Emergency Planning at ACF-Paris

Slides:



Advertisements
Similar presentations
Questions and Answers: About the ECB Project AIM Standing Team workshop: Joint Evaluations Casablanca, November 2011.
Advertisements

GP-DRR Parallel Meeting Disaster Preparedness M C. Oxley 4 th June 2007 Purpose: To stimulate substantive discussion on disaster preparedness in support.
Tips and Resources IASC Cluster/Sector Leadership Training
Disaster Management Civil-Military Coordination
GBV Guidelines on Coordination Stresses the multi-sectoral approach Promotes establishment of inter- agency and multi-sector working groups Provide important.
Mass Shelter Capability Project
Exercise Swaps Community Emergency Response Team.
The IASC Transformative Agenda. Floods inFloods inPakistan 2010 Earthquakes In HaitiIn Haiti UN Photo/Logan AbassiUN Photo/Evan Schneider.
Pillar 4a Information management
IFRC Shelter Technical Training Yverdon-Les-Bains, Switzerland | 3 rd – 7 th March 2008 This session describes the benefits of developing a strategic plan.
Comprehensive M&E Systems
Humanitarian Programme Cycle 2015 August
Minnesota Manual of Accommodations for Students with Disabilities Training Guide
Technical Components of Education in Emergencies.
FUNCTION 6 – CONTINGENCY PLAN, PREPAREDNESS AND CAPACITY BUILDING
Protection in natural disasters Presentation to the IASC Weekly Meeting, Geneva 8 October CHD/PCWG.
Felix Omunu Disaster Risk Reduction Officer, Oxfam GB
Saving lives, changing minds. Contingency Planning and Response Preparedness Recent developments and approaches.
Community Preparedness & Disaster Planning. Why Disasters occur ?
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
Contingency Planning and Emergency Preparedness Process and Practice PCWG Protection Cluster Coordination Training 2008.
Inter-Agency Contingency Planning: Concepts & Process
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
FUNCTION 2 – ‘INFORMING STRATEGIC DECISION-MAKING’: Needs assessment and response gap analysis across sectors and within the sector MODULE 2 – S1.
1. IASC Operational Guidance on Coordinated Assessments (session 05) Information in Disasters Workshop Tanoa Plaza Hotel, Suva, Fiji June
Coordination and Net Working on DRR Rapid Emergency Assessment and Coordination Team (REACT) Bishkek November, 2009.
Toolkit for Mainstreaming HIV and AIDS in the Education Sector Guidelines for Development Cooperation Agencies.
Day 5: Advocacy. FUNCTION 6 – CONTINGENCY PLAN, PREPAREDNESS AND CAPACITY BUILDING M6 – S1.
1 Pacific Logistics Cluster. 2 What is Logistics ? Several Definitions… Getting the right thing at the right time in the right place at the right cost…
INEE Regional Tools Launch Washington, DC July 1, 2010.
Assessments. Assessment in the Project Cycle DESIGN IMPLEMENTATION MONITORING EVALUATION ASSESSMENT.
Assessing The Development Needs of the Statistical System NSDS Workshop, Trinidad and Tobago, July 27-29, 2009 Presented by Barbados.
McRAM Pakistan A Lesson in Assessment Preparedness.
INEE MS Contextualization Juba, South Sudan 6-9 March, 2012.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
Draft Zero Terms of Reference FSC (Humanitarian) Technical Team FSC Meeting Dhaka 18 April 2012.
Risk and Crisis Management Building OECD Principles on Country Crisis Management.
Improving Partnership Can Improve Humanitarian Action Summary of Global Humanitarian Platform Discussion: Recommendations, Action Points, and Challenges.
CARE International Humanitarian Accountability Framework (HAF) March 2010.
Concern Worldwide’s Approach to Disaster Risk Reduction.
Disaster Preparedness and Response Strategy. Agency Mandate Rapid Response’s mandate is to respond to any emergency that puts at great risk the survival,
Evolution to date: where the clusters have come from, where have we reached and where should we be heading? GNC Annual Meeting 13 th -15 th October, Nairobi,
Study on transition of humanitarian coordination functions October
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
Session Understanding humanitarian emergencies.
FUNCTION 6 – CONTINGENCY PLAN, PREPAREDNESS AND CAPACITY BUILDING M6 – S1.
Health Risk Assessment (HRA): Workshop Guide. 2 What is an HRA? An HRA identifies and ranks the hazards in your community according to the following equation:
Emergency Preparedness Planning: Middle East January 9 th -11 th.
IASC Task Force on Meeting Humanitarian Challenges in Urban Areas (MHCUA) Draft Strategic Framework TF meeting GVA Roger Zetter.
Building Strong Library Associations | Sustaining Your Library Association BSLA Stakeholders Workshop Yaounde, Cameroon, April 2012 Managing Relationships.
Minnesota Manual of Accommodations for Students with Disabilities Training January 2010.
1 State of Kenya Population Report Challenges, Opportunities and Recommendations.
IASC Task Team on Accountability to Affected Populations and Protection from sexual Exploitation and Abuse (AAP/PSEA) What should happen with the TT after.
© Plan Plan’s Security Framework – A Refresher. © Plan Understanding Ourselves Values - Child Rights, Impartial, Neutral, Sensitive Mandate - Child Centred,
Community-Based Coastal Adaptation Planning Presenter Name Date.
Session 2: Developing a Comprehensive M&E Work Plan.
S3.1 session day 3 1 training delivered by Oxfam GB, RedR India and Humanitarian Benchmark; January 2012, Yangon, Myanmar approved by the Advisory.
Common Needs Assessments Context: Sudden onset humanitarian emergencies: Can and should logistics play a stronger role in rapid assessments?
Cluster Coordinator for Early Recovery Training Review of Key Readings.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Assessments ASSESSMENTS. Assessments The Rationale and Purpose for Assessments.
CMS Policy & Procedures
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
LEARNING REPORT 2016 Disasters and Emergencies Preparedness Programme
REACH Mission & Objectives
The Two Most Common Types of Contemporary Planning Techniques
“ Cash preparedness in Asia Pacific”
Developing a shelter strategy
The Two Most Common Types of Contemporary Planning Techniques
Emergency Planning at ACF-Paris
Presentation transcript:

