GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562.

Slides:



Advertisements
Similar presentations
PRINCIPLES OF A CALIBRATION MANAGEMENT SYSTEM
Advertisements

SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
ANSI/ASQ E Overview Gary L. Johnson U.S. EPA
ISO in Histopathology Louise O’Callaghan MSc FAMLS
IAEA International Atomic Energy Agency Responsibility for Radiation Safety Day 8 – Lecture 4.
Transformations at GPO: An Update on the Government Printing Office's Future Digital System George Barnum Coalition for Networked Information December.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
The ISO 9002 Quality Assurance Management System
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
FAA FAA Advisory Circular Presented at 9/16/03 Workshop (Chicago, IL) Background – Purpose of the advisory circular – Related regulations & guidance materials.
SAP R/3 Materials Management Module
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
Quality Assurance/Quality Control Policy
Quality Manual for Interoperability Testing Morten Bruun-Rasmussen Presented by Jos Devlies, Eurorec.
David Warne Independent Manufacturing Consultant.
Basics of Good Documentation Document Control Systems
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
CONTRACTUAL FLOW DOWN OF DPAS PRIORITY RATINGS
Introduction to ISO New and modified requirements.
Introduction to Software Quality Assurance (SQA)
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
From Research Prototype to Production
Visit us at E mail: Tele:
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Document Control Basics of Good Documentation and
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
POLICY & OVERSIGHT DIVISION (POD) February 2014 MILESTONE ACQUISITION PLANS TRAINING 1.
Prime Responsibility for Radiation Safety
a guidance to conversion
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
The Role of NCAS Assessments NASA Supply Chain Conference Goddard Space Flight Center November 14, 2007.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
© 2003 The MITRE Corporation. All rights reserved For Internal MITRE Use Addressing ISO-RTO e-MARC Concerns: Clarifications and Ramifications Response.
Mission Success Starts With Safety Michael J. Sampson, Program Manager, Workmanship and EEE Parts Assurance NASA GSFC, Greenbelt, MD Code 306, Systems.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 Acuña1 MAGNETOMETER (MAG) M. H. Acuña NASA/GSFC Laboratory for Extraterrestrial Physics.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
Visit us at E mail: Tele:
Vanguard For Army Transformation PM BCT 1 Predicting What the Future Holds Risk Management PM Brigade Combat Team.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
1 CMBG 2009 Planning for Obsolescence June 27, 2009 John Parler South Carolina Electric & Gas.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Systems Development Process and Methodologies Dr. T. Ravichandran.
© 2016 Chapter 6 Data Management Health Information Management Technology: An Applied Approach.
External Provider Control
Chapter 11 Project Management.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Instructor: Lloyd Hancock
CM-101 Configuration Management Fundamentals
Software Configuration Management
Software Project Configuration Management
World Health Organization
Evaluation of Suppliers of Critical Consumables, Supplies and Services Section February 2016.
University of California - Berkeley
Raytheon Parts Management
Achieving ISO Compliance
Technology for School Leadership
TEAM NAME. TEAM NAME Additive Manufacturing Business Model Workshop Day 2 Outbrief 31 May 2018.
Operationalizing Export Certification and Regionalization Programmes
Project Management Chapter 11.
Single-Phase Qualification of Microcircuits in ESCC 9000
DOE Review of the LCLS Project October 2006
Presentation transcript:

GSFC EEE Parts Standards Activities Darryl Lakins Head, Parts, Packaging and Assembly Office, GSFC, Code 562

3/3/20032 Outline EEE Parts Engineering Process EEE Parts Standards –EEE Parts Documents –EEE Parts Manufacturers –EEE Parts Selection EEE Parts Databases Challenges

3/3/20033 Organization

3/3/20034 Parts Engineering Process Mission Success Parts “need” Mission System Design Mission System Design Design, Build, Assemble, Test Design, Build, Assemble, Test Verify, Integrate, Validate, Operate Verify, Integrate, Validate, Operate ConceptDevelopI&T/Ops Standards (Customer, Requirements, Procurement, Test, etc.) Knowledge Management (EPIMS, Research Inventory, Alerts) Parts Facilities (FA Lab, Logistics) People Space Environment Analysis Mission Requirements Risk Management Technology Alternatives/Trades Packaging Parts Selection/Reliability Parts List Parts Acquisition Manufacturer Surveillance Parts Test (e.g., Radiation, Environment,etc.) GIDEP/Alert Monitoring Logistics Post Delivery Support (I.e., failure analysis)

3/3/20035 Parts Engineering Process -Issues 1.Vishay Resistor –by manufacturer (procurement process) found in I&T 2.ATC Capacitors-by manufacturer (procurement process) found in I&T 3.Optocoupler- by designers (parts selection-space environment) in I&T 4.DC/DC Converter- by designers (parts selection-space environment) in I&T 5.DC/DC Converter (MFL)-by designers (application of part) found in I&T 6.LM 136-by manufacturer (procurement process-screening) found in I&T 7.FPGA-by designers (application of part) found in I&T 8.GPS Receiver-by designers (parts selection) found before I&T 9.Digitizer Boards-by designers (parts selection) found before I&T Mission System Design Mission System Design Design, Build, Assemble, Test Design, Build, Assemble, Test Verify, Integrate, Validate, Operate Verify, Integrate, Validate, Operate ConceptI&T/Ops $ Time 100 1,000 10,000 PER HOURPER HOUR The goal is to catch the EEE parts issues here (I.e., Design in Quality) Not here

3/3/20036 EEE Parts Standards The existing specifications, of which, there are more than 700, are either stored in filing cabinets, websites or internal filing systems. –The Standards System comprises of guidelines, procurement and screening specifications: The Guidelines provide the requirements for screening, lot acceptance testing and qualification testing for individual families of EEE parts. Based on three grade levels (i.e. Grade 1,2 and 3) –The grade levels establish reliability levels for the mission type. Grade 1 is the highest and Grade 3 is the lowest. –New guidelines for selection, screening and qualification established. Old system used as basis guidelines. The new document consist of new technical information, project experiences and new ISO format.

