07/09/20051 Fédération Internationale des Ingénieurs-Conseils FIDIC Annual Conference Quality Procurement Workshop Beijing, China September 7, 2005 BEST.

Slides:



Advertisements
Similar presentations
TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
Advertisements

Options appraisal, the business case & procurement
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
ENGINEERING The Future of Our World FIDIC Resources.
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Course: e-Governance Project Lifecycle Day 1
Session 8 Implementing PPPs
RFP PROCESSES Contracts for Professional Services.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Presentation By: Chris Wade, P Eng. Finally … a best practice for selecting an engineering firm.
Conclusion Finally… A Best Practice for Selecting Engineers From Vision to Reality Engineering Canada’s Future.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
PROCEDURES FOR SELECTING THE CONTRACTOR
OAG Office of the Auditor-General Promoting Accountability in the Public Sector Using Audit to Oversee Public Procurement Edward Ouko Auditor-General Kenya.
SAFA- IFAC Regional SMP Forum
ZHRC/HTI Financial Management Training
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Guiding principles for the Federal acquisition system
ZHRC/HTI Financial Management Training Session 8: Annual Procurement Plans, Procurement Contracts, and Contract Management.
The Art of QBS Qualifications-Based Selection (QBS): Procuring Intellectual Services the Smart Way Claude Paul Boivin, ACEC Canada Title #1.
Mitigating the Social Impact of Oil Operations 18th World Energy Conference Eleodoro Mayorga Alba World Bank October 22, 2001.
Internal Auditing and Outsourcing
> taking best practice to the world International Experience with Performance Based Maintenance Contracts.
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
The Importance of the Qualifications Based Selection (QBS) Process
Construction Category Management Planning Version 1.1 (May 2015)
TTBIZLINK PROJECT MINISTRY OF TRADE, INDUSTRY, INVESTMENT & COMMUNICATIONS.
Sustainability and Total Cost of Ownership Strategies for Higher Education.
1 Smart Public and Private Procurement Lukáš Klee for BCC in CR Procurement in the construction sector and the use of FIDIC contracts British Chamber of.
Best Value for Clients Presented to the Canadian Public Procurement Forum by Glenn Martin, Executive Director Consulting Engineers of BC November 4, 2009.
Introduction to ISO 9001:2000.
WSSB Capacity Enhancement Workshop 1 Session 3 Contract Management Systems.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Quality Management.  Quality management is becoming increasingly important to the leadership and management of all organisations. I  t is necessary.
General Principles for the Procurement of Goods and Services Asst. Prof. Muhammad Abu Sadah.
Governmental Procurement ISQA 440 Goals of Procurement Steps in the Procurement Cycle Specifications and Work Scopes 1.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
THINK Procurement. What did we have? MOSTLY DECENTRALISED PROCUREMENT Staff purchasing in isolation with little guidance or adherence to Council policy.
Quality Based Selection The Best Practice for Selecting Professional Consultants [DATE]
Governance Subcommittee James Dobbins, Chair. Dobbins – Governance 13 December 2010 The Summary Mission Statement Foster engagement between the U.S. society.
Copyright 2005 by CH2M HILL The Challenge for Consultants Glen T. Daigger, Ph.D., P.E., DEE, NAE Senior Vice President and Chief Technology Officer
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
1 Voluntary and Community Sector Review Voluntary & Community Sector Review Grants Strategy Working Party Participative Session 28 September 2006 Appendix.
Kathy Corbiere Service Delivery and Performance Commission
United States Agency for International Development Bureau for Global Health Office of Population and Reproductive Health Policy Update.
Learning the lessons 2012 and 2014 procurements of audit services.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Fédération Internationale des Ingénieurs-Conseils BIMILACI 2007 FIDIC Tools and Initiatives on Integrity Management Washington, May 11, 2007 Dr. Jorge.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
BIMILACI 2007 Partners for Quality Infrastructure: The FIDIC Vision Washington, May 10, 2007 Dr. Jorge Díaz Padilla FIDIC President.
BIMILACI 2007 Best Practice Procurement of Engineering Services Washington, D.C. May , 2007 Gregs Thomopulos, P.E., FACEC Executive Committee Member,
BIMILACI 2007 THE CHALLENGE OF CAPACITY DEVELOPMENT Washington, May 11, 2007 Bayo Adeola FIDIC Executive Committee.
PROCUREMENT RULES FOR EXPERIMENTS AT CERN Dante Gregorio CERN Procurement Service.
CEM515QUALITYASSURANCECEM515QUALITYASSURANCE SUPPLIER PARTNERSHIP.
UNDERSTANDING ISO 9001:2008.
Governance Subcommittee
Preparation of a tender and tender documents
Systems Analysis and Design in a Changing World, 4th Edition
SUPPLIER PARTNERSHIP 2.
The SWA Collaborative Behaviors
Lockheed Martin Canada’s SMB Mentoring Program
The evaluation process
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
Delivering Successful Outcomes
Presentation transcript:

