By: Date: Federal Aviation Administration Surveillance and Broadcast Services ADS-B Status Briefing: ASAS TN2.5 Vincent Capezzuto November 2008.

Slides:



Advertisements
Similar presentations
MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
Advertisements

U.S. Plans for ADS-B Briefing for
Don Willis Federal Aviation Administration Washington, DC March 30, 2004 There are no benefits to compromising safety…only dire consequences Assessment.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Air Traffic Management
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
Applications from packages I to III
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Sense & Avoid for UAV Systems
Presented to: MPAR Symposium II By: James Williams – Director, Systems Engineering and Safety Date: 17 November 2009 Federal Aviation Administration Multifunction.
Delivering NextGen June 5, 2015 Maryland Airport Managers Association Presented by Carmine Gallo, Eastern Regional Administrator Federal Aviation Administration.
Presented to: MPAR Working Group By: William Benner, Weather Processors Team Manager (AJP-1820), FAA Technical Center Date: 19 March 2007 Federal Aviation.
EDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme.
Future of Surveillance in the National Airspace System
Presented to: By: Date: Federal Aviation Administration North Florida Flight Standards District Office FAA Safety Team Safety Presentation Technically.
Federal Aviation Administration Surveillance and Broadcast Services By: Rick Castaldo Date: January 9, 2007 Surveillance and Broadcast Services Briefing.
Surveillance and Broadcast Services
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
Alternative Positioning, Navigation, and Timing Initiative
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Division Date: March 1, 2006 Federal Aviation.
Next Generation Air/Ground Communications (NEXCOM) Presented to ATN 2002 London, England 25 September 2002 James H. Williams Communications Integrated.
© 2003 The MITRE Corporation. All Rights Reserved. Cockpit Display of Traffic Information (CDTI) Enhanced Flight Rules (CEFR) Randall Bone October 7, 2003.
Presented to: PNT Advisory Board By: JC Johns, Director Navigation Services Date: May 14, 2009 Federal Aviation Administration GNSS Program Status WAAS,
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Team Date: October 11, 2006 Federal Aviation.
St Louis Flying Club I 2008 Annual Meeting 2008 Annual Meeting.
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
Page 1 Aircraft Surveillance Applications (Extracts from ASA MASPS, DO-289) Presented to ASAS-TN 3 rd Workshop Steve Koczo - Rockwell Collins Inc. Jonathan.
FAA NAS Enterprise Architecture – Informing Future Challenges in V&V for NextGen 2009 V&V Summit November, 2009.
October 5, 2007 By: Richard L. Day, Vice President En Route and Oceanic Services (ATO-E) Federal Aviation Administration Surveillance and Broadcast Services.
NTAS NextGen Videos  Satellite Based navigation  ADS-B ◦ In / Out  Performance Based Navigation ◦ RNP/RNAV  TBO  Data Link Communications.
6-1 Design of UAV Systems UAV operating environmentsc 2002 LM Corporation Lesson objective - to discuss UAV Operating Environments including … National.
Data Link Communications
Federal Aviation Administration 0 Certification Standards for New Technologies June 9, 2005 Certification Standards for New Technologies Presentation to:
By: Date: Federal Aviation Administration Surveillance and Broadcast Services ADS-B Status Briefing: ASAS TN2 Vincent Capezzuto April 14, 2008.
Federal Aviation Administration Surveillance and Broadcast Services By: Date: September 11-13, 2006 Rick Castaldo, Surveillance and Broadcast Services.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
FAA System-Wide Information Management Program Overview for SWIM-SUIT Public Lauch Donald Ward Program Manager FAA SWIM Program April 2007.
By: Date: Federal Aviation Administration Surveillance and Broadcast Services November 12, 2008 Merging and Spacing Enabling Continuous Descent Arrivals.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
NextGen & ADS-B Presentation to Aviation Accreditation Board International (AABI) Industry/Educator Forum July 18, 2013 Kansas City, MO.
Presented to: IWG 26 By: Jason Burns (FAA) Date: February 5-7, 2014 Federal Aviation Administration DFMC Work Plan Update.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
Presented to: Demonstrations and Prototypes TIM By: Steve Hodges Date: 05/04/2011 Federal Aviation Administration Aircraft Access to SWIM (AAtS) FY11 planned.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Federal Aviation Administration FPAW October Delivering NextGen Next Generation Air Transportation System Presented to: FPAW By: Alfred Moosakhanian,
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
ADS-B An Industry Perspective New Technologies Workshop Washington, DC January 10, 2007.
Satellite Navigation Program
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
William C. Withycombe March 14, 2012 Federal Aviation Administration Pacific Aviation Directors Workshop State of the FAA.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
FAA NAVAID Rationalization / Resiliency Overview
Workshop on preparations for ANConf/12 − ASBU methodology
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
Regional RAIM Prediction System – Progress Report
Ground System implication for ASAS implementation
Presentation transcript:

