Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.

Slides:



Advertisements
Similar presentations
NRC Consensus Standards Program
Advertisements

Adam H. Levin AHL Consulting May 14, BWR – Boiling Water Reactor DOE – Department of Energy DSC – Dry Storage Canister ISF – Interim Storage Facility.
After 2020: Opportunities and Challenges for All Independent Energy Producers Annual Meeting September 26, 2013 Nancy E. Ryan Director of Policy and Strategy,
The CPUC’s Role in San Onofre Nuclear Plant Decommissioning Presentation to the California State Senate August 13, 2013 Edward Randolph Director, Energy.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Safety and Security Aspects of the Management of High Level Waste and Spent Fuel Ramzi Jammal Executive Vice-President and Chief Regulatory Operations.
February 26, August 27, 2013 Entergy announces it will cease operations December 29, 2014 Permanent Shutdown April 2016 Implement.
Long Term Storage, The Failure of the Federal Government, and NIMBY.
The Yucca Mountain Repository for Nuclear Waste April 23, 2007 Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
1 GAO Study on Radioactive Waste Management Scenarios Ric Cheston US Government Accountability Office (GAO)
1 Central Coastal California Seismic Imaging Project California Energy Commission Workshop Dr. Stuart Nishenko PG&E April 27, 2015.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
California Energy Commission AB 1257 Report on the Role of Natural Gas in California Staff Workshop on California’s Natural Gas Infrastructure, Storage,
DIABLO CANYON SPENT FUEL STORAGE: SELECTED ISSUES
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
California Energy Commission Overview of the 1976 Moratorium and It’s Impact on California’s Low-Carbon Future California Senate Energy, Utilities and.
Nuclear Power Plant Issues at the CPUC Senate Hearing April 14, 2011 Gurbux Kahlon Program Manager Rate Regulation, Analysis and Policy Branch Energy Division.
Energy Storage R Energy Storage Procurement & Policy Options Arthur O’Donnell/Aloke Gupta/Elizaveta Malashenko Energy Division Grid Planning.
Japanese Nuclear Accident And U.S. Response May 17, 2011.
Nuclear Power Discussion March 25, 2009 Joint meeting of the Legislative Energy Commission; the House Energy Finance & Policy Division; and the Senate.
The US NRC’s Power Reactor Decommissioning Process Michael F
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
California Energy Commission James Madigan April 27, 2015.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
Eric M. Davied American Nuclear Society Texas A&M University
California Energy Commission Strategic Transmission Planning and Corridors IEPR Commissioner Workshop on Landscape-Scale Environmental Evaluations for.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
September 24, Joseph Lynch Government Affairs Manager, Entergy Vermont Yankee (ENVY)
1 LICENSING A U.S. GEOLOGICAL REPOSITORY WILLIAM BORCHARDT Executive Director for Operations U.S. Nuclear Regulatory Commission.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
CEC Contingency Planning for Diablo Canyon Rochelle Becker Alliance for Nuclear Responsibility April 27, 2015.
CALIFORNIA ENERGY COMMISSION California Bioenergy Action Plan Southern California Emerging Waste Technologies Forum Los Angeles, California July 27, 2006.
1 Status of Ongoing Rulemakings and Safety Culture Update Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking OAS Annual.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
Nuclear Energy and 21st Century Environmentalism June 4, 2014.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
California Energy Commission Draft 2015 Integrated Energy Policy Report October 20, 2015 Presented by Heather Raitt Assistant Executive Director for Policy.
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
STATE JURISDICTION:  As the Commission stated when it adopted the Part 51 regulations, the “determination of the economic viability of continuing the.
1 California Energy Commission April 27, 2015 Valerie Winn Chief, State Agency Relations Contingency Planning and Diablo Canyon Power Plant.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
Work Related to Senate Bill 2202 (effective January 1, 2001)
1 Kelli Gallion, Southern California Edison Tom Amabile, San Diego County Janell Harriman, Orange County Sara Kaminske, Orange County.
Safety of At-Reactor High-Density Storage of Fuel in Pools Steve Jones Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission International.
It Is a Moral Issue – Why We Should Say ‘No’ to Nuclear Andrew Blowers Presentation at Thornbury, November 2010.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
1 PG&E’s Humboldt Bay (HBPP) & Diablo Canyon (DCPP) Power Plants Decommissioning process and replacement power April 14, 2011 Loren Sharp.
Decommissioning San Onofre
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Emergency Preparedness During Decommissioning
The Long Road Forward: AB 32 & the Energy Transformation
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Joseph D. Anderson, Chief
Flooding Walkdown Guidance
NRC’s LLW Regulatory Program: Update of Emerging Issues
Nuclear Waste Storage Current Status and Plans
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
SONGS Past, Current, and Future State May 4, 2016
Research and Test Reactor Safety: The Regulatory Perspective
Decommissioning Rulemaking
Presentation transcript:

Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission

California’s Nuclear Power Plants 2 Humboldt Bay Power Plants, Units 1 and 2 San Onofre Nuclear Generating Station (SONGS)Diablo Canyon Power Plant Rancho Seco Power Plant

2013 IEPR Recommendations 15 recommendations overall Seismic uncertainty Safe operations and emergency planning at Diablo Canyon Decommissioning San Onofre Spent fuel management at Diablo Canyon and San Onofre

Seismic Uncertainty AB 1632 Report (2008) recommended biennial reports on a seismic vulnerability, among other topics IEPR recommendation: PG&E should make its findings and conclusions available to the CEC, CPUC, and the NRC during reviews of the Diablo Canyon license renewal application.

Seismic Uncertainty September 2014: PG&E released the Central Coastal California Seismic Imaging Project – Feedback from the Independent Peer Review Panel (IPRP) meetings and reports not yet incorporated. March 2015: PG&E submitted its reassessment of potential seismic and flooding hazards at Diablo Canyon to the NRC – IPRP and NRC reviews underway – Comparisons to licensing basis ongoing

Seismic Uncertainty 2013 IEPR Recommendation: PG&E should evaluate the seismic hazard analysis against the licensed design of the plant to ensure plant reliability and minimize costs to the ratepayer.

Seismic Uncertainty 2013 IEPR Recommendation: SCE should complete the SONGS seismic studies and provide results of the studies to the Energy Commission and CPUC.

Safe Operations and Emergency Planning 2013 IEPR Recommendation: PG&E should provide updated evacuation time estimates, including the real-time evacuation scenario following a seismic event, and submit it to the Energy Commission as part of the IEPR reporting process.

Safe Operations and Emergency Planning February 2015: NRC determined that an unauthorized change to emergency plan procedures for areas over the ocean at Diablo Canyon were of low to moderate safety significance.

Safe Operations and Emergency Planning June 2013: PG&E submitted a license amendment request to the NRC, transitioning the Diablo Canyon fire protection program to a risk- informed performance-based alternative IEPR Recommendation: PG&E should bring Diablo Canyon into compliance with applicable 2004 National Fire Protection Agency fire protection regulations and report to the Energy Commission until full compliance is achieved.

Safe Operations and Emergency Planning 2013 IEPR Recommendation: PG&E should provide to the CEC and CPUC a comprehensive study on whether the Price-Anderson liability coverage for a severe event at Diablo Canyon would be adequate to cover liabilities resulting from a large offsite release of radioactive materials and identify and quantify any funding sources that would be necessary to cover any shortfall.

Decommissioning San Onofre

2013 IEPR Recommendation: SCE should submit a decommissioning plan to the NRC and proceed swiftly with decommissioning, providing progress updated to the Energy Commission until decommissioning is completed.

Decommissioning San Onofre June 2013: SCE announced it would permanently retire SONGS Units 2 and 3 June and July 2013: Fuel was removed from reactors September 2014: Post-Shutdown Decommissioning Activities Report submitted to the NRC March 2015: NRC voted to approve exemptions from emergency planning requirements

Spent Fuel Management Photo: BloombergBloomberg Photo: SLO TribuneSLO Tribune

Spent Fuel Management 2013 IEPR Recommendation: Evaluate potential long-term impacts and projected costs of spent fuel storage in pools vs. dry cask storage of higher burn-up fuels in densely packed pools, and the potential degradation of fuels and package integrity during long- term wet and dry storage and transportation offsite.

Spent Fuel Management Ongoing Energy Commission engagement – Monitoring federal nuclear waste management program activities – Represent California in Yucca Mountain licensing proceeding – Support federal efforts to develop an integrated system for management and disposal of nuclear waste

Next steps Discussions around continued storage of nuclear waste at operating and decommissioned power plants – Minimize risk and maximize safety – Plan for thoughtful transport to an interim storage facility or final repository

Next steps Uncertainty about Diablo Canyon’s future – Seismic uncertainty – Once-through cooling policy – Contingency planning Continued coordination with state and federal agencies, utilities, and the public on nuclear power plant safety, transport, and waste policy

Thank you Written Comments due May 11, IEPR is using e-filing: – – Click on the “Submit e-Comment” link in the “Proceeding Information” box – Select 15-IEPR-12 Energy Efficiency – Enter your contact information and title of the comment – Select “IEPR Workshop” and “IEPR Public Comment” for subject – You may include comments in the box titled “comment text” or attach a file with your comments – Attached comments must be in a Microsoft® Word (.doc,.docx) or Adobe® Acrobat® (.pdf) formatted file.