RETS REMP 2007 Philadelphia, PA June 25 – 27, 2007 Eric L. Darois, CHP

Slides:



Advertisements
Similar presentations
Site Conceptual Models
Advertisements

Site Characterization Instructional Goal: Upon completion of this topic the participant will better understand the need to identify and evaluate various.
Overview of the EPRI Groundwater Assessment Program
Effluent Releases ANI - Update William Wendland, P.E. American Nuclear Insurers Glastonbury, Connecticut USA Mashantucket, CT June 2006 “ RETS – REMP WORKSHOP.
Application Update of ANI Guideline “ Potential for Unmonitored & Unplanned Off- Site Releases of Radioactive Material” William Wendland, P.E. American.
Application of ANI Guideline William Wendland, P.E. American Nuclear Insurers Glastonbury, Connecticut USA Philadelphia, PA June 2007 “ RETS – REMP.
Case Study of Subsurface Vapor Intrusion at a Dry Cleaner Site Amy Goldberg Day AEHS Annual East Coast Conference on Soils, Sediments.
1 MARLAP, MARSSIM and RETS- REMP: How is All of this Related…or NOT? Robert Litman, Ph.D. Eric L. Darois, MS, CHP Radiation Safety & Control Services,
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
New Groundwater Techniques and Technologies 17 th Annual RETS REMP Conference June 25-27, 2007 Eric L. Darois, CHP EPRI Consultant/RSCS Inc.
2014 Vapor Intrusion Guidance Amendments Discussion Points Waste Site Cleanup Advisory Committee Meeting May 22, 2014.
BoRit Superfund Site Timeline
RETS – REMP Workshop NRC Activities June 25, 2007 Presented by Steve Garry.
1 Characterization of Groundwater Contamination at Yankee Nuclear Power Station - Rowe, MA RETS-REMP Workshop June 26-28, 2006 – Mashantucket, CT Dave.
Delivering sustainable solutions in a more competitive world Managing Your Groundwater Program - Do’s and Don’ts Matthew Daly, P.G RETS-REMP Philadelphia,
Groundwater Protection Initiative Status George Oliver RETS/REMP Conference June 25-27, 2007.
1 Potential Sources of Groundwater Contamination at Nuclear Power Plants RETS-REMP Workshop Nine Mile Point- Constellation Energy June th, 2004 Eric.
Brunswick Nuclear Plant Storm Drain Stabilization Pond Groundwater Investigation and Remedial Evaluation Presentation Prepared and Presented by: Silar.
Brunswick Nuclear Plant Storm Drain Stabilization Pond Tritium Issues.
Modeling boiling water reactor main steam isolation valve leakage using MELCOR Presented at the 21 st Annual Regulatory Information Conference March 10-12,
REMP Ramblings 2006 RETS/REMP Workshop Jim Key Key Solutions, Inc.
Presented at the 2007 RETS/REMP Workshop J. Stewart Bland, CHP Chesapeake Nuclear Services, Inc. Annapolis, MD June 27,
1 Hydraulic Fracturing Regulatory Processes in Louisiana James H. Welsh Commissioner of Conservation.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
Vermont Yankee VSNAP Presentation February 22, 2011 Mike Romeo Director NSA.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
EnviroSense, Inc. An Overview of Environmental Factors in Developing Brownfields Sites in Massachusetts Presented By: Eric S. Wood, P.Hg., PG, LSP President.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
Wellhead Protection Strategies: Keys to Success Prepared by: Mr. Brian Oram, PG, Licensed Driller, PASEO B.F Environmental Consultants and Wilkes University.
Investigating Ground Water Contamination at Ohio’s C&DD Landfills Aaron Shear Ohio’s Solid Waste and C&DD Program Annual Meeting May 9, 2013.
Module 4: Getting Ready: Scoping the RI/FS. 2 Module Objectives  Explain the purpose of the scoping phase of the RI/FS  Identify existing data which.
Sean Bushart- EPRI Karen Kim- EPRI NRC RIC Conference-
Karen Kim Sr. Project Engineer, EPRI
TECHNICAL ASSOCIATION OF THE EUROPEAN NATURAL GAS INDUSTRY Development of a Eurogas-Marcogaz Methodology for Estimation of Methane Emissions Angelo Riva.
Industry Nuclear Safety Culture* Process Thomas C. Houghton Director, Safety Focused Regulation Nuclear Energy Institute March 12, 2009 *Nuclear Safety.
Engineering Standards Working Group Annual Meeting June 24-25, 2002 DOE Nevada Support Facility June 2002 Joe B Stringer, PE Framatome ANP DE&S.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Monitoring Well Post-Installation Consideration By: Pierre-Orly Dupont.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
NATO-CCMS Pilot Study Tour de Table - Greece Recent Developments on Contaminated Land in Greece Anthimos Xenidis Laboratory of Metallurgy National Technical.
William Wendland, P.E. American Nuclear Insurers Glastonbury, Connecticut USA South Bend, IN June 2009 “ RETS – REMP Workshop 2009” AMERICAN NUCLEAR INSURERS.
Monitoring and Protecting Groundwater During Oil & Gas Development Overview of Colorado Aquifer Systems November 26, 2012 Christopher J. Sanchez, P.G.
Groundwater Protection Initiative And Other Issues Of Interest George Oliver RETS/REMP Conference Charlotte, NC June 23, 2008.
Fairbanks Areawide Industrial Reclamation Project ADEC AREAWIDE MANAGEMENT GOALS Janice Wiegers ADEC.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
USEPA Region 2 Vapor Intrusion Study Cayuga Groundwater Contamination Site March 4, 2009.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
IAEA International Atomic Energy Agency Summary and Overview of TECDOC Russel Edge Decommissioning and Remediation Unit Division of Radiation,Transport.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
SEA in the Czech Republic Prague, 24 September 2008.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
Groundwater Protection Project Greg Robison Project Manager Ed Sullivan Consulting Engineer June 23, 2008.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Flooding Walkdown Guidance
Welcome.
Presentation transcript:

RETS REMP 2007 Philadelphia, PA June 25 – 27, 2007 Eric L. Darois, CHP EPRI Guideline for Implementing a Groundwater Protection Program at Nuclear Power Plants RETS REMP 2007 Philadelphia, PA June 25 – 27, 2007 Eric L. Darois, CHP

Implementing Schedule Draft Issued March 2007 for Industry Comments Review and Disposition Comments – June 2007 Issue Final Document – November 2007

EPRI Groundwater Protection Guidelines Objectives Provide guidance for development of robust and technically sound optimized programs for groundwater protection at nuclear power plants. Control Licensed Material from Entering the Subsurface Minimize Unplanned Unmonitored Releases Minimize Long-Term Costs for Remediation

Participating Companies Ameren UE American Electric Power American Nuclear Insurers AREVA Connecticut Yankee Constellation Energy Group Dominion DTE Energy Co. Duke Energy Corp. Energy Northwest Entergy Exelon FirstEnergy Nuclear Operating Co. Florida Power & Light Co. General Electric Nuclear Energy Institute Nuclear Management Co. Ontario Power Generation Omaha Public Power District Pacific Gas & Electric Co. Public Service Electric & Gas Co. PPL Susquehanna Progress Energy Southern Nuclear Operating Co. Southern California Edison South Texas Project Nuclear Operating Co. Tennessee Valley Authority Westinghouse Yankee Atomic Electric Company

Guideline Content Evaluation of Potential Subsurface Releases Establishing The Priority Index Values Determining The Program Levels With The Graded Approach Establishing a Site Conceptual Model Locating, Installing and Testing Groundwater Monitoring Wells Establishing a Groundwater Sampling and Analysis Process Evaluating Sampling and Monitoring Data Program Validation and Review Communicating With Stakeholders and Regulators Potential Mitigating Actions Decommissioning Considerations

