Thesis 2005 Cira Centre – Philadelphia Structural Redesign of Lateral Force Resisting System Andrew Kauffman Structural Option.

Slides:



Advertisements
Similar presentations
The Optimus Signature Boutique Offices, India AE Senior Thesis 2013 Punit G. Das | Structural Option Faculty Advisor: Dr. Linda Hanagan.
Advertisements

Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Allison Lamb Structural Emphasis April 16, 2003 New Science Center Lateral System Redesign.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
LOCKWOOD PLACE BALTIMORE, MARYLAND Monica Steckroth- Structural Option.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
George Read Hall The University of Delaware
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Final Thesis Presentation Washingtonian Center Lee ResslerApril 15, 2008 Faculty Advisor: Dr. Memari.
Duquesne University Forbes Expansion
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Mathew Nirenberg AE Senior Thesis Structural Option.
1.  S.T.E.P.S.: Science, Technology, Environment, and Policy Building  Education, laboratory, and research  Owner: Lehigh University  Location: Bethlehem,
Helios Plaza Houston, TX Advisor - Dr. Hanagan Kevin Zinsmeister Structural Option.
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
URS – ARENA DISTRICT OFFICE BUILDING DAVID LEE STRUCTURAL OPTION.
Traci Peterson Structural Option Senior Thesis Presentation The Del Monte Center at The North Shore The Pennsylvania State University Department of Architectural.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Adam Love Structural Senior Thesis Presentation 2010 The Pennsylvania State University FDA OC/ORA Office Building Silver Spring, MD.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
NEW VIRTUA VOORHEES HOSPITAL Voorhees, NJ Paul Stewart Structural Option Senior Thesis Presentation 2010 The Pennsylvania State University.
Introduction 120,000 SF 10 Stories (90ft) $40 Million Aug – Dec.2011 Presentation Outline Introduction Base Steel Redesign Progressive Collapse Tie.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Adam Kaczmarek Structural Option Spring 2011, Hanagan Cambria Suites CONSOL Energy Center Pittsburgh, PA Cambria Suites Hotel Pittsburgh, PA Adam.
Student Health Center Jacob Brambley - AE (structural option)
Chagrin Highlands Building One Beechwood, Ohio Branden J. Ellenberger - Structural Option Senior Thesis 2004.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Proposal Design of Chevron and Diagonal Braced Frames Ting Wall Façade Green Roof INTRODUCTION, BUILDING STATS, + OVERALL CONCEPT CONCLUSIONS,
Hunter Woron Spring 2012 Structural Professor Parfitt.
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Acterna Headquarters John M Sekel Germantown, Maryland
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Project: 250 West Street, Columbus, Ohio
RiverView Condominiums II Chicago, IL
Presentation transcript:

Thesis 2005 Cira Centre – Philadelphia Structural Redesign of Lateral Force Resisting System Andrew Kauffman Structural Option

Presentation Outline Introduction Building Description Structural System Problem Statement Solution Overview Structural Redesign Mechanical Redesign Conclusion

INTRODUCTION

Introduction Adjacent to 30 th Street Train Station - Philadelphia, PA 291,000 s.f., 28 story high rise office building Convention center, restaurants and retail space Tallest building in Philadelphia, outside Center City Scheduled for completion – October 2005 Total Projected Cost – $200 million

BUILDING DESCRIPTION

Building Description – Project Team Architects – Cesar Pelli and Assoc./Bower Lewis Thrower General Contractor – Turner Construction Co. Structural Engineer – Ingenium Inc. Civil Engineer – Pennoni Assoc. MEP Engineer – Jaros Baum and Bolles Lighting Design - Cline Bettridge Bernstein Acoustic Consultant - Cerami and Associates Curtain Wall Consultant - Israel Berger and Associates

Building Description- Architectural Features 725,000 s.f. rentable space Open plan office levels: 727,725 s.f. (average) 9 ft. floor to ceiling heights Pedestrian bridge connecting to 30 th Street train station Single point of entrance in main lobby, added security Highly reflective glass curtain wall

Building Description – Building Systems Electrical – 13.2 KV primary voltage 480Y/277 volt, 3 phase, 4 wire Secondary system Mechanical – Fan powered, VAV system Includes 4 cooling towers located in top mezzanine Conveying – 14 high speed traction elevators Low-rise, mid-rise, high-rise Configuration

STRUCTURAL SYSTEM

Structural System – Overview Steel frame super-structure Composite floor system Drilled pier foundation Lateral System: Combination of braced and moment frames

Structural System – Floor System Fully composite, 5 ¼ in. floor system, with LW concrete, metal decking, 50 ksi steel framing members W18x35 and W24x76 typical beams and girders, 30’x30’ bays, typ.