By: Date: Federal Aviation Administration Surveillance and Broadcast Services ADS-B Status Briefing: ASAS TN2.5 Vincent Capezzuto November 2008

Surveillance and Broadcast Services 2 Federal Aviation Administration Agenda Dual Track Strategy Essential Services Status Critical Services Status Rulemaking Status $9.3M Acquisition Next Steps

Surveillance and Broadcast Services 3 Federal Aviation Administration Dual Track Strategy

Surveillance and Broadcast Services 4 Federal Aviation Administration FAA Key Sites = Key Site Philadelphia Juneau Gulf of Mexico Louisville Miami (Essential)

Surveillance and Broadcast Services 5 Federal Aviation Administration Essential Services: Miami (Key West) (Homestead) (St. Cloud)

Surveillance and Broadcast Services 6 Federal Aviation Administration Eastern Service Area – Miami Key Site South Florida Broadcast Services –Operational since August 2008 Radio Station Status 9/24/08 SV-168 UAT – Overview (TIS-B and FIS-B) SV ES – Overview (TIS-B)

Surveillance and Broadcast Services 7 Federal Aviation Administration Hardee Radio Station Installation

Surveillance and Broadcast Services 8 Federal Aviation Administration Sebastian Airport Installation

Surveillance and Broadcast Services 9 Federal Aviation Administration Key West Installation SV Key West (Beach TV) Radio Cabinet on Platform SV Key West (Beach TV) Radio Cabinet Installed on Platform SV Key West (Beach TV) Antenna Array Note: The Key West site is in a flood plain, so a raised structure was required

Surveillance and Broadcast Services 10 Federal Aviation Administration Essential Services: Plan for ISD MilestonePlanned Date of Completion Preliminary Design Review (PDR)November 2007 Critical Design Review (CDR)February 2008 Factory Acceptance Test for Essential ServicesMay 2008 Service Acceptance Test for Essential ServicesJune 2008 End to End System TestAugust 2008 Operational TestAugust 2008 Initial Operating Capability (IOC) for Essential ServicesAugust 2008 Independent Assessment Data CollectionSeptember 13 – September 30, 2008 Preliminary Report / BriefingOctober 15, 2008 Independent Assessment Final ReportNovember 18, 2008 In-Service DecisionNovember 24, 2008

Surveillance and Broadcast Services 11 Federal Aviation Administration Eastern Service Area Philadelphia and Louisville Key Sites Critical Services –Automatic Dependent Surveillance - Broadcast (ADS-B) New ADS-B Operational at Louisville: (October 2009) New ADS-B Operational at Philadelphia (February 2010)

Surveillance and Broadcast Services 12 Federal Aviation Administration Central Service Area Gulf of Mexico / Houston Key Site Critical Services –New ADS-B, Weather and Communications All Operational: Gulf of Mexico/ZHU (December 2009)

Surveillance and Broadcast Services 13 Federal Aviation Administration Western Service Area Juneau Key Site Critical Services –Wide-Area Multilateration (WAM) New WAM Operational: ZAN (June 2009) & ZDV (April 2009) –Automatic Dependent Surveillance - Broadcast (ADS-B) New ADS-B Operational: ZAN (April 2010) –Statewide Expansion of ADS-B with Communications & Weather

Surveillance and Broadcast Services 14 Federal Aviation Administration September 2008 ARC Report Overview The ARC made 36 summary recommendations divided into two broad categories: –Recommendations to be resolved before any rule is adopted = 26 ADS-B Link Strategy ADS-B Program and Business Case Performance Requirements Required Equipment Communication, Navigation and Surveillance Equipment –Recommendations for future = 10 ADS-B Program and Business Case Required Equipment Communication, Navigation and Surveillance Equipment Security, Privacy, and Malicious Use The ARC emphasizes its support for ADS–B Out implementation in the NAS by 2020.

