F LORIDA S OLAR E NERGY C ENTER A Research Institute of the University of Central Florida Assessment of Energy Efficient Methods of Indoor Humidity Control.

Slides:



Advertisements
Similar presentations
TOUR OF NIST MANUFACTURED RESEARCH HOUSE Andy Persily, Steve Nabinger, Steve Emmerich, Cindy Howard Reed Building and Fire Research Laboratory National.
Advertisements

Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Heating and Air Conditioning I Principles of Heating, Ventilating and Air Conditioning R.H. Howell, H.J. Sauer, and W.J. Coad ASHRAE, 2005 basic textbook/reference.
100% Outside Air and Dehumidification Management
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
The Role of Controls for Indoor Air Quality Kent W. Peterson, PE, Fellow ASHRAE P2S Engineering, Inc. Mid Columbia ASHRAE Chapter.
1 Stanley A. Mumma, Ph.D., P.E. Prof. Emeritus, Architectural Engineering Penn State University, Univ. Park, PA Web:
Heat Recovery for Commercial Buildings
Introduction Enthalpy Wheel
The Three Tiered Philosophy
VAV DESIGN FOR IMPROVED INDOOR AIR QUALITY. “Air conditioning is the control of the humidity of air by either increasing or decreasing its moisture content.
The Portland Street Building Back to “Select a building” Back to “Select a building” NatVent Presentation of the building Presentation of the building.
Presentation for Florida Building Commission Regional AC Efficiency Workgroup May 9, 2008 Lennox Industries Inc.
1 Meeting ASHRAE Fundamentals, Standard 55 & 62.1 with Chilled Beams Displacement Ventilation.
The House as a System 1. Air Temperature and Water Vapor.
C A L I F O R N I A E N E R G Y C O M M I S S I O N 2013 Building Energy Efficiency Standards Residential Zoned AC Discussion August 18, 2011.
ASHRAE Presentation: VRF Overview Mitsubishi Electric Presenter: Phone number ©2011 Mitsubishi Electric& Electronics USA, Inc.
Passive House Seminar for the Professionals from the Building Sector.
A Research Institute of the University of Central Florida FBC Mechanical Technical Advisory Committee Meeting June 25, 2014 A Review of Home Airtightness.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
HVACR416 - Design Air Distribution Air Properties and Behavior Important properties of interest include: o Weight of air. o Manner in which air.
Heat Loss & Gain Calculations 1. How Heat Moves in Homes Conduction is the transfer of heat through solid objects, such as the ceilings, walls, and floors.
Brett Graham Habegger Corporation Midwest Regional Sustainability Summit May 1, 2015.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Welcome to S&P USA & the 2012 International Residential and Mechanical Code for Ventilation.
Product Introduction.
Evaluation of Space Humidity Control and System Energy Usage for Conventional and Advanced Unitary Equipment Michael J. Witte and Robert H. Henninger GARD.
PSU Building Thermal and Mechanical Systems Laboratory Environment A/E Kurt M. Shank, M.S. & Stanley A. Mumma, Ph.D., P.E. College of Engineering Department.
National Tribal Forum on Air Quality Co-Sponsored by: Institute for Tribal Environmental Professionals & National Tribal Air Association.
BEM CLASS 5 Building Thermodynamics – 2 Air-conditioning Load Calculation – latent heat, solar and internal gains.
Conditioning of Moist Air
Home Ventilation 1 Background: As Habitat homes are being built more tightly to reduce heat loss, there has been an increasing concern about the amount.
1 HVACR416 – Design Principles Air Exchange. 2 HRV’s (Heat Recovery Ventilators)
Ductless Heat Pumps Sizing Example
Objectives Compare locations in North America Potential for moisture problems Different driving forces Analyze potential for moisture problems in cooling.
Part 2: Buildings as a System Lee F. Ball Jr., PhD
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Source Strength Source Strength Removal Rate Removal Rate Ventilation and IAQ.
Michael Logsdon, Ben Larson, David Baylon 13 December th Avenue NE, Seattle, WA (206)
ASHRAE A Ventilation Standard for Residential Structures Ventilation and Acceptable Indoor Air Quality in Low- Rise Residential Buildings.
Ben Larson 1 November th Avenue NE, Seattle, WA (206)
Michael Logsdon, Ben Larson, David Baylon 13 December th Avenue NE, Seattle, WA (206)
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
Home Ventilation 1 Background: As Habitat homes are being built more tightly to reduce heat loss, there has been an increasing concern about the amount.
Announcements 1) Thursday 02/09 In class Midterm Exam - I will be in the classroom at 9:20 AM - Example and solution are posted on the course website 2)
Achieving Dry Outside Air in an Energy-Efficient Manner PSU Building Thermal and Mechanical Systems Laboratory Environment A/E Stanley A. Mumma, Ph.D.,
1 1 Weatherization & Indoor Air Quality Impacts of Weatherization on Air Quality and Comfort Inside Your Home Prepared with the assistance of Jed Harrison,
Design What is the first step in designing a high-performance building? Would it be: Identify synergies Select the correct HVAC system Design around human.
Alexander Radkoff Mechanical Option | Spring 2014 Advisor: Dr. Stephen Treado 123 Alpha Drive Pittsburgh, Pennsylvania
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
Day 3 Part 3 Technician’s Guide & Workbook for Home Evaluation and Performance Improvement.
A New (Rational) Way To Condition Air (and Save Energy) AEE, Philadelphia February 18 th 2016 Andrew Mongar, President, AirGreen LLC.
HCB 3-Chap 19A: All-Air Systems_Single Zone 1 Chapter 19A: ALL-AIR SYSTEMS: SINGLE ZONE AND SINGLE DUCT Agami Reddy (July 2016) 1)Introduction and common.
Maria’s Restaurant Chapter 2 Section 9
ENVIROCENTER PHASE II JESSUP, MD
Munters DH Systems for Hospital Applications
Munters DOAS, Chilled Beams and VRV
Munters DOAS and Chilled Beams
Chilled Beam Performance:
Cheryl Hughes Regional Sales Manager October 6, 2015
HCB 3-Chap 19A: All-Air Systems_Single Zone
Variable Refrigerant Volume
VAV DESIGN FOR IMPROVED INDOOR AIR QUALITY
Technician’s Guide and Workbook for Zoning Section 1: Introduction
Professor of Architectural Engineering College of Engineering
A Ventilation Standard for Residential Structures
Announcements Exam 1 Next Class (Thursday, March 14th):
Objective Revie the Cooling Cycle Learn about air distribution systems
Maria’s Restaurant Chapter 2 Section 9
Presentation transcript:

