1 Detector position August 2005, supplement May’06 sub- detectormean Zdelta ZZ_startZ_end TT 248543022702700 First pillar =1 st shelf at sides748720073877587.

Slides:



Advertisements
Similar presentations
Chapter 5 Pictorial Sketching.
Advertisements

Click on this image to open the full PDF document.
Section 6.2.  Solids of Revolution – if a region in the plane is revolved about a line “line-axis of revolution”  Simplest Solid – right circular cylinder.
Gravitational Attractions of Small Bodies. Calculating the gravitational attraction of an arbitrary body Given an elementary body with mass m i at position.
Electric field calculation for the neutron EDM SNS experiment. Septimiu Balascuta Ricardo Alarcon ASU, 02/07/2008.
Survey(s) of TT8 10/12 TT 8 after wall1 16/12 TT 8 Standalone.
1 Part II Proposition of locations of cable trays.
Freehand Sketching.
S.H.H.S Building Construction
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
ME: 121 Engineering Practices
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
PSB dump endoscopy 30 th May 2013 Alba Sarrió on behalf of EN-STI-TCD Thanks to Pascal Mesenge (EN-MME)
CHAPTER - 15 LIGHT.
Optics and magnetic field calculation for the Hall D Tagger Guangliang Yang Glasgow University.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Plain Mirror Style SNC2D. Angles – What’s It All Mean?
Status of the Alignment 17/12/04 Dario Autiero. Measurements taken so far: 13/9 TT8 On the mounting arch 12/11 TT7 Standalone in the target 19/11 TT7.
1 Photogrammetry of TT7. 2 Front view Distribution of all targets All the plots are in the magnet reference system.
Draw the oblique view 20 H 40 R20  15  H1 L1.
The HCAL barrel absorber structure
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Unit 5 Shap Description (Orthographic Projection) نظرية الأسقاط.
The Lego Man Basic 3D Modelling. The Head Use the Revolve Tool to get the sketch from 2D to 3D.
Perspective Drawings Linear perspective is a geometric method of representing the apparent diminishing of scale as the distance from object to viewer increases.
T2K Remote Handling T. Sekiguchi (KEK) on behalf of Tada (KEK) 2012/11/10.
1 Welcome to the mini-review of the Roman Pot mechanics for the ALFA project in ATLAS.
1) News on the long scale length calibration 2) Results of the two surveys performed on plane 7 Set 1: morning of 12/11/2004 Set 2: morning of 19/11/2004.
ENGINEERING DRAWING VISUALIZATION. Axonometric & Oblique Projection.
Electric field calculation for the neutron EDM SNS experiment. Septimiu Balascuta Ricardo Alarcon ASU, 02/07/2008.
FP420 Hybrid Mechanical Design Ray Thompson / Manchester Manchester Xmas O7 Ray Thompson Julian Freestone, Andy Elvin.
North Carolina State University Spring What You Will Learn:  Define Orthographic Projection.  Correctly label the placement of the six standard.
GE1021 Engineering Drawing and Graphics
Page 1 GSI, Hydraulic Actuators for PANDA Target Spectrometer Jost Lühning, GSI Darmstadt Functional Specifications for moving the TS: Two synchronous.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
LumiCal High density compact calorimeter at the ILC Wojciech Wierba Institute of Nuclear Physics PAS Cracow, Poland.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
Lab 2 Alignment.
ISOMETRIC DRAWINGS LECTURE NO
GSI, for the CBM Collaboration
Baby-MIND Modules & Services
Making Sharper Images Workshop
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Using One Point Perspective to Combine Shapes
NOTATIONS FOLLOWING NOTATIONS SHOULD BE FOLLOWED WHILE NAMEING
Neutrino v2.1 structural assessment
POINTS IN 3 DIMENSIONS 2D The xy-plane is used to plot points in 2D.
Present status of the flux return yoke design
Visit for more Learning Resources
Abridged to only those lines which are still POSSIBLE (2007)
Auxiliary Views Engineering II.
INSTALLATION SEQUENCE
Installation step 4. (3 days)
LumiCal mechanical design, integration with LDC and laser alignment
16 T dipole in common coil configuration: mechanical design
SCROLL SAW SAFETY.
OT Survey & Adjustment Outline: Survey technique at present
Bulk Head (1) (1st Suspension Connection)
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF
Drawing Walls for a Room
Using One Point Perspective to Combine Shapes
Leveling By : Parveen Kumar.
BCM Overview Placement such that system is sensitive to all types of beam accidents. => 2 independent subsystems Halo losses inside the Pixel volume ie.
ORTHOGRAPHIC PROJECTION
Inner DET. Integration Inner detector envelope Radial clearances.
Four Jaw Collimator.
Presentation transcript:

1 Detector position August 2005, supplement May’06 sub- detectormean Zdelta ZZ_startZ_end TT First pillar =1 st shelf at sides clearance51 inner tracker T outer tracker T clearance11 2 nd shelf in middle total 8069 only shelf clearance10 inner tracker T2 +MFD envelope 8290 at level of RASNIK outer tracker T clearance 40 Second pillar = 3 rd shelf clearance25 inner tracker T outer tracker T Extra pillar RICH29450

2 RASNIK position on C-frame pillar the edge of C-Frame left right C-Frame x=-56.6x=+33.4x=+134.6x= x=0 y=0 beam (S2)172(S3) 83 y= /2= cable goes out from mask horizontally ( not rotated by 120º )

CCD on shelves pillar the edge of C-Frame C-Frame y= y=0 beam Cameras for C-frame nd shelf nd shelf rd shelf Cameras for C-frame 1st pillar 1 2 2nd pillar 3 4 2nd pillar 5 6 3

4 CRYOGENICS Z AXIS (BEAM) INSIDE PICTURE LONG STATION 1 C-FRAME PLANE 1 SHORT OT1 LONG STATION 1 C-FRAME PLANE 2 SHORT LONG STATION 3 C-FRAME PLANE 5 SHORT OT3 LONG STATION 3 C-FRAME PLANE 6 SHORT DV - 120um MASK, reversed holder IN FRONT OF C-FRAME DX - 340um MASK, reversed holder IN FRONT OF C-FRAME H I - 340um MASK, HOLDER BEHIND C-FRAME LONG STATION 2 C-FRAME PLANE 3 SHORT OT2 LONG STATION 2 C-FRAME PLANE 4 SHORT B - 340um MASK- HOLDER BEHIND C-FRAME E - 30um MASK + long H. + lens on the same C-FRAME F - 85um MASK + short H. + lens on the same C-FRAME LENS

5 convention for masks installation on table level - top view ~185 L ong C-Frame nd left pillar 1 st left pillar S hort C-Frame Outer +5 2 nd right pillar 1 st right pillar Inner - 120µm mask H3 B3 H3 B3 D H1 B1 F I2 B2 H13 B123 D E F I2 – lens type E magnet - 30 / 85µm mask + lens - reversed holders - 340µm mask RICH2 Z X T1-Q13-XU T1-Q13-VX T2-Q13-XU T2-Q13-VX T3-Q13-XU T3-Q13-VX T1-Q02-XU T1-Q02-VX T2-Q02-XU T2-Q02-VX T3-Q02-XU T3-Q02-VX D

6 Shelves Location & different kindNumber of lines on shelf Number of shelves on table, under rails82 42 on 1 st pillar24 on 2 nd pillar44 long vertical lines on bunker12 TOTAL This picture for 2 nd pillars BEAM IS TILTED, use shelves with identical thickness => No up-down symmetry in choice of holes for 2 nd & 3 rd station, Upper raw for 2 nd station, Lower raw for 3 rd station.

7 Shelves on 1 st pillar Use identical, short shelves => up-down symmetry, lines only in outside raw. Shelves are adjustable in x and y by +/- 10mm

8 Fixing shelf in the middle bottom vs OT2 or OT OT 5 th C-Frame OT 6 th C-Frame IT shelf / level of table surface -3140= Lens fixed CCD adjustable in z with range e b a line of sight in IT adjustable in x & y (A,B) 10 (C,D) 28 0 A +5 D Lines lengthened by reversing mask holder and lens holder C – to see full 9*9 segment on any mask D – to increase depth of focus B mask +5 C Z Z

lens + mask’s holder on C-frames – OT1 OT 1 st C-Frame 4 A=38 OT 2 nd C-Frame 4 A= STOP 16 4 ENVELOPE 100 END OF MASK AT END OF ENVELOPE ADJUSTMENT +- 5 A=38 or 27 4, ,5 +-5 or 21+4,5 +-5

LONG VERTICAL LINES TO THE BRIDGE lens mask x z y CCD Two lines measure displacement of the bridge in horizontal directions x & z wi th precision of a few microns vertical (  y  1mm) not used 6.7m 1.7m +margins  2m

11 Tool for adjusting shelf to C-frame This tool helps: 1)make runners on shelf perpendicular to one C-frame (in x-z plane and in y-z plane) 2)adjust (in x and in y) shelf to hole in one C-frame for every shelf on nearest C-frame in hole without mask holder |(2 nd C-frame)-(far end of 1 st new middle shelf)|-5= =501  500 x y Then adjust shelf versus cylinder z y Pillar (on sides) front view side view C-frame stop mechanism ON First install cylinder