Surveillance and Broadcast Services 15 Federal Aviation Administration ARC Recommendations: Use of DO-260 Specific Recommendations: –Recommendation #6 (For Final Rule): Consistent with the ARC’s task 1 report, Optimizing the Benefits of ADS–B, the FAA should enable the use of DO–260- approved equipment for non-separation applications in the NPRM business case such as conflict probe in radar airspace. The FAA should operationally validate these benefits as soon as possible, to give operators confidence in the benefits of ADS–B Out. –Recommendation #10 (For Final Rule): To approve the use of DO–260-like equipage, the FAA should adopt, for 5 nm separations in non-radar airspace to include at least the Gulf of Mexico, European Aviation Safety Agency (EASA) Acceptable Means of Compliance (AMC) 20–24, with appropriate measures to ensure ADS–B integrity. –Recommendation #28 (Longer Term): To support early ADS–B benefits with DO–260-approved equipment, the FAA should further explore opportunities within the ADS–B ground infrastructure/ATC automation to fuse data to accommodate the lack of transmission of the Mode 3/A code.

Surveillance and Broadcast Services 16 Federal Aviation Administration ARC Recommendations: Use of DO Hardee, Florida ADS-B Receive Coverage

Surveillance and Broadcast Services 17 Federal Aviation Administration ARC Recommendations: Use of DO Functional Flow Diagram AIR certification of pre existing DO 260 Changes in ATC procedures Aircraft Certification List Flight Plan track association based on call sign / ICAO address RAIM prediction & availability assessment Target selection filter

Surveillance and Broadcast Services 18 Federal Aviation Administration ARC Recommendation #29 (Longer Term): En Route 3nm Separation The FAA should develop and implement the requirements and operational procedures for 3 nm separation in all domestic en route airspace based on ADS- B surveillance, before the ADS–B Out compliance date. Terminal Airspace 3 nm Separation En route Airspace 5 nm Separation Transition Area effective separation 3 nm

Surveillance and Broadcast Services 19 Federal Aviation Administration ARC Recommendation #31 (Longer Term): Search and Rescue The FAA should explore the opportunity of providing an enhancement to the emergency locator transmitter (ELT)/search and rescue operation by establishing an ADS-B tracking service that could be used to aid in crash locating.

Surveillance and Broadcast Services 20 Federal Aviation Administration ARC Recommendation #27 (Longer Term): ADS-B In The NPRM is focused on ADS– B Out and attempts to establish the requirements of ADS–B Out equipment so that it is compatible with ADS–B In. The FAA, in partnership with industry, should define a strategy for ADS–B In by 2012, ensuring the strategy is compatible with ADS–B Out avionics. The FAA also should ensure this program defines how to proceed with ADS–B In beyond the voluntary equipage concept included in the NPRM.

Surveillance and Broadcast Services 21 Federal Aviation Administration In Trail Procedures

Surveillance and Broadcast Services 22 Federal Aviation Administration Flight Deck Merging and Spacing (FDMS)

Surveillance and Broadcast Services 23 Federal Aviation Administration $9.3M Acquisition: ATSA Conflict Detection on the Surface

Surveillance and Broadcast Services 24 Federal Aviation Administration $9.3M Acquisition: Background The FY08 Conference Report accompanying H.R has provided additional funding to the ADS-B program "specifically to expedite air to air capabilities" FAA intends to utilize this funding to demonstrate ADS-B capabilities in the areas of surface conflict detection and cockpit alert capabilities

