UVM -IBM Energy Collaboration Meeting 3/19/12. Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405 (802)656-1072 (802)656-1075.

Slides:



Advertisements
Similar presentations
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
Advertisements

New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.
Mockup. Analyze data using Study data at detailed level Identify target action to prevent revenue lost Geographical Info Device Info Customer Segmentation.
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
HARVARD MEDICAL SCHOOL. HARVARD MEDICAL SCHOOL Brian Barmmer Facilities Engineer Managing Critical Facilities at Harvard.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Welcome To Our 14 th Annual All Hands Meeting Sal Chiarelli, Director of Physical Plant, 9/16/2014.
Facilities Management and Planning Horace Bomar, Director November 1, 2011.
Recycle North Building Renovation and Design Senior Capstone Design Project Civil and Environmental Engineering Scott Hamshaw Presenting.
CWS 70ºF CWR 80ºF Cooling Tower Humid air Out with heat Dry air In Central Energy Plant A/C Unit Work EMCS 404 Chilled Water Supply 40ºF Chilled Water.
Benchmarking Properties for Energy, Water, and Resident Complaints Prepared by Steven Winter Associates & Tohn Environmental Strategies Special Thanks.
UTC’s Central Energy Plant Humid air Out with heat Central Energy
Utility Planning For North Campus Upgrades Area in and around Cook Physical Science Building Sal Chiarelli, Director of Physical Plant November 15, 2007.
Physical Plant Department Physical Plant Department Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405
Department of Facilities Management Maintenance & Operations.
District Energy Corporation Sustainable Project SW 40 th Thermal Energy Facility To Serve the New Lancaster County Adult Detention Facility April 2011.
Transitioning to a Cleaner Energy Supply. Catalyzing climate solutions …in the lab …in the classroom…on our campus.
FY13 Budget Priorities 8/9/ The mission of the University of Alaska Southeast is student learning enhanced by faculty scholarship, undergraduate.
Facilities Summary of Sightlines’ Report Campus Profile and Customer Service Survey Results
Oklahoma City Community College Strategic Planning Approach Cuts Cost….Improves the Learning Environment Smart and Sustainable Campuses Conference Monday,
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Cogeneration at UC July 18, Welcome 3 Transformation of the Power Plant POWER PLANT CENTER OF CAMPUS CENTRAL UTILITY PLANT 2007.
UVM UTILITY SYSTEM MASTER PLANNING IDEA CONFERENCE International District Energy Association Sal Chiarelli, Director of Physical Plant, UVM February 2006.
Presented by: Sal Chiarelli, Director of Physical Plant Panel: Terry Robbins, Facilities Zone Manager, Davis Zone Andy Galaczy, Senior Plumber, Davis.
CITY OF MERIDIAN FY07 BUDGET HEARING Mayor – Tammy de Weerd Council President – Shaun Wardle Council Vice President – Joe Borton Council – Keith Bird Council.
GUHSD CITIZENS COMMUNITY MEETING MARCH 24-26, 2015 Facilities and Capital Budget Overview This Presentation Will Be Posted On Our Website:
© Copyright 2014 OSIsoft, LLC. Presented by A Robust Data Management System for Integrating Campus Sustainability Goals David Trombly, PhD.
Riverside Overpass Master Planning Presenters: Sally Swanson & Magdy Abdalla June 11, SALLY SWANSON ARCHITECTS, INC. Riverside Elementary School.
ANGELO STATE UNIVERSITY FINANCE AND ADMINISTRATION Sharon K. Meyer Vice President.
1 FY 2006 Department Overview Presentation Sal Chiarelli, Director of Physical Plant July 19, 2005.
Chicago One N Franklin. 2 Energy Management and Conservation Across a Nationwide Portfolio of Office Buildings Paul Saccone Vice President – Engineering.
Planning & Community Development Department Hillsides Residential Care and Educational Center Master Plan City Council July 20, 2015.
 Net Student Revenues  2384 undergraduate students  Comprehensive Fee - $57,900  90% receive institutional aid –average aid $25,300.
Mooo’vin Forward In Vermont Developing A Comprehensive Facilities Plan At UVM.
Some Basic UVM Info 425 acres of maintained acreage.. Central Steam Plant Central Chilled Water Plant Back Up Boilers Research.
Net-Zero Rubenstein 5% Energy Reduction Goal Main campus electricity is supplied by the Burlington Electric Department (BED). Nuclear energy, which comprised.
Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT (802) (802) fax
Class Project Report Sustainable Air Quality, EECE 449/549, Spring 2008 W ashington University, St. Loui, MO Carbon Footprint of Danforth Campus Buildings.
1 Limestone County School District Energy Update Year Eleven Report September 2008 – August 2009.
East Lansing Public Schools PLANNING FOR THE FISCAL YEAR AND BEYOND March 28, 2005.
Energy Conservation in Computer Intensive Learning Environments.
University of Washington Tacoma Budget Presentation May, 2014.
Demand Response and Smart Grid
A Model For Centralized Network Support On The Campus Basil Irwin Senior Network Engineer June 8, 1999 National Center for Atmospheric Research.
Welcome To The 5 th Annual All Hands Meeting. FAIRY WOLF DUCKLING.
Collaborating with Conferences By Kevin Reading and Merrill Marker May 31, 2015.
Physical Plant 2015 All Hands Meeting Sal Chiarelli, Director of Physical Plant, UVM October 8, 2015.
Background Information The United States uses a lot of energy – nearly a million dollars worth of energy every minute, 24 hours a day, every day of the.
TOTAL LAND USE ACRES 12% ACRES 21% ACRES 62% ACRES GREEN SPACEPARKING LOTS & ROADWAYS BUILDING FOOTPRINTSWALKWAYS.
Energy Huntsville Opportunity Report and Government Collaboration February 2016.
Campus Energy Use Intelligent Infrastructure for Energy Efficiency May 25, 2007 Peter Cooper Dept of Facilities, Manager of Sustainable Engineering and.
Central Piedmont Community College A great return! A good investment. Charlotte area’s career college.
Chilled Water Plant Overview From Project Concept To Operation July 26, 2007.
Personal details: ENG.Iqbal AL-tayyar Bachelor in Mechanical Engineering from Kuwait university. Director of Technical Supervision Department. Applied.
Securing The Future of Your Estates Mark Q. Swales Deputy Director Facilities Directorate and Chair of CUBO.
THE NELSON INSTITUTE CARBON FOOTPRINT PROJECT AASHE Conference November 11, 2008 Damon Clark Summit Blue Consulting Jeannette LeBoyer Econergy.
LAND USE AND REVENUE FY 2013 – 2014 REVENUES ANALYSIS.
North Penn School District
Budget Model Basics.
University Budget and Marginal Cost Components
Budget Model Basics.
Director Of Physical Plant UVM 284 East Avenue, Burlington VT 05405
Improving Energy Reliability & Performance
Improving Energy Reliability & Performance
Energy Environment ENVE 411 Energy conversions.
Town of Camp Verde The Center Of It All Annual Budget Process.
Chancellor Glen D. Johnson
Presentation transcript:

UVM -IBM Energy Collaboration Meeting 3/19/12

Salvatore Chiarelli Director Of Physical Plant UVM 284 East Avenue, Burlington VT (802) (802) fax

Some Differences Between UVM and IBM Open access to the business Many people making decisions (multi-org) Historic buildings (State and Burlington) Individual metering on most buildings Franchise fee 3.5% BED Safety, security, comfort for everyone is #1 Burlington Planning and Zoning UVM Can’t move to another location Our customers on site Not too much process heating and cooling Town Gown relationships No special rate negotiations BED Surrounded by Burlington residents Increasing in every way High frequency of turnover Parents/direct connect to students Building Permits to do everything Student initiatives Summer Camps Athletics Conference and Events Schedules/classes etc Aesthetics and Beauty are very important All of these impact our utility profile and performance

Some Basic UVM Info 425 acres of maintained acreage.. Central Steam Plant Central Chilled Water Plant Back Up Boilers Research to Day Care Multi Campus, CRF, Morgan Horse Farm, Spear Street, Maple Research etc Over 5.7 Million Square Feet, 5.2 On Main Campus, Over 200 Buildings 70,000 Control Points On Johnson and Honeywell Systems Delta V Boiler Controls Some Software We Use In PPD. FAMIS, KRONOS, School Dude Utility, Tiscor, Code Blue,

Square Footage Growth Main Campus Burlington 39.5 % Increase In Square Footage 3, ,191,147

Student Population Growth FTE 41 % Increase In Student Enrollment

Faculty Staff Growth 13 % Increase In Faculty Staff EVERY DAY WE CAN HAVE OVER 16,000 PEOPLE ON CAMPUS

Square Footage Growth Main Campus Burlington 18 % Increase In Electric Consumption Vs almost 40% campus growth

Approximately $14 Million Utilities or 2.3% of Total Budget Activity and 4.8% GF Budget.