3/3/20037 EEE Parts Standards Procurement specifications for thermostats, connectors, relays and heaters are very popular. –The procurement specifications are being converted to electronic format and will eventually be placed into our database. Screening specifications are obsolete. Most datasheets have been updated and test facilities have incorporated new test procedures and methods that have outdated the existing specifications. –Our plans are to discontinue the obsolete screening specifications. –As new projects are developed, new specifications will be incorporated into our QMS or master catalog. All specifications are approved by the GSFC standards committee. Test methods (i.e., burn-in, DPA, PIND, etc.) that are used in the GSFC EEE Parts Analysis Laboratory are being converted to work instructions (IAW ISO). –We also consider adoption of “NASA approved” standards from other Centers or external bodies.

3/3/20038 Old System to New (ISO) Carbon copy of the previous Code 311 system except that we are using QMS process to document the procedures and guidelines. –Described in Code 562-PG –Examples of the records that are associated with the overall system includes: 562-WI….Procurement Specifications 562-PG….Guidelines G562PXXX….Part Identification Number As time/resources are available the old documents will be converted.

3/3/20039 New Capabilities As new capabilities are added to the Office, such as the Fiberoptics/Photonics Laboratory, new procedures and specifications will be established, posted and maintained by the Office.

3/3/ COTS Challenges Manufacturers of commercial and military or aerospace graded components employ different ideologies regarding quality and reliability issues of their products, which can be described as “produce-it-right” and “produce-it- to-rules plus test-it-right” approaches. Most PEM manufacturers rely on built-in reliability design and thorough process control, leaving testing and verification of quality and reliability of their product to the end users. For these reasons, use of PEMs in high reliability systems is always a risk, and the purpose of qualification and testing of PEMs is to mitigate these risks against known failure mechanisms in project-specific conditions.

3/3/ Manufacturer’s Assessment Presently using DSCC listing of qualified vendors, the NASA Preferred Parts Selection List (NPSL) and the GSFC Procurement Specification Qualified Parts List Directory for information regarding our suppliers. Plan to augment the mentioned repositories using information and assessments provided by Supplier Audit Contract (SAC) and project related audits. The information will be inserted into a database.

3/3/ Manufacturer’s Information

3/3/200313

3/3/ Parts Selection Info Parts are selected by the design engineers. They may use standard parts from NSPL or the preferred parts list (i.e., PPL21). Code 562 assigns a Parts Engineer to work with each project and advise on parts issues, develop plans, and provide procurement support including scheduling of parts deliveries and other tasks (screening, qualification, etc.). The Parts Engineer meets with the designers, instrument managers and system assurance managers on a regular basis. Goddard Space Flight Center 311-PEM instructions (soon to be 562-PG-8700) provides guidance to projects regarding parts selection and is the document most used by Code 562 parts engineers. –Three most important elements are screening, environmental stress testing (or qualification), and DPA. The major elements of screening are electrical testing and burning-in (BI). The major elements of environmental stress testing (EST) are multiple temperature cycling, radiation testing, high temperature operational life test (HTOL), and highly accelerated stress test (HAST) in moisture environments.

3/3/ Database Parts Library- that provides information regarding parts use, testing and lessons learned. EEE Parts Research-that provides information associated with emerging technologies so that NASA engineers are given a sneak preview of the reliability of new “sweet” parts.

3/3/200316

3/3/200317

3/3/ Related Websites Related Documents Experts associated with PEMs

3/3/ Database System (portal) search is capable of searching multiple databases, filing systems and websites simultaneously. The results are arranged so that the user can view related information regarding a EEE parts. Example: –“RF connectors” was the search term. –The system provided the user project related information, specific standards and guidelines, research documents and specific part information. Project Related Specs and Guidelines NPSL Specific parts

3/3/ Requested Information Google search statistics indicate that NASA specifications and MILSPECs are very popular. The NEPP portal receives a lot of hits and referrals that pertain to specifications. Activity by Search Engines with Search Phrases Detail EnginesPhrasesReferrals% 1.googlemil-c % tin whiskers % electronic parts770.28% d % m % rlr % m % resistor manufacturer530.19% m % rwr % tin whisker460.17% cwr % cuinterconnect_evalrep ort.htm semspec 10.00% nepp410.15% intel80.03% mil-dtl % rlr % understanding whisker phenomenon % stereo parts350.13% inductor manufacturer350.13%

3/3/ Visits Visit Summary Visits88,254 Average per Day416 Average Visit Length00:18:13 Median Visit Time00:03:44 International Visits34.38% Visits of Unknown Origin0.02% Visits from Your Country: United States (US)65.59%

3/3/ Challenges Review, Sort and Conversion of hardcopies to electronic documents. Insertion of documents into database that is linked with Standards website to ensure all documents are accessible from the either the standards website, GSFC GDMS and the NEPP portal. Establishment of new standards as new capabilities come online. Staying abreast of the changes that industry is making to facilitate adoption of new standards. Monitoring our suppliers and understanding the complete supply chain from forecasting and obsolescence; to procurement and handling.