Emergency Planning at ACF-Paris

Amuse-bouche Ask yourself the following questions: What could be emergency planning ? Why would ACF need to do it ?

Amuse-bouche If you lack inspiration to answer the previous questions, here are more questions: If another flood would occur tomorrow in your country... What would be the impact on the people affected? What actions would be required to meet humanitarian needs? How would organisations work together? What resources would be required? What could ACF do to be better prepared next time?

Amuse-bouche Answers: What could be emergency planning ? Emergency planning is asking yourself before any disaster occurs: What kind of disaster could happen? What would be the impact on the people affected? What actions would be required to meet humanitarian needs? How would agencies work together? What resources would be required? What could organisations do to be better prepared to disasters?, etc.  Why would ACF need to do it ? Emergency planning enables to plan what could happen if a disaster occured and how ACF would respond to it. When disaster finally occurs, the response is already prepared and ACF can better meet humanitarian needs.

1. What is emergency planning? Emergency planning involves identifying, strengthening and organising resources and capacities so as to reach a level of preparedness for timely and effective response to a potential disaster. This includes: Determining roles and responsibilities; Developing policies and procedures; Identifying and developing generic tools for response (e.g. the use of National Disaster Response Teams (NDRT), information management, etc.). IFRC Disaster Response and Contingency Planning Guide

Emergency planning levels Five existing level of Emergency planning (EP) Global EP Organisation EP Inter agencies EP National/Regional EP Community EP Common emergencies: Hurricanes/cyclones Famine Floods Economic collapse Earthquakes Internal conflict/War Droughts Displacement/forced migration Crop failure Border closures Volcanic eruptions Food aid pipeline breaks Tsunamis Peace Landslides Prepositioning Epidemics Logistical bottlenecks 6

1. What is emergency planning? EMERGENCY PLANNING IS NOT CONTINGENCY PLANNING Emergency planning is preliminary in nature, based on educated assumptions of risks and hazards, and does not address specific disaster scenarios – as is the case for contingency plans. Once a disaster occurs, plans must then be monitored, evaluated and adapted to the specific situation. Contingency planning focuses on specific disaster events with a high risk of occurrence and linked to high levels of vulnerability; they identify in detail the potential humanitarian needs, actions, resources, constraints and gaps.  Although both emergency and contingency plans include similar steps, the perspectives from which they are written and the level of detail required are different. IFRC Disaster Response and Contingency Planning Guide

2. Why emergency planning? The fundamental reason for emergency planning is to improve the efficiency of a humanitarian emergency response. Emergency planning helps humanitarian actors to plan while there is time. Experience demonstrates that emergency planning can enhance the effectiveness, appropriateness and timeliness of response to emergencies. We all have a general sense of planning. Before we look more specifically at planning let’s see if we understand why we plan. QUESTION: What are the ultimate (external) benefits of planning? WRITE ANSWERS ON NEWSPRINT. BE PREPARED TO SEPARATE EXTERNAL AND INTERAL BENEFITS. “Good list. To provide us more common background, let’s look at some definitions of disaster.”

