Saverio MINUTOLITIG meeting, 10 February 20111 Report on T1 installation activities and achievements made during this shutdown.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
T1 status and plans INFN Genova November 2014 Collaboration Meeting.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Saverio MINUTOLITOTEM T1 Readiness Review, 30 November Readiness Report on T1 Electrical Systems and Electronics.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Saverio Minutoli INFN Genova 1 T1 Electronic status Electronic items involved: Anode Front End Card Cathode Front End Card Read-Out Control card Slow Control.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
EE and SE Installation Wolfgang Funk - CERN CMS 11/9/ ) Introduction 2.) Installation scenario 3.) SE schedule, manpower, cost estimates 4.) EE.
André Augustinus 16 September 2002 Safety issues.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
S. Lusin, T1 ESR, CERN 17 Sep 101 Totem T1 ESR 17 Sep 10 S. Lusin Observations from Electrical Inspection of T1.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Muon System Safety Issues Burkhard Schmidt.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
Roman Pot Engineering Design Review CERN, 14 February 2006 M.Oriunno, CERN PH-TOT Installation, Commissioning and Schedule.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Installation Review March ‘03 TPC Thomas C. Meyer/EP-AIT 1 Pre-installation and Functional Tests StartFinish  Certification of field cage…………………
T1 status and plans Fabrizio Ferro – INFN Genova 5 th Technical Coordination Workshop February Bogis-Bossey.
T1 hardware Detector Control System, OK several automates have been added, LV and HV sequences. FSM manages transition between Busy, ON and OFF states.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Status of NA62 straw electronics Webs Covers Services Readout.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
Preparation & Commissioning of TOTEM for the Run-II of LHC S.Giani on behalf of the TOTEM Collaboration.
Installation of the T600 at Fermilab Fermilab, February 15,
Danilo Domenici – LNF. Detector Upgrades Overview CSN1 - 4 Maggio 132 Inner Tracker QCAL CCAL.
Installation of the T600 at Fermilab
TOTEM Electronics Status
Introduction Status before the 2009 run Results from the 2009 run
CMS Area Working Group Meeting
T1 status (a selection from EDR presentations)
T1 Electronic status Conclusions Electronics Cards:
Chamber Design and Integration RE3/1 and RE4/1
Status of n-XYTER read-out chain at GSI
Pierluigi Paolucci - I.N.F.N. Naples
The digital read-out for the CSC system of the TOTEM experiment at LHC
CSC Electronics Installation and Commissioning CSCE I&C
Overview of T1 detector T1 is composed by 2 arms
The electronics system of the TOTEM T1 telescope
The digital read-out for the CSC system of the experiment TOTEM at LHC
The digital read-out for the CSC system of the TOTEM experiment at LHC
UXC55 ME Muon Endcap On Detector Layout
Pierluigi Paolucci & Giovanni Polese
CSC Electronics Installation and Commissioning CSCE I&C
Presentation transcript:

Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown

Saverio MINUTOLI2 T1 detector in H8 TIG meeting, 10 February 2011

Saverio MINUTOLI T1 minus side  Minus side prepared for installation during Christmas  Installed on 10 th January 2011  2 quarters moved from H8 to IP5 on 16 th Dec  Moved to –HF platform on 2 risers, in the next days  Preliminary mechanical test  Temporary connections to the services –DAQ, LV, HV, DCS, DSS, Gas, Cooling  DAQ Readout and Slow Control test  Water leak detection cable installed. 3TIG meeting, 10 February 2011

Saverio MINUTOLI T1 minus side  Insertion of the two quarters, one by one –CSC and BP clearances verification and adjustment –Frames and CMS envelope clearances verification and adj. –Truss position checked and aligned after survey.  Both quarters inserted into CMS endcaps  No interference of T1 on the alignement lasers  Gas and cooling connections  Cabling and grounding with final cables.  DAQ Readout and Slow Control test  Cabling off  - HF platform moved to 4 risers  Final cabling and readout test 4TIG meeting, 10 February 2011

Saverio MINUTOLI 5 th layer4 th layer3 rd layer 1 st layer Clearances between T1 CSC and BP on CMS minus side (mm) - actual size 2 nd layer mm nearfar