Appendices Appendix A: Practical Examples Of A Graded Approach Application Appendix B: List Of Guidance Statements Appendix C: Non-technical Issues That May Be Considered When Determining Priority Indices Appendix D: Sample List Of Systems, Structures And Components Appendix E: Checklist Of Elements To Include In A Review Of Systems, Structures, Components And Work Practices Appendix F: Determination Of Condition Of SSCs Appendix G: Basis For ‘Hazard’ And ‘Mobility’ Priority Factor Values Appendix H: Site Characterization And The Site Conceptual Model Appendix I: Identifying Predominant Groundwater Flow Directions And Mechanisms Appendix J: An Example Of A Groundwater Monitoring Procedure Appendix K: An Example Of A Groundwater Sampling Plan Appendix L: An Example Of A Study Conducted To Estimate The Effect Of Atmospheric Deposition Of Tritium On Groundwater Appendix M: Fate And Transport Numerical Modeling

Evaluation of Potential Subsurface Releases Historical Spills Evaluate SSCs Containing Liquid Radioactivity Identify Preventive Maintenance and Inspection Programs Evaluate Work Practices Evaluate Potential Ongoing Releases

Establishing Priority Index (PI) Values Performed for: Selected SSCs and Work Practices Major Changes in SSCs/Work Practices Maximum PI Score among All SSCs/Work Practices Determines Site Score Mitigating Actions Are Allowed to Lower Score PI Factors Likelihood – 4 Factors Consequence – 4 Factors

Determination of Contamination Risk Priority Index Methodology Priority Index (PI)= Likelihood x Consequence x N HL = History (0-3) CL = Condition (0-3) DL = Design (0-3) PL = Pre-release Detection (1-3) IC = Inventory (1-3) HC = Hazard (1-3) MC = Mobility (1-3) PC = Post-release Detection (1-3) N – Normalizing Factor. Resulting Scores 1 to 100

EPRI Groundwater Protection Guidelines: Step 1-Priority Index Determination

Priority Index = 76 Likelihood Priority Factors For Site 1, The Containment Sump Re-Circ Line has a calculated PI of 76. Likelihood Priority Factors: History (3): A containment sump re-circulation line has been identified as having leaked to the subsurface Condition (2): A pressure test of the system has did not reveal a substantial volumetric leak. However, some uncertainty over the possibility of a small leak (< 1 gpd) remains. Design (3): This is a single-walled subsurface pipe. Pre-Release Detection (3): A non-catastrophic release would not be detected until radioactive material had been detected external to the pipe.

Priority Index = 76 Likelihood Calculation

Priority Index = 76 Consequence Priority Factors For Site 1, The Containment Sump Re-Circ Line has a the max calculated PI value. Consequence Priority Factors: Inventory (3): Low volume of liquid but high concentration (~2E7 pCi/L) of tritium Hazard (3): This pipe likely contains Cs-137 and Sr-90 (from prior fuel defects). Mobility (3): Potential contamination from this source could enter a fractured bedrock system. Post-Release Detection (2): An onsite monitoring well is located approximately 300 feet from this pipe in the down-gradient flow path.

Priority Index = 76 Consequence Calculation

Priority Index = 50 Likelihood Priority Factors For Site 3, the Aux Boiler Sump is unlined and may have leaked water to the environment. Likelihood Priority Factors: History (2): The sump’s water inventory has been observed to vary, indicating that some of this water was lost to the environment. Condition (2): Various attempts in sealing the sump have not corrected the above condition. Design (2): The sump was sealed with a coating (which may not be functioning properly) during its original construction. Pre-Release Detection (3): Leakage through this sump is not detected until its entry into the environment

Priority Index = 50 Likelihood Calculation

Priority Index = 50 Consequence Priority Factors For Site 3, the Aux Boiler Sump is unlined and may have leaked water to the environment. Consequence Priority Factors: Inventory (1): Low liquid volume with a moderate tritium concentration (180,000 pCi/L). Hazard (1): Only very low levels of activation products have been detected in this sump. Mobility (3): Tritium is very mobile in the environment. Post-Release Detection (3): This site currently has only two onsite monitoring wells, neither of which is located down-gradient from this sump – leak from this system may not be detected in these wells.

