CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.

Slides:



Advertisements
Similar presentations
Global Design Effort - CFS 13 December 2012 PAC Review - KEK 1 PAC Review CONVENTIONAL FACILITIES AND SITING A. Enomoto, V. Kuchler, J. Osborne.
Advertisements

Nov. 17, 2008 ILC08 Global Design Effort 1 Americas KlyCluster Cost Analysis Overview Tom Lackowski RF & Sum reported by Peter H. Garbincius.
Feb. 6, 2007 BILCW07 Global Design Effort 1 CF&S EDR Plans Main Linac Parallel Session Tom Lackowski Atsushi Enomoto, Jean Luc Baldy, Vic Kuchler.
9/17/07 ILC Detectors 1 Conventional Utilities Tom Lackowski.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS ALCPG 09 AD&I Parallel Linear Collider Workshop of the Americas of the Americas Tunnel Life Safety and Egress Accelerator.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
November 17, 2008 ILC08 HVAC and VE Update November 17, 2008 ILC CFS Workshop 2008 Chicago Lee Hammond, Fermilab Global Design Effort.
1 ILC ( International Linear Collider ) Asian Region Electrical Design H. Hashiguchi, Nikken Sekkei, Co. Ltd., A. Enomoto, KEK ILC Mechanical & Electrical.
Global Design Effort - CFS LCWS10 CFS Parallel Sessions 1 LCWS10 Americas Region Life Safety ILC CONVENTIONAL FACILITIES AND SITING GROUP V. Kuchler.
Global Design Effort - CFS ILC CFS Baseline Technical Review - CERN 1 ILC CFS BASELINE TECHNICAL REVIEW AMERICAS REGION LIFE SAFETY CONVENTIONAL.
CFS near term & Required ADI input CFS near term & Required ADI input 6-12 month activities, required ADI information 10. AUG 2014CFS-ADI Joint Meeting1.
3/2011 CFS BTR Global Design Effort 1 Americas Region Civil Design Tom Lackowski.
1 ILC Mechanical & Electrical Review Conventional MECHANICAL System Design Summary Emil Huedem, FNAL Lee Hammond, FNAL Parsons Mechanical Team (Tim Sheehan,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
ILC Mechanical & Electrical Review Conventional Electrical System Americas Region Design Summary March 21, 2012 Randy Wielgos, FNAL Parsons Electrical.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 HVAC OVERVIEW and VALUE ENGINEERING ITEMS August 13, 2008 CLIC Working Group CES Lee Hammond, Fermilab.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
31, May 2007 ILC DESY 07 1 Surface Building Design Development Tom Lackowski GDE.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Preliminary Studies of the Electric Power Distribution for CLIC
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
1 Process Water and Air Treatment 01 June 2007 Emil Huedem, Maurice Ball, Lee Hammond Fermilab.
CLIC CES Webex 12 Nov Summary: – Set of fire safety measures defined in CERN Safety Report – Proposed Structure for CLIC/ILC Fire Safety Report Fabio.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
Fred Asiri1 Conventional Facilities and Siting Global Group (CFS) SLAC Update Conventional Facilities and Siting Global Group (CFS) SLAC Update November.
CLIC CES Meeting 14 jan 2009 A resume table for fire safety in LHC, and a possible scheme for other machine – part 1 CERN –SC Fabio Corsanego.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
Global Design Effort1 September 20-22, 2006 MAC Review Power and Water breakout (mixed results) Marc Ross GDE.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS Accelerator Advisory Panel Review - Oxford UK 1 ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
MEF - Machines & Experimental Facilities March 2013 Project meeting Activities in Linac4 tunnel and building in 2013 March 2013 Project meeting 14/03/2013J.Coupard1.
ESS KAY CONSULTANTS MEP CONSULTANTS. WHAT IS MEP ??? MECHANICAL ELECTRICAL MEP PLUMBING.
KEK, 04/28/061 Safety Plan Assumptions Break out of fire in the Beam Tunnel is negligible Cables in the Service Tunnel is main fire load They are combustible.
50% LBNE Concept Design WCD Infrastructure. Mechanical.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
Global Design Effort - CFS ILC Integrated Design Meeting, DESY, May ML Single Tunnel Configurations In Deep Underground Accessed with Long.
1 CFS Utilities – What’s included in RDR for IR July CFS Utilities – IRENG WG C WATER COOLING: none. Unknown loads on IR. Only have water plants.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
Conventional Facilities and Siting Global Group (ARCFS)
CLIC Civil Engineering Update
CLIC Civil Engineering & Infrastructure Working Group Meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Americas KlyCluster Cost Analysis Overview
Background B513 built in early 1970’s for mainframe era.
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
Presentation transcript:

CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review

Criteria uploaded to EDMS Used Consultant for Concept Design & Independent Costing of specific WBS Need to Adjust Cost/Design with Recent and Pending Changes for TDR Electrical is Following behind Civil and Mechanical for Final Cost Estimates Electrical System Design 2 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Electrical Design and Cost Estimating Basis of Design Klystron Cluster Full Power Beam Operation Americas Region Standard Voltages Conventional Facilities Development of Loads Mechanical & Electrical Coordination Determination of Load Characteristics Engineering Drawings & Specifications for Estimating 3 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

SCOPE: Conventional Electrical scope includes High Voltage and Low Voltage Electrical Transmission and Distribution on the surface and in the tunnel Estimating and Costing Follows the RDR WBS system 4 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Electrical System Diagram 345 kV Supply T 345 – 34.5 kV Transformers 34.5 kV Switchgear Distribution 34.5 kV Switchgear Distribution 34.5 kV Switchgear Distribution T 345 – 69 kV Transformers 69 kV Switchgear T 69 – 34.5 kV Transformers 34.5 kV Switchgear Distribution T 69 – 34.5 kV Transformers 34.5 kV Switchgear Distribution 34.5 kV Switchgear Distribution 5 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Electrical System Diagram 6 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Electrical System Tunnel Distribution Conventional Power Distribution for KCS Each 35kV/480V unit substation feeds nine 480V panel boards Distance between shafts is approximately 2.1km, and distance from the unit substation to the furthest panel board is approximately 1km. Distance between 480V panel boards is approximately 232m. 7 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Electrical System Klystron Distribution Conventional Power Distribution for KCS Klystron RF Units RF Units are Grouped in Surface Buildings Each 35kV/480V unit substation feeds 480V MCC’s. Medium Voltage (MV) cables from the Central Region are connected to electrical substations at the surface of each shaft for local power distribution. 8 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Electrical System Cryo Plant Distribution Cryo Plants Located in Surface Buildings Medium Voltage (MV) cables from the Central Region are connected to electrical substations at the surface of each shaft for local power distribution. 35kV switchgear feeds Transformers and 480V MCC’s. 9 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Low Voltage Power Distribution at Shafts and Tunnels 35kV Switchgear at each shaft will dual feed unit substations at the base and surface of each shaft with 34.5kV/480V transformers. The unit substation will feed a main 480V distribution panel which will subfeed 480V panel boards in the tunnel or surface buildings. 480V to 120V/208V step-down transformers will connect to the 480V panel boards locally for low voltage power needs. 10 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Emergency/Standby Power Systems Fire detection and alarm systems. Exit sign illumination. Emergency lighting. Elevator car lighting. Fire Command Station lighting. Two-way fire department communication systems. Elevators, elevator equipment, and elevator machine room/controller cooling. Air handling systems for the tunnels and elevator lobbies. Lighting for HVAC mechanical equipment rooms. o Cranes, Sump/Lift Pumps. Ref: Hughes Associates - Life Safety/Fire Protection Code Analysis o Project Requirement 11 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

EMERGENCY POWER DISTRIBUTION 12 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

CHANGES TO DESIGN SINCE RDR Changes since RDREstimated Electrical Cost Impact Single TunnelSignificant KCSSignificant 3.2 Km DRMinor CR integration (e+ undulator)Minor Reduced bunch/Low powerModerate VE (high RF water delta T)Minor VE (removal of chilled water)Minor 13 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Load Table progress – Basis for current Concept design 14 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

LOAD TABLES - Electrical 15 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

16 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012 LOAD TABLES - Electrical

Electrical Cost Estimates Parsons Bottoms Up Estimate Mid 2011 Base Year RAW Numbers – “Brick & Mortar” KCS - Full Power Criteria Adjustments to be made for Final Estimate: Design Changes Add Systems for Complete WBS Baseline Reference Change 17 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Parsons Design Basis Current Design Basis 18 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

PARSONS’s MECH COST EXCEL Separate cost by Area systems Add missing wbs Adjust IR water plant cost Adjust Ventilation cost Add laser rooms Add Fire suppression etc Scale per new load/criteria Adjust cost to low power ADJUSTED MECH COST EXCEL PARSONS’s ELEC COST EXCEL ADJUSTED ELEC COST EXCEL CIVILCOST EXCEL OVERALL CFS COST EXCEL (AMERICAs) GERRY DUGAN’s EXCEL FILE (ICET CEM) LINK or INPUT ? Add EDMS references Add other mandatory input Risk Basis (high & low %) ADJUSTMENT TO FINAL NUMBERS 19 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Electrical Load Distribution by Shaft 20 PXA-0 PMB-0 PMC-0 PM-7 PM+7 PM-8 PM+8 PM-9 PM+9 PM-11 PM-10 PM-12 PM-11 PM+12 PM Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

21 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Questions? 23 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Additional Information 24 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

25 Americas Region Electrical ILC CFS Baseline Technical Review March 22, 2012

Power System Configuration - KCS kV/69kV/34.5kV One Line Diagram Americas Region Conventional Electrical System Design Summary March 21, 2012