Saverio MINUTOLI T1 minus side 6TIG meeting, 10 February 2011

Saverio MINUTOLI T1 minus side 7TIG meeting, 10 February 2011

Saverio MINUTOLI T1 minus side 8TIG meeting, 10 February 2011

Saverio MINUTOLI T1 plus side  Installed on 17 th January 2011  Same procedures than the Minus side. 9TIG meeting, 10 February 2011

Saverio MINUTOLI 5 th layer4 th layer3 rd layer 1 st layer Clearances between T1 CSC and BP on CMS plus side ( in mm) NEAR 2 nd layer mm nearfar Picture from the minus side Measurement done by Roman / First closing test -Without shimming mm -Second closing -After shimming

Saverio MINUTOLI 5 th layer4 th layer3 rd layer 1 st layer Clearances between T1 CSC and BP on CMS plus side ( in mm) FAR 2 nd layer mm nearfar Picture from the minus side Measurement done by Roman closing value -Closing test without mm - theoretical value Dmitry mm - actual size for the 5 th layer the others layers theoretical value of Roman

Saverio MINUTOLI T1 plus side 12TIG meeting, 10 February 2011

Saverio MINUTOLI T1 plus side 13TIG meeting, 10 February 2011

Saverio MINUTOLI DSS LV OPFCs test 14  Each T1 quarter is powered independently. 4 electro-mechanic breakers installed Tested and deployed within DSS. Electrical drawing updated OPFCs AC input and DC output tested 385V DC connections tested on both sides (rack and platform). TIG meeting, 10 February 2011

Saverio MINUTOLI T1 services rack on HF platform 15 4 minirack installed on HF platform Safety smoke detector and Thermostat installed and tested (DSS) All cables from the Counting Room traced and tested Cooling circuit tested on –side, +side. TIG meeting, 10 February 2011

Saverio MINUTOLI ¼ T1 DCS and DSS systems 16  DCS system 3 PT100 temperature sensors installed and checked 2 on electronic boards and 1 on cooling plate 2 active Radiation Monitor sensors installed and checked 1 on 1 st plane internal and 1 on 5 th plane external On the adjacent quarter the RadMon sensors are located on the same plane but opposite sides.  DSS system 2 PT100 temperature sensors installed and checked 2 on electronic boards.  2 passive Radiation Monitor sensors installed TIG meeting, 10 February 2011

Saverio MINUTOLI T T T M M M B B B = CSC = ROC ROCs 45 ROCs 23 ROCs 01 = IP5 6 th frame DOHM = DOHM C C C C C C C C C C C C C C C = CFEC ¼ T1 + Near (Yellow) _ Passive and Active RADMONs position PRM00 6 (IP- Side) PRM004 (~IP- Side) RM 82 (IP- Side) RM 84 (~IP- Side) TIG meeting, 10 February 2011

Saverio MINUTOLI x78 0x7E 0x77 0x79 0x76 0x7D 0x7A 0x7B 0x7C = CSC = ROC ROCs 45 ROCs 23 ROCs 01 = IP5 6 th frame DOHM = DOHM = SCR cable Slow Control Ring system SCR distributes Fast Command (L1, BC0, Calib, Reset) and LHC clock Manage the F.E. settings through 16 I 2 C channels. DOHM independent LV channel Redundancy connection checked All the ¼ T1 quarters passed the SCR tests. TIG meeting, 10 February 2011

Saverio MINUTOLI Joint test CMS and TOTEM (T1 and T2) 19TIG meeting, 10 February 2011  tested only T1 (10 Jan 2011) with CMS CSC ON, without problem  tested T1 and T2 (3-4 Feb 2011) with almost all CMS apparatus ON, without problem. –PIX, TK, ES (Preshower): out –RPC masked some towers in the trigger (to keep the rate within reason) –ECAL masked one trigger tower (ditto) –CASTOR HV OFF (due to miscommunication and sorted out later) and ON later

Saverio MINUTOLI Effect of B on T1 position  Position checks during ramp to 3.8T  Small (order 1mm total) movements recorded on sensors “axial”(YE2 vs YE3) and “radial”(detectors vs vacuum chamber).  Very good correlation and +/- symmetry of displacements indicates that variation is due to the deformation of the end caps with B. TIG meeting, 10 February 2011

Saverio MINUTOLI Conclusions 21 We are ready. Thank you for your attention. TIG meeting, 10 February 2011