F LORIDA S OLAR E NERGY C ENTER A Research Institute of the University of Central Florida Assessment of Energy Efficient Methods of Indoor Humidity Control for Florida Building Commission Research Presented by Charles Withers, Jr FL Building Commission Energy TAC Mtg. June 26, 2014

Presentation Overview Brief Background on Research Need Research Objective Method Findings Conclusions

3 Background / Research Need Florida Code (2014) will require houses be airtightness tested and permit no air leakage exceeding 5 ACH50. It will require mechanical ventilation in homes <5ACH50. Currently ventilation via: 1.Naturally induced wind and temp. 2.Mechanically induced kitch./bath exhaust duct leakage (unintended)

4 1 Swami, M., J. Cummings, R. Sen Sharma, C. Withers, M. Basarkar "Florida Building Code - Enhance Florida's Building To Next-Generation Energy & Mechanical Codes and Enrich Compliance " Florida Solar Energy Center, Rpt: FSEC-CR , Nov. 29, ach off = ACH50/40 per Cummings, J.B.,Moyer, N., and Tooley, J.J., "Radon Pressure Differential Project, Phase II: Infiltration,"FSEC-CR , Florida Solar Energy Center, Cocoa,FL, November Cummings,J.B., Tooley,J.J. and Moyer,N., "Investigation of Air Distribution System Leakage and Its Impact in Central Florida Homes," FSEC-CR , Florida Solar EnergyCenter,Cocoa, FL, January Natural forces that drive infiltration in Florida homes are small. Reasonable expectation mechanically vented homes will experience greater air change rates and increased latent loads. Concern of adequate indoor RH control for at least periods of time. Supplemental dehumidification may therefore be necessary in some homes where RH is desired to be controlled. Background / Research Need Currently, houses not mechanically vented likely have average about 0.21 ach vs 0.35 ach target

5 Research Objective To identify approaches and technologies which can achieve energy-efficient indoor RH control in Florida homes with code required mechanical ventilation rates. 1.Assess energy efficiency and cost-effectiveness of various approaches to manage the latent load in homes from a literature review and existing experimental data. 2.Complete a minimum of four different experiments in a lab building to assess resulting indoor RH and energy consumption. The experiments are to use various latent load management approaches (including a dehumidifier) at various levels of mechanical ventilation.

6 What does it mean to “manage the latent load” or “maintain effective RH control” in Florida’s climate? Lit Review Results It depends who you ask and who its intended for. Generally, limiting the hours of indoor RH at or below 60% should be satisfactory for most, and avoid potential moisture issues.