07/09/20051 Fédération Internationale des Ingénieurs-Conseils FIDIC Annual Conference Quality Procurement Workshop Beijing, China September 7, 2005 BEST PRACTICE PROCUREMENT OF ENGINEERING SERVICES Gregs G. Thomopulos, P.E., FACEC Executive Committee Member FIDIC

07/09/20052 Fédération Internationale des Ingénieurs-Conseils To promote the business interests of members providing technology-based intellectual services for the built and natural environment, and while so doing, accept and uphold our responsibilities to society. FIDIC’s Mission:

07/09/20053 Selection Guide – Best Practice Principles Fédération Internationale des Ingénieurs-Conseils  FIDIC emphasizes that quality is paramount in the selection of consultants, and that Quality Based Selection is the recommended method.  FIDIC emphasises the need for integrity, clarity and quality in the Inviting and Evaluation of Proposals for Consultant Selection.

07/09/20054 Guide to Quality Management Guide to ISO 9001:2000 Fédération Internationale des Ingénieurs-Conseils FIDIC has published:  Guide to Quality Management in the Consulting Engineering Industry  Guide to the Interpretation and Application of the ISO9001:2000 Standard for the Consulting Engineering Industry  Training Kit: Quality Management in the Consulting Engineering Industry

07/09/20055 FIDIC Fédération Internationale des Ingénieurs-Conseils BEST PRACTICE PROCUREMENT MAXIMISING BENEFITS TO CLIENTS

07/09/20056 The Issue Fédération Internationale des Ingénieurs-Conseils  General observation that the quality of the constructed project has been deteriorating.  This observation is confirmed by the Banks’ Project Managers, Executing Agencies and International Consultants.  It is also perceived that good International Consultants are losing interest in Bank- funded projects.  The current trend in diminished Quality Outcome of the constructed project needs to be reversed.

07/09/20057 Causes of Deterioration in Quality Fédération Internationale des Ingénieurs-Conseils  A major cause is the diminished quality of design.  Lower quality design results in lower quality construction and increased variation orders, resulting in increased cost of the project.  Other factors contribute as well, including:  Corruption;  Incompetent Contractors;  Poor Project Management;  Lack of Resources to Manage Contractors.

07/09/20058 Selection Guide – Best Practice Principles Fédération Internationale des Ingénieurs-Conseils “Consultant selection is highly critical to the success of the entire project; to save a small percentage, perhaps 1% or less of project cost, is not worthwhile, considering the potential risks.”

07/09/20059 Selection Guide – Best Practice Principles Fédération Internationale des Ingénieurs-Conseils Quality in the process of selection of engineering consultants refers to those factors which will enable the consultant to produce the best value solution to the Client’s Terms of Reference: and includes the Firm’s relevant professional competence and experience, managerial ability, financial capability, availability of resources, capability of designated staff, quality and integrity management systems, and demonstrated understanding of the Project and the Client’s Brief.

07/09/ Fédération Internationale des Ingénieurs-Conseils The Parties to Procurement  The Purchaser (Client or Employer)  The Professional Service Provider  The Financier  The Contractor  The Public – End Users

07/09/ Informed Purchaser Fédération Internationale des Ingénieurs-Conseils An Informed Purchaser is an Owner who either has the in-house technical expertise or engages outside experts necessary to:  clearly convey project vision;  evaluate and select consultants;  understand the risks and procedures inherent in project execution; and  follow through with proper O&M procedures and monitoring of outcomes.

