FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission.

Slides:



Advertisements
Similar presentations
Regulatory Process and Other Models Arizona Corporation Commission Fifth Biennial Transmission Assessment Commission Decision Workshop on Transmission.
Advertisements

Reliability Provisions of EPAct of 2005 & FERC’s Final Rule
Structuring and Implementing a Truly International ERO Kevin Kelly Director, Policy Analysis and Rulemaking Office of Markets, Tariffs and Rates Federal.
TransCanada Mainline O.E.B. STAR Presentation 5/20/2008.
Regulations Governing the Conduct of Open Seasons for Alaska Natural Gas Transportation Projects Federal Energy Regulatory Commission February 9, 2005.
1 PENDING FERC ISSUES RELATING TO THE ALASKA NATURAL GAS TRANSPORTATION PROJECT Presentation by Karol Lyn Newman Morgan, Lewis & Bockius, LLP November.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.
LNG USA 2005 IQPC Houston, Texas November 9, 2005 Bruce F. Kiely Baker Botts L.L.P. Washington, D.C.
The FERC Review Process and Interaction with State Authorities Council of State Governments July 27, 2005 Office of Energy Projects Federal Energy Regulatory.
LNG PAT WOOD III Federal Energy Regulatory Commission December 17, 2003.
Federal Energy Regulatory Commission
FERC Office of Energy Projects 1 Federal Energy Regulatory Commission EPAct of 2005 Effect on Review of LNG Facilities & Working with FERC CSO Annual meeting.
Federal Energy Regulatory Commission GITA Seminar on: New Construction Project Lifecycle JW Marriott Houston, TX September 20, 2004 Lonnie Lister, Chief.
National Energy Board Office national de l’énergie Pipeline Approvals in the Mackenzie Valley Jann Atkinson Environmental Specialist Applications Unit,
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
1 Cheyenne Tuscola Lebanon Clarington Meeker Wamsutter Opal “Rockies Express Pipeline”
The Natural Gas Act & NEPA: How will FERC review the proposed Dominion pipeline? Greg Buppert, Southern Environmental Law Center.
Natural Gas Transmission Networks: So You Want To Build A Pipeline?
© Copyright 2013 by K&L Gates LLP. All rights reserved. U.S. Natural Gas Pipelines: Regulatory and Policy Developments University of Pittsburgh School.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
Natural Gas Transmission Regulation in the US Jeff Wright, Chief Energy Infrastructure Policy Group Office of Energy Projects Federal Energy Regulatory.
Alaska Natural Gas Transportation System A North American Energy Solution Alaska Natural Gas Transportation System A North American Energy Solution November.
ALASKA NATURAL GAS SYMPOSIUM Regulatory Update J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission December 2, 2004.
Challenges in Transmission. 2 Environmental and Public Affairs Consulting for the Energy Industry Energy Sectors  Oil & Gas  Pipeline  Storage  LNG.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
= Yr NG price high point Data Source - AFDC. Natural gas prices historically have remained, in general, below crude oil prices, except during the winter.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
1 of 19 Development of Industry Standards Energy Regulatory Partnership Program Abuja, Nigeria July 14-18, 2008 Ikechukwu N. Nwabueze, Ph.D. Director,
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
B r a z o s R i v e r A u t h o r i t y FERC Encroachments.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
The Lifecycle of Grants: Grant Agreement and Fair Housing November 7, 2012.
“FERC-LITE,” WHOLESALE REFUND AUTHORITY, AND RELATED PROVISIONS NOVEMBER 10, 2005 ROBERT R. NORDHAUS VAN NESS FELDMAN WASHINGTON, DC (202)
THE NORTH AMERICAN LNG OPPORTUNITY APEGGA, Calgary, Alberta.
Douglas A. Sipe Outreach Manager Outreach Manager Division of Gas-Environment and Engineering Federal Energy Regulatory Commission Office of Energy Projects.
FERC Office of Energy Projects 1 Hydroelectric Licensing Regulations Final Rule July 23, 2003 Federal Energy Regulatory Commission Office of Energy Projects.
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
Entrega Project Update Wyoming Natural Gas Pipeline Authority – August 30, 2005 Entrega Gas Pipeline Inc.
Electric Transmission Lines and Utility Corridors.
1. 2 U.S. Natural Gas Demand in Increasing North American Gas Supplies are Dwindling and Becoming More Expensive Options Have Problems –Coal and Nuclear.
1.What is the standard relicensing process in the U.S. and what is the ALP (Alternative Licensing Process) ? 2.How did we convince FERC to agree to an.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
Office of Energy Projects 1 FERC Update Robert J. Cupina Deputy Director Office of Energy Projects Federal Energy Regulatory Commission Wyoming Infrastructure.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
FERC Office of Energy Projects 1 Richard Hoffmann, Director Division of Gas – Environment & Engineering Office of Energy Projects Policies Affecting.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
Landon Derentz Energy Policy Advisor Bureau of Energy Resources U.S. Department of State Shale Gas and Tight Oil Production in the United States 1.
1 Natomas Levee Improvement Program Crediting Issues Before the Central Valley Flood Protection Board February, 2009 Sacramento Area Flood Control Agency.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting November 8, 2005?? Item No. xx Supp. Meeting Date:
RECOMMENDATIONS OF THE GOVERNOR ’ S TASK FORCE ON CONTRACTING AND PROCUREMENT REVIEW Report Overview PD Customer Forum September 2002.
Indian Health Service Grants Management Grants 101- Fundamentals.
California Energy Commission 1 LNG Permitting and Environmental Review: the View from California DOE LNG Forum Los Angeles June 1, 2006 Kevin Kennedy,
LNG Permitting: You Want it When? Lauren H. O’Donnell Deputy Director, DG2E Office of Energy Projects.
Entrega Gas Pipeline Project Wyoming Natural Gas Pipeline Authority - August 24, 2004.
INTERSTATE PIPELINE FORUM Presented by: Rebecca F. Zachas, Esq.
Alaska Legislature Senate/House Resources & Energy Committees February 2010.
Atlantic Coast Pipeline NCEDA MidWinter Conference March 9, 2016.
Atlantic Coast Pipeline Fayetteville Regional Association of Realtors March 15, 2016.
RTO WEST Summary of RTO West 9/18/02 Declaratory Order Presentation to The Committee on Regional Electrical Power Cooperation (CREPC) by John Carr 10/1/02.
ALASKA GASLINE DEVELOPMENT CORP. | Tel: | Toll-Free: | Fax: | Website: 1 ASAP Project Update Presented.
Denali – The Alaska Gas Pipeline
GRI-S : Infrastructures The Union list of projects of common interest
The Electric Reliability Organization: Getting from here to there.
Delta Water Supply Project
Overview & Status July 18, 2001.
2013 Preconstruction Managers Meeting
Presentation transcript:

FERC and the Development of an Alaska Natural Gas Pipeline Robert J. Cupina, Deputy Director Office of Energy Projects Federal Energy Regulatory Commission September 19, 2005

FERC Office of Energy Projects 2 Applies to any initial or voluntary expansion capacity on any Alaskan natural gas transportation project. Alaska Natural Gas Pipeline Act Open Season Provisions

FERC Office of Energy Projects 3 Regulations to be issued 120 days after passage Must cover procedures for the allocation of capacity and timing of any open seasons Alaska Natural Gas Pipeline Act Open Season Provisions

FERC Office of Energy Projects 4 Must promote competition in the, development of Alaskan natural gas Expansion open seasons must allow for transportation of natural gas from other production areas. Alaska Natural Gas Pipeline Act Open Season Provisions

FERC Office of Energy Projects 5 Alaska Natural Gas Pipeline Act Open Season Provisions Open season provisions were finalized in Order No. 2005, on February 9, 2005 Rehearing on open season provisions were considered in Order No A, issued on June 1, 2005

FERC Office of Energy Projects 6 Months Open Season Begins Application Filed at FERC Alaska Pipeline Capacity Allocation Process Capacity Allocations Announced Allocations Challenged/ Contracts Signed Open Season Ends FERC Review of Open Season Plans

FERC Office of Energy Projects 7 Open Season Process in NOPR No advance notice Open season held for 90 days after 90 day prior notice period Capacity awarded Contracts signed Application filed