Structural System – Vertical Framing Drilled concrete piers with up to 21.5’ penetration into bedrock Large built-up column sizes including W36x1202 wide flange members and 829 lb/ft. built-up box sections Forking Columns Leaning Columns

Structural System – North/South Building Section

North/South Section

Structural System - East/West Section

East-West Section

Structural System – Lateral System East/West - Located in building core Combination of braced frames and moment connections

Structural System – Lateral System East – West Direction Along column lines C & D Located in structural core Exterior braced frames Interior moment frames

Structural System – Lateral System North/South – Located in building core Combination of braced frames and moment connections

Structural System – Lateral System North - South Lateral System Along column lines 4 & 7 Located in Structural Core Exterior Moment Frames Interior Braced Frames

Structural System – Lateral System North/South – Located along exterior frames Only moment frames

Structural System – Lateral System North - South Lateral System Along column lines 1 & 10 All moment frames Varying stiffness

PROBLEM STATEMENT

Problem Statement – Overview Complicated Structure to Analyze Varying Floor Geometry Large built-up members Complicated Lateral System 1.Combination of braced and moment frames 2.Lateral frames with varying stiffness

Problem Statement – Lateral Load Assumptions Lateral Loads used in actual design were developed using a wind tunnel analysis Wind Tunnel results yielded 65% of total shear and 75% of the overturning moment, compared to ASCE7-02, analytical method. Strength considerations did not control the original design of the building. Torsional acceleration at corner offices was the limiting factor that controlled the design

SOLUTION OVERVIEW

Solution Overview – Lateral System Redesign Develop wind and seismic loads based on ASCE7-02 Redesign Lateral System based on these loads. Compare cost of redesign to cost of original structure

Solution Overview – Design Goals Gain a better understanding of lateral force resisting system design for steel buildings Investigate alternative lateral system configurations Meet the design criteria of IBC Limit interstory drift Limit overall building drift to L/400 criteria Achieve an economically feasible design Optimization of original design was not a goal

Solution Overview - Procedure Develop wind loads using Analytical Procedure Model 2-D lateral frames using GT Struddle Determine relative stiffness based on virtual loads Distribute loads based on stiffness and torsion analysis Analyze frames for deflection and interstory drift Redesign lateral frames based on drift criteria - iterative Compare cost of redesign to original structural system

Solution Overview – Mechanical Breadth Study Analyze feasibility of adding enthalpy wheels to the original mechanical system. Goal: Utilize the properties of building exhaust to save $$$

STRUCTURAL REDESIGN

Structural Redesign – Stiffness Analysis Created model of each lateral frame in GT Struddle 100k virtual load at top of each frame to measure relative stiffness

Structural Redesign – East/West Lateral Frames Equal Stiffness Distribute half of total story load to each frame Equal distance from center of plan Torsion had minimal effect in this direction Column Lines C & D

Structural Redesign – Load Distribution

Structural Redesign - Results Total Deflection: 13.25” L/400 = 13.08” Acceptable based on occupancy comfort

Structural Redesign – North/South Direction Modeled lateral frames along Column Lines 1,4,7,10 Applied Virtual Load at levels 28,20,10

Structural Redesign – North/South Direction CL 1CL 4/CL 7CL 10

Relative stiffness varied with height. Applied uniform 10 kip load to verify stiffness Plotted results and fit equation Solved equation for stiffness in terms of height Structural Redesign – North/South Direction

Performed torsion analysis at each level based on center of rigidity Included 5% eccentricity per code, and determined loads on frames

Structural Redesign – North/South Direction Applied load to models in GT Struddle and analyzed results

Structural Redesign – Results Each lateral frame deflected equal amounts. All frames deflected well over the L/400 limit ” 17.16” 19.92”

Structural Redesign – Solution Alleviate interstory drift problems Limit overall building drift to 12” Started with exterior frames

Structural Redesign – North/South Direction Analyzed several bracing configurations using iterative procedure. Eliminated interstory drift problems, limited total drift to 12”

Structural Redesign – North/South Direction Used same procedure for interior lateral frames along column lines 4 & 7 Could not limit drift to 12”

Structural Redesign – North/South Direction Increased stiffness of exterior lateral frames W14x145 bracing members Additional chevron braces to these frames Limited total drift to 9” Changed bracing of interior frames W14x159 bracing members Increased stiffness of girders to W33x221 Reapplied stiffness analysis and torsion calculations Calculated new story loads

Results

Structural Redesign – Cost Analysis Used R.S. Means to estimate total cost of original structure 20% total building cost = $ 40 million Performed take-off to calculate cost of lateral system redesign Compared additional cost to overall structural cost Cost Increase = 0.6% Structure Cost Cost Increase = 0.1% Structure Cost

Mechanical Redesign

Mechanical System Redesign Fan powered VAV system Supply Air: 80% return, 20% outdoor air Exhaust: based on 150 cfm/toilet, 20 cfm/sink Typical Air Handler Size: 23,500 System Description Procedure Use ASHRAE Bin data to analyze a full year cycle Based on 2 design condition: on peak – business hours, off peak – evenings and weekends Calculated total building load with/without use of enthalpy wheel Compared loads and calculate savings

Mechanical System Redesign – Typical Floor Total Savings = Sensible Load savings + Latent Load savings Enthalpy wheels turned off when no energy is saved Additional energy can be saved by modulating wheel

Mechanical System Redesign - Results Using Peco Energy Rates: Total Energy Savings: 671,236 kwh Total Cost Savings: $28,506/year

CONCLUSION

Conclusion Based on lateral load assumptions used for this analysis, the lateral frames in the North/South direction should be designed with increased stiffness based on occupancy comfort criteria. Redesign of lateral force resisting system is an economic solution compared to overall cost of structure Enthalpy wheels should be utilized by the mechanical system to increase overall efficiency and save $$$.

Acknowledgments AE Faculty and Staff Dr. Memari and Dr. Geschwindner Dr. Hanangan and Prof. Parfitt Jeff Weinstein and Andy Bush, Brandywine Realty Trust Dr. Banavalker, Ingenium Inc. Peter Jennings, Jaros, Baum, and Bolles My Family and Friends My wife Nicole