07/09/ Informed Purchaser Fédération Internationale des Ingénieurs-Conseils The Informed Purchaser will be better equipped to incorporate other Quality-Based Principles at the project development phase, including: Capacity Building; Sustainability; and Monitoring of Outcomes.

07/09/ Quality – Who Needs It? Fédération Internationale des Ingénieurs-Conseils “It is unwise to pay too much, but it’s worse to pay too little. When you pay too little, you sometimes lose everything because the thing you bought was incapable of doing the thing you bought it to do.” “The common law of business balance prohibits paying a little and getting a lot – it can’t be done.” John Ruskin (1819 – 1900) British Poet, Scientist and Philosopher “Price has no meaning except in terms of the quality of the product.” Dr W. Edward Deming ( )

07/09/ Quality – Who Needs It? Fédération Internationale des Ingénieurs-Conseils Client: Public Sector  Spend public money wisely  Obtain best value, (which is not least cost);  Have regard to operating and life cycle costs;  Have regard to environment and sustainability  Encourage innovation  Encourage development of viable industry: capacity building  Avoid disputes, delays, non-productive costs

07/09/ Quality – Who Needs It? Fédération Internationale des Ingénieurs-Conseils Client: Private Sector  Spend shareholders money wisely  Obtain best value, (which is not least cost);  Have regard to operating and life cycle costs;  Have regard to environment and sustainability  Encourage innovation  Develop partnerships  Avoid disputes, delays, non-productive costs  Protect investment by the purchase of quality product

07/09/ Quality – Who Needs It? Fédération Internationale des Ingénieurs-Conseils Client: Design Build Contractor  Need to win the project;  Encourage innovation  Need to satisfy Clients Brief (needs expert advice)  Need to be able to construct for the price tendered  Avoid disputes, delays, non-productive costs  Develop partnerships

07/09/ Quality Fédération Internationale des Ingénieurs-Conseils Low cost and lack of integrity inevitably lead to poor design and poor quality in the completed project.

07/09/ Quality in Selection of Consulting Engineers Fédération Internationale des Ingénieurs-Conseils The procurement of consulting engineer services has the greatest impact on the Life-Cycle Cost of the project, yet is the least costly component. The Owner’s challenge is to get a good “return on investment” in design services. Life Cycle Cost Impact on Project Success Engineering Construction Representation of Typical Life Cycle Cost and Impact on Project Success Operation & Maintenance

07/09/ Fédération Internationale des Ingénieurs-Conseils

07/09/ Fédération Internationale des Ingénieurs-Conseils FIDIC – Principles of Best Practice Procurement FIDIC Guidelines for Selection  Quality  Transparency  Capacity Building  Integrity  Fair Competition  Harmonisation  Liability  Monitoring Outcomes

07/09/ The Steps in the Procurement Process Fédération Internationale des Ingénieurs-Conseils  Announcement and Pre-qualification (long listing)  Short List  Request for Proposal  Letter of Invitation  Terms of Reference  Information to Consultant  The Proposed Agreement  Preparation and Submission of Proposal  Receipt and Opening of Proposals  Evaluation  Negotiation and Award  De-Briefing

07/09/ It is essential that the consultant addresses the TOR and the evaluation criteria faithfully and accurately. Fédération Internationale des Ingénieurs-Conseils Proposals

07/09/ Evaluation Fédération Internationale des Ingénieurs-Conseils This is a key feature of the Procurement Process which is so often carried out in a questionable way, thus frustrating quality consultants and penalising the end client.

07/09/ Recommended Criteria for the Selection of the Evaluating Committee Members Fédération Internationale des Ingénieurs-Conseils  Professional Experience  Familiarity with Selection and Evaluation  Objectivity  The Client Decides on the Number of Members  Independence

07/09/ The Contract Agreement Fédération Internationale des Ingénieurs-Conseils The recommended form of agreement is the FIDIC Client – Consultant Model Services Agreement (White Book) or at least a recognised standard contract, with appendices filled in as appropriate, reflecting the scope of work. The final TOR and the agreed methodology shall be incorporated in the scope of work. The selected firm should not be allowed to change the key staff or any major items included in its proposal, unless both parties agree that undue delay in the selection has made it necessary.