FERC Office of Energy Projects 8 Open Season Policy Considerations Balance encouragement of project construction with fair and open competition Rebuttable presumption for rolled-in rate treatment of costs of expansions Balance appropriate oversight with letting market forces work

FERC Office of Energy Projects 9 Alaska Natural Gas Pipeline Act FERC Process Under Section 103 or 110 Retains NGA duties Issues open season regs in 120 days Establishes rates, terms and conditions of tariff May approve or require future expansion May provide access to Alaska royalty gas Cooperate with Federal Coordinator and other agencies

FERC Office of Energy Projects 10 Alaska Natural Gas Pipeline Act FERC Process Under Section 110 Review previous certificate; determine level of info needed to satisfy terms and conditions Change previous certificate, as needed Issue final order, no timeframe Lead agency determined by DOE Secretary

FERC Office of Energy Projects 11 Alaska Natural Gas Pipeline Act FERC Process Under Section 103 Normal review process with 2 exceptions: –Presumption of public need –Presumption of adequate downstream capacity “Over-the-top” route prohibited Lead agency for NEPA review Issue DEIS 12 months after application Issue FEIS 6 months after DEIS

FERC Office of Energy Projects MONTHS -6 0 Approve Pre-Filing Request Public Scoping, Community Outreach, and Native Alaskan Consultation Review Draft Resource Reports Complete Application Filed Evaluation of Application Issue Draft EIS Issue Final EIS Final Order Complete Application Filed Analysis and Documentation Receive and Respond to Comments 0 6 MONTHS Environmental Review Process for a Section 103 Project

FERC Office of Energy Projects 13 Pre-Filing Process About 18 months from Green Light to Complete Application Two field seasons Parallel Activities of Staff and Sponsor

FERC Office of Energy Projects 14 Pre-Filing Process FERC Staff Activity –Route recognizance –Community outreach and public scoping –Native Alaskan consultation –Identify issues and resolve conflicts

FERC Office of Energy Projects 15 Pre-Filing Process Project Sponsor Activity –Stakeholder identification –Open Houses –Route studies and field surveys –Prepare FERC and other permit applications

FERC Office of Energy Projects 16 Application Review Verify and Document Data Coordinate Agency Analyses Develop Mitigation Issue Draft and Final EIS

FERC Office of Energy Projects 17 Post-Certification Activities Two to three years of preparation prior to construction –Financing –Fabrication of Equipment and Supplies Two to three years for construction –Primarily winter construction

FERC Office of Energy Projects 18 Activities to Date Memoranda of Understanding (MOU) –FERC and National Energy Board of Canada (5/10/04) –FERC and Regulatory Commission of Alaska (1/24/03) –Under development with DOE, DOI, and 11 other federal agencies

FERC Office of Energy Projects 19 Activities to Date Toured the pipeline route and met with stakeholders. Meetings with U.S. federal, state, and Canadian agencies

FERC Office of Energy Projects 20 Alaska Gasline Port Authority LNG Project 800 mile, 48” pipeline parallel to TAPS route from Prudhoe Bay to Valdez 125 mile lateral line for deliveries to South Central and Kenai areas Liquefaction plant/terminal in Valdez Destination: West Coast regas terminals in Canada, Lower 48 or Mexico FERC implications: –Yukon Pacific 1995 authorization for export terminal –TAGS line would require certificate

FERC Office of Energy Projects 21 Alaska Pipeline Construction Timeline – Example Case Timeline assumes Canada completes permitting within same timeframe. Stranded Gas Act award Dec ’05 Mar ‘06 Jun ‘06 Dec ‘07 Jun ‘09 Application filed EIS FERC Order Aug ‘09 Obtain permits, Purchase pipe, compressors, etc. Aug ‘12 Staging of camps, bridges, roads, and delivery of pipe Aug ‘15 Construction In service Aug ‘16 Beginning of open season process Preparation time assumes the producer’s 52” pipe About 1 year to produce and treat gas and fill the pipeline 18- Month Pre- Filing Process Begins End of open season process Sep ‘06 Aug ‘10

FERC Office of Energy Projects 22 US Natural Gas Balance