Surveillance and Broadcast Services 25 Federal Aviation Administration $9.3M Acquisition: Awards On November 3, 2008 the FAA announced awards to two different vendors

Surveillance and Broadcast Services 26 Federal Aviation Administration $9.3M Acquisition: Honeywell Award Award: $3M Proposal: Develop requirements, standards and human factors analysis Location(s): –Seattle Tacoma –Snohomish County Paine Field Aircraft (experimental): –1 Cessna Sovereign –1 Beechcraft King Display: EFB and MFD Pilots: –JetBlue Airways –Alaska Airline

Surveillance and Broadcast Services 27 Federal Aviation Administration $9.3M Acquisition: ACSS Award Award: $6M Proposal: Create standards, flight demonstrations and prototypes Partner: US Airways Location: Philadelphia Aircraft (1 experimental, 20 revenue service): –King Air C90 (1) –Airbus 330 (20) Display: Class 2 EFB / AGD

Surveillance and Broadcast Services 28 Federal Aviation Administration FY2009 / FY2010 Next Steps MilestonePlanned Date / Status In Service Decision for Broadcast ServicesNovember 2008 Critical Services Factory Acceptance Test (FAT) CompleteMarch 2009 Key Site Service Acceptance Test (SAT) Louisville Service Acceptance Test (SAT) CompleteApril 2009 Gulf of Mexico Service Acceptance Test (SAT)June 2009 Philadelphia Service Acceptance Test (SAT)August 2009 Juneau Service Acceptance Test (SAT)October 2009 Key Site Initial Operating Capability (IOC) Louisville IOC of Surveillance ServicesOctober 2009 Gulf of Mexico IOC of Surveillance ServicesDecember 2009 Philadelphia IOC of Surveillance ServicesFebruary 2010 Juneau IOC of Surveillance ServicesApril 2010 Program Milestones Final Rule PublishedApril 2010 Surveillance Services ISD for ADS-BSeptember 2010

Surveillance and Broadcast Services 29 Federal Aviation Administration Thank You Achieving results through coordinated international collaboration

Surveillance and Broadcast Services 30 Federal Aviation Administration Backup

Surveillance and Broadcast Services 31 Federal Aviation Administration Ground Infrastructure: 794 Ground Station Solution Provides National Coverage

Surveillance and Broadcast Services 32 Federal Aviation Administration ITT ADS-B Locations Locations are subject to change 22 Locations (9 shore /13 platform)

Surveillance and Broadcast Services 33 Federal Aviation Administration ITT AWOS Locations Locations are subject to change 37 Locations

Surveillance and Broadcast Services 34 Federal Aviation Administration FAA VHF Communication Locations Communication Sensors High Altitude (10 total sites, 4 new, 6 existing) Low Altitude (17 total sites, 5 new, 12 existing)

Surveillance and Broadcast Services 35 Federal Aviation Administration Summary of Recommendations for Final Rule Recommendation #Summary ADS-B Link Strategy Recommendation #1Urgent 1090 Study Recommendation #2Articulate changes to ACAS Recommendation #3Collaborate with ARC on final link decision ADS-B Program and Business Case Recommendation #4Retain 2020 compliance date, incorporate additional benefits Recommendation #5SNPRM (assuming contingencies) Recommendation #6Enable DO-260 Recommendation #7Preference routes and procedures Recommendation #8Recalculate cost benefit analysis Recommendation #9 Ensure cost/benefit to all operators, validate ARC cost figures Recommendation #10Use AMC to separate in NRA at 5 miles in at least the Gulf Recommendation #11Delay compliance date (with conditions) Recommendation #12Airspace exclusion at 2500 AGL Recommendation #13Include FIS-B and TIS-B in preamble

Surveillance and Broadcast Services 36 Federal Aviation Administration Summary of Recommendations for Final Rule Recommendation #Summary Performance Requirements Recommendation #14Performance Requirements per domain Recommendation #15Latency recommendations Recommendation #16 Not apply vertical position accuracy in NAC 9 Recommendation #17Allow for foreign satellite constellations Recommendation #18Non-Diversity Antenna Recommendation #19Use DO-289 MASPS to define SIL Recommendation #20Broadcast message element recommendations Recommendation #21Calculate/report continuity of RNP parameters Recommendation #22Specify continuity requirement Recommendation #23Specify 2 continuity requirements for ASSA and FAROA