07/09/ Result of Good Quality Outcome Fédération Internationale des Ingénieurs-Conseils  Quality in Selection produces quality designs.  Quality designs produce quality projects.  Quality projects have fewer variation orders during construction.  Fewer variation orders result in lower construction costs.  Quality designs and lower construction costs result in lower life-cycle costs.  Quality in Selection is in the Owner’s best interest.

07/09/ Result of Poor Quality Outcome Fédération Internationale des Ingénieurs-Conseils Hyatt Regency Hotel, Kansas City, Missouri In July of 1981, two elevated walkways over the lobby of the Kansas City Hyatt Regency Hotel collapsed during a party, killing 111 people and injuring 188 others. In 1995 a pedestrian bridge collapsed at the Maccabiah Games in Israel causing the deaths by drowning of about 40 athletes. Engineering services for the structures were awarded on the basis of price.

07/09/ FIDIC Fédération Internationale des Ingénieurs-Conseils “ …selection of an Architect or Engineer solely on price-competition basis provides the potential for reductions in quality due to initial underestimation of the costs and resources required to adequately perform the work.” U.S. House of Representative Subcommittee Report on Structural Failures

07/09/ Business Integrity Management Fédération Internationale des Ingénieurs-Conseils  Corruption undermines the achievement of a Quality Outcome, and the practice of business integrity is crucial to fighting corruption.  FIDIC recommends that consulting engineers adopt the FIDIC Business Integrity Management System (BIMS), and that Owners have regard to this policy during selection.

07/09/ Capacity Building Fédération Internationale des Ingénieurs-Conseils  Improves the Quality Outcome of the constructed project.  Fee competition is detrimental to Capacity Building.  As a result of fee competition, local firms are not adequately compensated.  Banks may want to examine the need for “set-asides” of projects for local consultants.  The procurement for such “set-asides” should be based on quality principles.

07/09/ Sustainability Fédération Internationale des Ingénieurs-Conseils  Sustainability integrates the environmental, economic, and social dimensions of development, and is therefore fundamental to a Quality Outcome.  The FIDIC Project Sustainability Management (PSM) process provides a framework for the Owner and Engineer to balance project vision against cost and available alternatives, and select appropriate project goals and indicators for sustainable development. The indicators are linked back to higher level goals such as global warming, biodiversity, access to fresh water, and materials and energy use.

07/09/ Quality-Based Project Management Fédération Internationale des Ingénieurs-Conseils FIDIC recommends that consulting engineers adopt a Quality Management System, and that Owners have regard to this policy during selection. A Quality Management System is a formalized project management structure that incorporates:  Customer-focused leadership and organization;  Employee involvement;  A process and factual approach to decision making;  Continuous improvement; and  Mutually beneficial supplier (sub consultant) relationships.

07/09/ Quality-Based Construction Fédération Internationale des Ingénieurs-Conseils Quality principles extend to the tendering and construction phase. Means to incorporate quality principles include:  Prequalification of contractors;  Quality-based construction management procedures; and  Documentation of contractor performance.  Selection of Contractors to include quality elements

07/09/ Conclusion – A Working Partnership Fédération Internationale des Ingénieurs-Conseils The consulting engineering industry remains largely responsible for the planning, design, construction, inspection and management of the infrastructure needed to meet the world’s ever- increasing demand for food, water, sanitation, shelter, health services, transportation and energy. It tackles on a daily basis the problems of how to improve peoples’ lives while preserving natural resources in a world with a growing population.

07/09/ Conclusion Fédération Internationale des Ingénieurs-Conseils The incorporation of Quality-Based Principles in the execution of projects is essential to the achievement of the stated goal: a reversal of the trend of diminished Quality Outcomes on projects.

07/09/ Quality Fédération Internationale des Ingénieurs-Conseils “I told you to use Quality Principles to build this bridge.”