Priority Index = 50 Consequence Calculation

EPRI Groundwater Protection Guidelines Step 2- Graded Approach Determination

Recommended Groundwater Protection Program (Level I “Baseline”) Design and Installation Requirements Develop The Site Conceptual Model (5.1) Review Aerial Photos And Engineering Drawings (5.2) Review Previous Hydrogeologic Reports (5.3) Evaluate Potential Receptors Of Groundwater Contamination (5.4) Review State And Local Regulations (5.5) Determine Groundwater Elevation (5.6.1) Evaluate Pre-operational Groundwater And Geologic Data (5.6.2) Determine Regional Hydrogeologic Characteristics (5.6.3) Install Wells (5.7.1) Determine Horizontal Distribution And Movement (5.7.2) Establish And Document DQOs For Well Drilling (6.1) Institute Configuration Management For Well Drilling (6.2.1) Review Permitting Requirements For Well Drilling (6.2.2) Ensure Sampling Accessibility (6.2.3) Construct Monitoring Wells (6.3) Develop And Implement A Maintenance Program For Monitoring Wells (6.4)

Recommended Groundwater Protection Program (Level I “Baseline”) – Sampling, Analysis, and Data Management Establish And Document DQOs For Groundwater Sampling (7.1) Establish Sample Collection Procedures (7.2) Establish Analyte List(s) (7.3) Establish MDC Requirements And Criteria For Positive Detection (7.4) Establish Sample Volume, Container And Preservation Requirements (7.5) Establish Sampling Schedule (7.6) Validate Analytical Results (7.7) Evaluate Analytical Data (8.1) Evaluate Field Water-quality Indicator Data (8.2) Provide For Management And Data Quality Assessment Of Analytical Data (8.3)

Recommended Groundwater Protection Program (Level I “Baseline”) – Data Assessment Evaluate Background Radionuclide Concentrations (8.4.1) Evaluate Atmospheric Deposition Of Plant-related Radionuclides (8.4.2) Evaluate Plant-related Liquid Pathways (8.4.3) Review And Revise The Site Conceptual Model (8.5) Perform Initial Independent Review (9.1) Revalidate Priority Index Ratings (9.2)

Recommended Groundwater Protection Program (Level II & III) Level II (50 < PI ≤ 75) Implement All Program Elements From Program Level I Determine Vertical Distribution And Movement (5.7.3) Consider Use Of Water-level Transducers (6.5.1) Level III (75 < PI) Implement All Program Elements From Program Levels I And II Aquifer Test For Flow Regimes, Connectivity, Hydraulic Conductivity (5.7.4) Conduct Geophysical Testing (6.5.2) Consider Use Of Hydraulic Conductivity Testing (6.5.3) Consider Use Of Hydrophysical Testing (6.5.4) Consider Use Of Fate And Transport Numerical Modeling (8.6)

Establishing a Site Conceptual Model Initial Data Input Aerial Photos, Engineering Drawings, Construction Photos Prior Hydrogeologic Reports Regional Groundwater Flow Information Ongoing Development of a CSM Well Installations and Monitoring Water Elevations Groundwater Quality Data (Temp, pH, Conductivity, Concentrations, Oxygen etc..) Flow Regimes, Connectivity and Conductivity Horizontal/Vertical Distribution and Movement

Well Installation Data Quality Objectives Process – Document Process Purpose Depth and Well Design Measurement of Field Water Quality Parameters During Drilling/Construction Document Final “as-built” and Include in Configuration Management Process

Sampling and Analysis and Assessment DQO Process Required Written Sample Collection Procedures Justify Analyte List Specify Required Minimum Detectable Concentrations Specify Container Types and Sample Preservation Requirements Establish Sampling Schedule and Rationale Establish Procedure for Data Validation Data Base Management

Program Validation and Review Periodic Independent Review < 5 years Revalidation of Priority Index

Additional Sections Communicating with Stakeholders Potential Mitigating Actions Decommissioning Considerations References Additional Technical References Glossary

Summary of EPRI Guidelines and their Implementation Development of Risk Based Index based upon SSCs “Graded Approach Strategy” allows for optimized approach to Groundwater Monitoring by utilities Baseline Program is a commitment from the industry to perform preventative monitoring and control, and will require some plant resources to implement EPRI supplemental support available (GW Assessments) for implementation