBT test was successful, demonstrating: – Seven low-noise beams on sky – Tsys/eff of central beam =48K – Close correspondence between measured result and model Lower Tsys will be possible by expected improvements in the LNAs

Successful GBT test Jan 2015 Collaboration with Beamformer Project “Wide-Field Focal Plane Array Beamformer for Diffuse Hydrogen, Pulsars and Fast Transient Surveys on the GBT” - to expand backend bandwidth to 150 MHz New digital downconverter and photoreceiver for improved performance and reliability Upgrade to low-noise amplifiers underway Despite successful GBT test, the model and data do not match perfectly. There is an active investigation to resolve this Instrumentation upgrades include: – Integration of new digital downconverter with Phased array receiver – Production of digital receiver PCB – Layout and fabrication of improved low-noise amplifier prototype February Slide

Other Outcomes of January Test Results published as NRAO EDIR#326 HI line was detected Tsys/eff of central beam = 45.5K, increases by 13K for 1 FWHM offset Beamformer weights “transferred” from calibrator to targets at different Az, El Survey speed exceeds the GBT L-band system by 20% Fairly good agreement between results and model, some discrepancies but likely all or mostly instrumental – Discrepancy between measured and modeled Tsys/eff: Model predicts about 38K, we measure between 40-46K – The 40-46K Tsys/eff result depends on calibration flux density but should NOT! – The dependence on calibration source strength has not been understood after extensive testing, but we suspect may be due to another spurious effect which causes noise temperature measured after the downconverters to be higher than noise temperature measured before the downconverters. Possible cause is inter-channel coupling

2015 PAF Milestones POP Milestone DescriptionDate 19Prototype and evaluate redesigned low noise amplifiers. 9/30 20Integrate and test the digital downconverter with PAF front end 6/30 21Digital receiver development: Prototype photoreceiver PC board and test with Roach 2 firmware 9/30 22Improve PAF electromagnetic and beamforming model 3/31 23Feasibility study for improved PAF receiver 9/30 These are all on track

Resources FY2015: Ten people with allocations ranging from 0.10 to 0.90 Is this fracturing a problem? Two people with allocations of 0.20 have made great contributions Some people have made contributions without a PAF allocation (John Ford’s group), Rick Fisher More than fractured FTEs, resource competition, has been more of a challenge

LNAs Initial design and circuit model is done Made decision to separate the input coax from the LNA, so the LNA will have an input connector LNA board layout and case mechanical design – little progress recently, people and priorities were juggled this week to make it go faster LNA is now the critical path item for the next telescope test: – Make prototype – Test Prototype – Adjust design, re-spin – Manufacture and assemble 20 dual LNAs – Test Q=20 – Integrate into Front End Receiver

Roach2 Polyphase Filter Bank Backend Roach2 backend is being developed to accomplish the “F” stage of the backend Photoreceiver cards fabrication by DigiCom, delivery expected any day First test of Digital transmitter with photoreceiver and Roach2 will take place in Cville in July, with Jason Castro assisting Subsequent testing will be done by Vereese van Tonder in GB reporting to John Ford

Front End Integration All of the following are being integrated into a Front End box in Green Bank (Bob Simon) – Digital Downconverter (5 Blades) – Linear power supplies – Microcontroller for Monitor/Control – Thermal shutdown circuit – Peltiers and fans – Digital transmitter fiber optic outputs and bulkhead connections – RF, LO, and timing Cabling – All in an RFI-tight enclosure Tests will include: – RFI compliance testing – Monitor and control firmware testing – Test with Digital Link

Front End and Cryogenic New LNAs, Airline thermal transitions and Coaxial vacuum feedthrus Assembed *with new cryostat* into new Front End box with digital downconverter This allows old PAF FLAG receiver to remain untouched

Expected Improvement Existing PAF ~45K Tsys/ h with Tsys~32K Improvement >= 5K from LNA Improvement 3-5K from new downconverter Tsys ~ 22-24K, Tsys/ h <= 31-34K Existing PAF L-Band survey speed is 20% better than prime focus single pixel L-band receiver If we also increase the dipole spacing, the off-axis beam efficiency will be much improved Resulting receiver can have 4x the survey speed of single pixel L-band

Longer term Vision for PAF Green is the engineering Build-Test Path Blue is the Research and Development Path

Cryogenic Test and Development Following the STARGATE meeting and the student exchange plan, we setup a cryogenic test and development station in the CDL Rick Fisher wrote a short white paper on R&D areas Focus on two areas: – Use of new low loss foams to support a large vacuum window needed to cool elements of a large array – New cryogenic dewar concept to build lighter-weight more efficient cryostats for large format PAFs This effort is in a startup phase Wiki is at edArrayFeedCryogenics edArrayFeedCryogenics

Science Case Brian Mason has started looking at the Science Case with Bill, Rick, Anish Wiki is up at asedArrayScience asedArrayScience Work in progress Clearly we will also need better Cost Bases to do a good tradeoff study with other kinds of receivers Making cheaper, lighter, easier to fabricate and replace front end components will help any case. Important to keep R&D effort alive, …lately all of our effort has been test, troubleshoot, build, …not R&D