2. Why emergency planning? There are many good reasons why NGO’s should do emergency planning: Deal with anticipated problems before the onset of a crisis Put in place measures that enhance preparedness Time Enhance the quality of humanitarian response! Establish relationships with partners Develop shared understanding of common challenges Clarify roles and responsibilities Strengthen coordination mechanisms Relationships Facilitator’s option: Ask the audience to cite some of the benefits of contingency planning. If you can do it without slowing things down, capture them on a flip chart so you can reference their thoughts later in the session. The benefits should fall into one of 3 categories: Time, Relationships, Effectiveness. (Efficiency may come up which could be captured in those 3 categories). Examples of the benefits are provided with each category. The audience may have already cited some of these. If there are benefits they cited which are not on here, you may want to acknowledge them and indicate which category they contribute to. Concluding message: These benefits are just part of the picture. The overarching benefit is to enhance the quality of the humanitarian response. It is important to always keep this goal in mind when you are engaged in a contingency planning process. Identify constraints to effective response actions Focus on operational issues Effectiveness 9 9

3. How to do emergency planning? Preparedness Elaboration of the plan Disaster Implementation of the plan

Emergency planning steps Emergency planning is a tool to anticipate and solve problems that typically arise during humanitarian response: Analyse potential emergencies Analyse potential impact Establish clear response strategies Implement preparedness actions Example: Due to unusual weather patterns, Country X is at risk of large scale flooding this year. Up to 250 000 people would be displaced from their homes and 55% of domestic crop production would be wiped out. Temporary settlement site identification and design Protecting the most fertile crop lands - Determine communication channel during emergency - Design of a contingency stock - Disaster preparedness activities (if funds available) 11 11

3. How to do emergency planning? is A DOCUMENT and A PROCESS Plan vs. Planning “Fill in the blank templates defeat the socialization, mutual learning and role acceptance that are so important to achieving effective planning and a successful response.” Federal Emergency Management Agency

4. Who is involved in emergency planning? Emergency planning is a question of teamwork: Emergency planning is most effective when it is a participatory process that includes all those who will be required to work together in the event an emergency. Need for inputs and support from a variety of people in different positions: governance, senior managers, sectoral technicians, volunteers, administrative personnel, logisticians, etc. Need for coordination with external actors. IFRC Disaster Response and Contingency Planning Guide

5. How long will it require? Draft schedule of the emergency planning process and expected outputs from the staff: Duration Stages of the process Expected involvement of the mission Phase 1 3 weeks Part 1 : Background and Context Analysis Part 2 : Analysing Risks - To provide data - To be interviewed by the facilitator - To validate the gathered information Phase 2 1 month Part 3 : Assessing Needs Part 4 : Designing Response - To participate to 2 to 4 half days workshops to build scenarios and response strategies - To build the mission’s toolbox Phase 3 Part 5 : Activating Response Plan Part 6 : Activating Preparedness Plan - To provide the requested - To get prepared to respond to emergency (incl. training plans)

6. ACF-Paris tools Emergency Preparedness and Response Planning Kit (on line version and DVD format)

6. ACF-Paris tools ACF-Paris tools include:  Framework Note on Emergency Planning at ACF-Paris  Emergency Preparedness and Response Plan (EPRP) Format  ACF-Paris Toolbox to Prepare Emergency Responses GOAL: the mission has to elaborate its own tools for emergency preparedness and response. This implies: To fill in the ERPP Format To build its own Toolbox

7. Key issues There will be a dedicated resource (internal or external) – the facilitator - to implement emergency planning at the mission level. Two crucial issues for the process to be a success are: Appropriation by the mission All members of the mission, in particular those with sector responsibilities, are expected to ensure adequate coordination during the planning process within their respective sectors / clusters and agencies / organizations / local partners. Training of ACF staffs and partners The proposed methodology (EPR Plan and Toolbox) is just a proposition and has to be adapted to each ACF mission. These tools are FLEXIBLE! *HANDOUT – WORK PLAN

To be continued…