Health needs of occupants House design Personal comfort / aesthetic preferences First cost and operational costs Occupant driven operations Task 1 Lit Review Several RH control measures were identified, but there are important considerations in selecting one. Factors to be considered are:

8 Overcooling –lowering setpoint to force more run time –cold and clammy (late fall/winter) –Some dual and var. capacity have tstats that permit 2°F overcooling in RH control Reduced fan speed –Lowers SHR, better dehumidification, but limited to runtime (sensible load vs cap.) Effectiveness depends on cooling run-time & can not control RH all hours year-round The lowest first cost measures: Task 1 Lit Review

9 Dehumidifier (DH) generally the lowest first cost measure that can control RH effectively year-round, but: Task 1 Lit Review Cost can > $ 1800 (high end) Least efficient / high energy operating cost Units < $ 300 generally louder and lowest efficiency OA could be ducted near the DH for better RH control –Consider separate dehumidistat Physical space installation limitations Have to drain condensate somewhere

10 Other potential technologies for improved RH control Task 1 Lit Review Can not control RH all hours of year ERV- energy recovery ventilation Heat pipes Sub-cool reheat Full condensing reheat (nearly) Dual and Variable Capacity Central Systems

11 Other potential technologies for improved RH control Task 1 Lit Review Can effectively control RH all hours Desiccant Dehumidifier DOAS- central ducted design Minisplit OA system?

12 Completed four different experiments: Two energy-efficient configurations Two different ventilation rates Dehumidifier controlled by a remote dehumidistat set at 60%RH Task 2 Experimental Research

13 One Test Building 2000 ft 2 with R5 CMU walls. Slab on grade some carpet/tile Windows single- pane clear. Ceiling R19 batt. Building airtightness 4.5 ACH50. Ducts CFM25out=0. A manual J8 load calculation on the building calculated a summer 99% design total cooling load of 35,780 btuh based on 130 cfm OA. Controlled internal sensible 3851btuh and latent loads 397btuh. Task 2 Experimental Method Two Ventilation Rates 60 cfm IMC and 2012 IRC requirement for 3 bedroom home between 1501ft ft cfm- high end for large 4-5 bedroom or for 0.5 ACH50 using ASHRAE … not FL code req.

14 MSDOAS Test Configuration Test 1 : 130 cfm OA to MS; Central SEER21; DH backup at 60%RH Test 2 : 60 cfm OA to MS; Central SEER21; DH at 60%RH

15 SEER21 Var. Cap. System Tests Test 3 : 60 cfm OA to Central SEER21; DH at 60%RH Test 4 : 130 cfm OA to Central SEER21; DH at 60%RH

16 Test 4 Results (SEER21,

Lit. review found several RH control measures. –Consider home design and occupants needs before selecting one. –Overcooling and reduced fan speed may be acceptable to some. –Dehumidifer lowest first cost with several potential negative factors. –Dual cap. and Variable cap. Central systems may be adequate for many. All four experiments controlled indoor RH between 47%-54% RH –Eliminated need for dehumidifier. –Not tested under fall/winter season pd.s (most challenging condition). Conclusions

OA captured at return of central SEER 21 VC is energy-efficient and effective. –Only 22.3 kwh/day cooling at 130 cfm OA (seasonal summer day) –Drops to 21.8 kwh/day at 60 cfm OA (0.5kwh/day less, 2.2%) MS not needed with central SEER 21 –used 2.80 kWh/day (12.8%) more energy than just S21 central. –Better RH control, but not necessary. Phase 2 continuation research is needed: –DBPR approved Phase 1 (terminates June 30, 2014). –Determine cost-benefit of SEER21 OA relative to base efficiency case SEER13 FC. –MS with SEER 13 likely energy savings and better RH control vs OA ducted to SEER13. Conclusions

Based on Phase 1, we recommend the following testing in Phase 2: (actual # of tests that can be conducted are dependent upon time available to rotate through experiments.) Conduct further testing July November 15, SEER 13 central FC system; 60 cfm OA ducted to central zone near DH control. This will be an important base efficiency test to compare to other results and evaluate how much DH energy may be needed. 2.SEER 13 central FC system; 60 cfm OA ducted to return. Provides direct comparison to Test 3. 3.SEER 13 central FC system; 60 cfm continuous exhaust cfm OA ducted to MS with SEER 13 central FC system. Given the much lower efficiency of the SEER13, expected much lower operating costs than running the S13 unit alone and will result in lower indoor RH which could eliminate the need for an inefficient dehumidifier. 5.Collect additional data for Phase 1 Test 3 S21 VC (use RH control 60 cfm OA. This test uses a vent rate close to most homes and was the most efficient of Phase 1 testing. Final Report deliverable with comparison of energy use and RH control effectiveness of all tested measures with conclusions regarding any learned limitations. Further Research Needs

Questions? Chuck Thank You