Surveillance and Broadcast Services 37 Federal Aviation Administration Summary of Recommendations for Final Rule Recommendation #Summary Required Equipment Recommendation #24 Turn Off ADS-B Recommendation #25Commit to transponder removal, explain why transponders are needed short-term (new backup strategy) Communication, Navigation and Surveillance Equipment Recommendation #26CNS roadmap in final rule

Surveillance and Broadcast Services 38 Federal Aviation Administration Summary of Longer Term Recommendations Recommendation #Summary ADS-B Program and Business Case Recommendation #27Define strategy for ADS-B In Recommendation #28Fuse data in automation to accommodate lack of Mode 3/A Code Recommendation #293nm en route separation Required Equipment Recommendation #30Implement transponder removal for low altitude operators not equipped with ACAS Recommendation #31Enhance ELT with tracking service Recommendation #32Replace ELTs Communication, Navigation, and Surveillance Equipment Recommendation #33 Integrated CNS strategy to deal with GNSS outages Security, Privacy and Malicious Use Recommendation #34ICAO codes treated under privacy laws Recommendation #35 Use Anonymity for UAT, develop a feature for it on 1090 MHz Recommendation #36Assign ICAO codes so they don't correlate with tail numbers

Surveillance and Broadcast Services 39 Federal Aviation Administration

Surveillance and Broadcast Services 40 Federal Aviation Administration

Surveillance and Broadcast Services 41 Federal Aviation Administration Sebastian Airport Installation

Surveillance and Broadcast Services 42 Federal Aviation Administration Process for Selecting Applications Identify NAS needs (Problems) Decompose into sub- problems Map sub-problems to required capabilities Identify applications to support capabilities Is application a subset of / traceable to an existing AIWP application? Is application description sufficient to enable business case analysis? Refer to AIWP Develop/Refine application description No Yes Conduct business case analysis Rank application based on business case results Steering Committee requires mods to prioritized list? Eliminate applications below minimum threshold Yes No PHASE 2 Application Prioritization PHASE 1 Application Characterization Timeline of Applications Portfolio of applications from existing sources

FY08 MilestonesFY09 MilestonesFY10 Milestones Preliminary Design Review (PDR) November 2007 Independent Assessment November 2008 Juneau SAT October 2009 Critical Design Review (CDR) February 2008 In-Service Decision November 2008 Louisville IOC of Surveillance Services October 2009 Close of NPRM Comment Period March 2008 Louisville SAT April 2009 Gulf of Mexico IOC of Surveillance Services December 2009 Factory Acceptance Test for Essential Services May 2008 Gulf of Mexico Weather Service Acceptance Test (SAT) June 2009 Philadelphia IOC of Surveillance Services February 2010 Service Acceptance Test for Essential Services June 2008 Gulf of Mexico SAT June 2009 Juneau IOC of Surveillance Services April 2010 End to End System Test / Operational Test August 2008 Philadelphia SAT August 2009 Final Rule Published April 2010 Initial Operating Capability (IOC) August 2008 Gulf of Mexico Comm. and Weather IOC September 2009 Surveillance Services ISD for ADS-B September 2010 Technical Performance Measures (TPMs) Schedule Status (FY08 / FY09 / FY10) Surveillance and Broadcast Services 18 Rated Risks: 3 High, 10 Medium, 5 Low High: 1.Rule 2.Spectrum 3.MEARTS Medium: 1.Avionics Standards 2.Application Standards 3.Separation Standards 4.Juneau WAM 5.Gulf Surv. Sites 6.CARTS 7.STARS 8.CD-2 Status Message 9.ARC Recommendations 10.WAM CD-2 Status Message Program Earned Value Management (September 2008) Program Risks FIS-B Transmission Interval: NEXRAD Reflectivity (CONUS) is turned off and the issue is being worked on. No impact on the system performance. NEXRAD Reflectivity (Regional) software fix is under testing