EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
M760 TOWER CRANES ERECTION
Click on this image to open the full PDF document.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Getting Started with your Diagnostic Station Getting Started with your Diagnostic Station.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
TP4-ENERSOL-TD/PV double function
1 Detector position August 2005, supplement May’06 sub- detectormean Zdelta ZZ_startZ_end TT First pillar =1 st shelf at sides
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
GERDA collaborationmeeting, Ringberg castle Béla MajorovitsTG5 Review: Infrastructure on top of the tank1.
Ground Safety Review – Phase II September 8-10, 2008 Phil Mott
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
8am: start testing the corner cube mounts on DX cells.
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Installation Plan of VIS Ryutaro Takahashi (NAOJ) for the 4th external review on 30 June.
NLA-5 Series Rigging Manual Preparation Material 2.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
25 January 2007VELO sub-projectsEddy Jans 0 VELO-meeting January 25, 2007 Sub-projects: SX & SX connectorize cooling cables alignment procedure.
1 MOMENTUM 3800 RC ASSEMBLY INSTRUCTIONS PART NUMBER
LHCb MUON - ADDITIONNAL SHIELD BEHIND M5 – UNIT AREA Dimensions of 1 iron brick  100 x 100 x 200 mm3 1 ROW of 1200 mm length  12 iron blocks.
V. Bobillier1 Cable installation status.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
LARP Collaboration Meeting Racetrack Coil Fabrication
Getting Started with your Diagnostic Station Your ADC ADVIEW Diagnostic Station Unpacking the contents, you will find… Quick start guide (a printed version.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
Getting Started with your Diagnostic Station Getting Started with your Diagnostic Station.
Joint Institute for Nuclear Research Deformations and stresses in the flux return yoke A.Efremov, Yu.Lobanov, A.Makarov Darmstadt,
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
DCal-ALICE integration and installation plan and status A. Tauro.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
BM&N STS ladders assembly in VLHEP
Planning for Proto-DUNE PD Installation and Cabling at CERN
ADO-PO / TC meeting NJD/NSW Assembly Raphael Vuillermet.
Baby-MIND Modules & Services
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
CLIC Handling Engineering Update
SX1 manipulation VERSION 1 Version
Update of MVD services and requests
Escalator Installation
VELO-installation meeting CERN, January 17, 2006
Present status of the flux return yoke design
LHC Experimental Vacuum Systems Status October ‘07
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Update on Junction Box Design
Initial BIS installation
Mounting a BalanceBox®650 to a brick wall
HYBRID COOKTOP.
Presentation transcript:

EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station

EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 2 Preparations PPSPS document written, WPA meeting yesterday. Transport: Monday 11 th of Dec from ZH to CERN. Transport boxes (see next slides). Transport from CERN-Meyrin to pit 8. → custom formalities. Exercised station assembly and cooling in ZH. See next slides. Requirements in cavern: Magnet balconies and ladders. Platforms (4.2m and 5.2m). → cover plates 4.2m platform C-side missing. Cranes (SX8, UX85, RB84). Iron blocks for cable chain support. → still to be welded to magnet. Co-activities VELO RF-boxes: no welding while tank is open. Preparations for the beam pipe installation.

EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 3 Organization When: week 50, starting Monday Who: from ZH: Stefan Steiner, Angela Buechler, JvT from CERN: transport, crane operation Steps 1.Transport of 2 aluminium C-frames (1 box) and 4 filled cable chains (4 pallets) from surface to cavern using crane in SX8. 2.Transport in cavern of C-frames onto RB84 platform. 3.Installation of C-frames onto TT rails. 4.Transport in cavern of cable chains to RB84 platform. 5.Installation of the cable chains.

EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 4 Step 1: Transport surface to cavern The C-frames are lowered in the pit in a wooden box using crane SX8. Each cable chain (filled with cable) is lowered on a EURO-pallet with side panels and top cover using crane SX8. All boxes are moved with forklift in reach for the UX85 crane. Box dimensions: 2800x1700x1140 mm 3. Weight: 1020 kg. Reinforcement for the use of straps. Dimensions: 800x1200x500 mm 3 Weight: 120 kg. If possible return euro- pallets to transport company by interchanging with empty ones.

EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 5 Step 2: Transport C-frames in cavern Take C-frames out of box using UX85 crane. Move 1 C-frame to 4.2 m RB84 platform (A-side). Move other C-frame over the magnet to 5.2 m platform (C-side). Plastic hoses for protection of the straps C-frame envelop: 2750x1400x500 mm 3. Weight: 250 kg. Standard lifting tool (palonier) required.

EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 6 Step 3: Put C-frame on rails Move C-frames in front of TT rails using small manual forklift. C-frame rests on support blocks. C-frame is lifted in “normal” (vertical) position using the RB84 crane. C-side: additional turn around vertical axis required. C-frame is lifted onto the 2 L-brackets connected to the TT rails. C-side:Put L-brackets below 5.2m platform on 4.2m platform. No dismantling of 5.2m platform needed. The C-frame is lifted in “normal” position. The L-brackets for gliding the C-frame on the rails. The C-frame is lifted by its first hole.

EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 7 Step 3: Put C-frame on rails Push C-frame on the L-piece manually towards rails. When C-frame is located above gliders on rails → lower positioning screws on L-piece until C-frame is standing on gliders. Straps remain attached to the crane for safety. Additional strap around upper rail. Fix C-frame to gliders on lower rail. Finally, fix it to guiders on upper rail. Access to guiders possible from TT balcony mounted on magnet. Install hard stops. The C-frame is positioned on the L-pieces. The C-frame is manually pushed to the its position above the rails. Full station (incl. dummy module)

EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 8 Step 4: Cable chains to platform Install cable chain supports. Use UX85 crane to move the 4 cable chain boxes to 4.2 RB84 platform (A-side). Unpack all cables chains on platform.

EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 9 Step 5: Cable chain installation Lift 2 cable chains to C-side using UX85 or RB84 crane. Mount lower cable chains manually. Lower end to support bar, upper end to C-frame. Lift upper cable chains over upper TT-rail onto support bars using RB84 crane. Fix upper end of cable chain to C-frame. Envelop: 300x500x260 mm 3. Weight: 100 kg. Straps for lifting.