California Energy Commission Workshop Nuclear Power Plant Issues

Slides:



Advertisements
Similar presentations
EDISON INTERNATIONAL® SM Water Energy Nexus Charley Wilson Urban Water Institute February 21, 2013.
Advertisements

Central California Clean Energy Transmission Project
Central California Clean Energy Transmission Project PCC Meeting Vancouver, BC October 24, 2007.
NERC TPL Standard Issues TSS Meeting #146 Seattle, WA August 15-17, 2007 Chifong Thomas.
Planning for a Low-Carbon Future at San Diego Gas & Electric Rob Anderson Director of Resource Planning San Diego Gas & Electric Western Resource Planners.
Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
California Energy Action Plan Joint Public Meeting Electricity System Reliability Activities California Energy Commission July 17, 2003.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
User Experience with New Solar PV Models California ISO
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
WORKSHOP ON TECHNOLOGY PATHWAYS FORWARD FOR CARBON CAPTURE & STORAGE ON NATURAL GAS POWER SYSTEMS April 22, 2014 Revis W. James Director, Generation R&D.
Sixth Northwest Conservation & Electric Power Plan Discussion of Proposed Generating Resource Action Items Jeff King Northwest Power and Conservation Council.
Anjali Sheffrin, Ph.D. Chief Economist & Director, Market Design & Product Development Integration of Wind Resources in CAISO Markets and Grid Operation.
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
1 CPUC Avoided Cost Workshop Introduction and Overview.
NSP System. NSP Supply Plans: Generation and Transmission Betsy Engelking Betsy Engelking Director, Resource Planning Director, Resource Planning Xcel.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Challenges in Building Transmission in California Power Association of Northern California P.J. Martinez VP, Engineering Pacific Gas & Electric Company.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
CEC Contingency Planning for Diablo Canyon Rochelle Becker Alliance for Nuclear Responsibility April 27, 2015.
Implications of Energy-Only Procurement on Transmission Planning CPUC Workshop: Revisions RPS Calculator v6.0 Robert Sparks Manager Regional Transmission.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
California Energy Commission Draft 2015 Integrated Energy Policy Report October 20, 2015 Presented by Heather Raitt Assistant Executive Director for Policy.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
PacifiCorp and CAISO Expanding Regional Energy Partnerships
2015 IEPR Lead Commissioner Workshop Southern California Reliability University of California, Irvine August 17, 2015 Tom Doughty Director, State Regulatory.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Local Area Planning Update – TRANSAC Base Case Status Base case study models representing the base scenarios will be completed as follows for.
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
Energy: Challenges with Becoming More Sustainable © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Robb Anderson Director.
Flynn & Associates1 SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
LNBA Subgroup: Avoided Transmission Value
WECC Load Modeling and Validation Group Meeting
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Mike Jaske California Energy Commission
WECC Load Modeling and Validation Group Meeting
User Experience with New Solar PV Models California ISO
Palo Verde-COI RAS Retirement
Palo Verde-COI RAS Retirement
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

California Energy Commission Workshop Nuclear Power Plant Issues Contingency Planning for Diablo Canyon Jeff Billinton Manager, Regional Transmission -North April 27, 2015

2012-2013 Transmission Planning Process Studied Grid Reliability Impact In the Absence of Nuclear Generation Study included assessment of the transmission system without the Diablo Canyon Power Plant Studies included the following evaluations: Potential transmission reliability concerns Potential mitigation options The results of the assessment and transmission impact are still valid

2012-2013 Transmission Planning Process These studies are not sufficient to base a decision to keep or retire the nuclear generating power plants Other studies would be needed to provide a more completed assessment: Asset valuations Environmental impacts of green-house gas emissions and compliance with AB 32 Impacts on flexible generation requirements Least-cost best-fit replacement options Generation planning reserve margin Market price impacts Customer electricity rate impacts Impacts to natural gas systems for replacement generation

Studied the impact of absence of the Diablo Canyon and San Onofre nuclear power plants Path 15 Path 26 Diablo Canyon San Onofre

Study efforts completed in ISO 2012/2013 TPP Summer 2013 (SONGS) Contingency Planning for Long-Term Outage Relicensing Assessment 2012 Summer 2012 and 2013 Preparedness Addendum to 2013 LCR studies (without SONGS) was posted Mid Term Study – Contingency Planning (2018) Considers what elements of the long term plan should be initiated immediately to help mitigate future unplanned extended outages Long Term Study – Relicensing Assessment (2022) Studies focus on transmission system implications of loss of SONGS and DCPP Study results are documented in the ISO 2012/2013 Transmission

PG&E Bulk System Studies for the Diablo Canyon Power Plant Back-up Post-transient and transient stability analysis for the cases with and without Diablo Power Plant Peak and off-peak conditions All single and double 500 kV outages studied, large generation outages, three-phase faults with normal clearing, single-phase-to-ground faults with delayed clearing 2012-2013 Transmission Plan Policy Driven Commercial Interest RPS case used as a starting case DCPP generation was replaced by dispatching thermal generation and peakers in PG&E and hydro generation in Northwest

2012-2013 Transmission Planning Process Study Conclusions for the Mid and Long Term Studies – Diablo Canyon Power Plant No material mid or long term transmission system impacts associated with DCPP absence in the assumption that renewable generation projects develop according to the CPUC RPS Portfolio Absence of DCPP allowed to avoid several overloads on the PG&E bulk system during off-peak load conditions (Westley-Los Banos 230 kV, Gates-Midway 230 kV) Category D contingencies will require more load tripping if DCPP is absent Additional studies are required to determine if the system has sufficient reactive margin with higher load Additional sensitivity studies with lower level of renewable generation may be required to confirm these conclusions

ISO Current Assessment of Potential Transmission Impacts The ISO continues to monitor the system and assumptions related to the 2012-2013 Transmission Planning process assessment The results of the assessment and transmission impact are still valid There are no material transmission impacts without Diablo Canyon Power Plant May be some dynamic reactive requirements to address potential high and low voltage conditions under different operating conditions.