Effective Cost Strategies for Manufacturers March 27, 2014.

Slides:



Advertisements
Similar presentations
2009 Lean Ideas, All Rights Reserved1 Lean Manufacturing For Lean Times.
Advertisements

STOCK CONTROL Inventory is often referred to as the graveyard of business because over investment in stock is a frequent cause of business failure.
Concept The various components of the marketing mix must be mixed into a value proposition as per customers requirements Price has to be carefully meshed.
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
ACTG 6310 Chapter 11 – Criticisms of Absorption Cost Systems: Inaccurate Product Costs.
THE CONTEXT OF LOGISTICS. Cycle of Supply and Demand Customers Other Inputs Other Outputs Operations Demand for Products Supply of Products passed to.
Supply Chain Management Group 8 Amanda Williams Chris Lemley Ian Carr Clay Garrison Alvaro Suarez.
1 Process Mapping BA 339 Mellie Pullman. 2 Objectives Service Process Differences Little’s Law Process Analysis & Mapping.
Lean Manufacturing Chris Poteet Scott Carroll.
High Lights of SAP Business One for Manufacturing.
Chapter 7 Functional and Enterprise Systems. Chapter 7Slide 2 Customer Relationship Management  Customer Relationship Management The philosophy that.
SAP R/3 Materials Management Module
Supply Chain Management Kalakota: pp What is a supply chain? The network of retailers, distributors, transporters, storage facilities and suppliers.
Module 18 Activity-Based Costing, Customer Profitability, and Activity-Based Management.
1 Value Stream Mapping Sustainable Operations Professor Mellie Pullman.
PHYSICAL DISTRIBUTION. Logistics & Supply Chain Logistics Component parts & Raw material In-process inventory Finished goods Supply Chain.
Production and supply chain process MIS2101: Management Information Systems Based on material developed by C.J. Marselis.
Logistics.
Chapter 5 Activity-Based Management. 1. How can reasonably accurate product and service cost information be developed? 2. What are the differences among.
Chapter 2 – Enterprise Systems
Ten Steps to Lean Production Steps to CIM 1.Re-engineer (revisit, replan) the manufacturing system Form U-cells to produce families of parts (clusters)
ICT IN SHOPPING ICT in business. Barcode Scanning.
Aggregate Planning and Resource Planning Chapters 13 and 14.
Value Analysis/ Flow Analysis
E-Commerce Chapter 17. E-Commerce E-Commerce is the electronic link from businesses to suppliers, distributors, manufacturers, and customers that facilitates,
XYZ Company 1. XYZ Company 2 Lean Manufacturing Is a way of life. It is a never ending process…… Its tools need to tailored to meet XYZ Company’s needs.
LeanSigma ® Fundamentals Module 4 – Specify Value.
What is DOWNTIME? Scott Thor © Variance Reduction International, Inc. (VRI), All Rights Reserved.
Philosophy and Key Concepts
Clients (and the interface level) Application Server (and the application level) Database Server (and the Database level)
1 Week 8: Production and Supply Chain Process MIS2101: Management Information Systems.
Needles Powers Principles of Financial Accounting 12e Accounting for Merchandising Operations 6 C H A P T E R ©human/iStockphoto.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level 10/19/ Cost Management.
1 © The Delos Partnership 2004 Detailed Performance Measures How to define the core measures.
“Without the Cost of Waste …”
Enterprise Operations Overview & Strategic Planning EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2013 Enterprise Operations Overview.
Baxter Health Care: Strategic Alliance Background Business Process Redesign: Process, IT Lessons Learned.
Logistics Overview.
Quovera Confidential 1 ManagingCustomerConsignmentInventory.
Operations Management $100 Production Method Cost and Revenue Quality Assurance Location Production Planning $200 $300 $400 $500 $400 $300 $200 $100 $500.
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
CONCEPTUAL FRAMEWORK OF AN ABC&M SYSTEM VALUE CHAIN : THE CHAIN OF AN ENTERPRISE’S ACTIVITIES THAT IS PERFORMED TO ADD VALUE TO INPUTS IN ORDER TO ARRIVE.
Case Study 4: Operate a Manufacturing Company (Extension) EGN 5621 Enterprise Systems Collaboration Professional (MSEM) Fall, 2012.
Checking Inventory. Fax IBM PC Mac II PC & Mac Mainframe (UVX 2000) Manual labor Mainframe, Pencil.
Case Study 4: Operate a Manufacturing Company (Extension) EGN 5621 Enterprise Systems Collaboration Summer B, 2015.
Enterprise Operations Overview & Strategic Planning EGN 5622 Enterprise Systems Integration Spring, 2013 Enterprise Operations Overview & Strategic Planning.
How PromoServe can save you at least 25% of your admin costs Andy Barton
Case Study 4: Operate a Manufacturing Company (Extension) EGN 5621 Enterprise Systems Collaboration Fall, 2015.
LEAN Basics for Offices January 13, WHAT IS “LEAN”? Maximize customer value while minimizing waste.
Choosing Lean Manufacturing Presented to you by : Vrunda Consultancy Service, Ahmedabad.
INTRODUCTION TO SUPPLY CHAIN MANAGEMENT. What is a Supply Chain? A supply chain consists of the flow of products and services from: Raw materials manufacturers.
SAP MATERIALS MANAGEMENT(MM) TRAINING IN SOUTHAFRICA,AUSTRALIA
Transportation Waste Definition: the unnecessary act of taking or carrying someone or something from one place to another Office example: Movement of paperwork;
Functional and Enterprise Systems
Materials & Logistics Management
Chapter 22 Procurement Cycle and Documents
The Procurement Process
Chapter 27 Cost Management for Just-in-Time Environments
Multi Channel Sales Order Management: Store
Chapter 7 The Conversion Cycle 1.
Functional and Enterprise Systems
ERP Systems Lecture # 7.
Chapter 16 Lean Accounting
8 Wastes of Lean Waste Over-production Defects Inventory
Manufacturing Planning
MANAGEMENT ACCOUNTING The Activity-Based Costing System based on John G. Burch, Cost and Management Accounting Materials prepared by Ph. D. Zofia Krokosz-Krynke.
Case Study 4: Operate a Manufacturing Company (Extension)
Enterprise Operations Overview & Strategic Planning EGN 5622 Enterprise Systems Integration (Professional MSEM) Fall, 2012.
Case Study 4: Operate a Manufacturing Company (Extension)
Presentation transcript:

Effective Cost Strategies for Manufacturers March 27, 2014

√ What is Lean? o Activity Based Costing (ABC) o Implementing Lean (using ABC) – Case Study o Lean ABC Exercise

o Lean can trace its roots to the Toyota Production System o Came to the United States in the 1980’s (Manufacturing) o Spreading to other Industries, such as construction

o Making too much o Moving o Waiting o Storing Excess Inventory o Over-processing o Fixing mistakes

80%

8 VALUE ADDED NON-VALUE ADDED Inspection Set-up Break-down Batch queues Adjustments …and more Sustaining Tasks Example: Regulatory Authority requirements 80% 5%

o What is Lean? Activity Based Costing (ABC) o Implementing Lean (using ABC) – Case Study o Lean ABC Exercise

Price $$$ Distribution Transportation Accounts Payable Manufacturing Energy Costs Investment Costs Information Support Procurement Material handling Disposal InvisibleCosts Forecasting Inventory management Testing Design criteria Specifications

Count Products Expediting Transport Receiving Grn's Re-pack Inspection Materials Handling Materials Handling Stores Line Stock Point of Use Expediting Multiple transactions Large data bases Large no of Suppliers - Max Re-scheduling Admin Invoice $5 Check Orders/ Schedules/ Changes/ Mrp output Purchase Requisitions Etc Purchasing Accounting

Requisition / mrp Raise purchase order Supplier negotiations Expediting Receiving Inspection Storage and handling Point-of-use Invoice match and payment Price Total Cost

100% 200% 300% Direct Material Costs for Product ‘A’ Direct Labor / Machine Hours for Product ‘A’ Overhead Costs Direct Labor Activity Costs Direct Material Costs $$$$$ $$$$ PRODUCT ‘A’ DEPT #1 DEPT #2 … spread costs over products like peanut butter OVERHEAD COSTS DIRECT LABOR COSTS DIRECT MATERIAL COSTS

PRODUCTS & SERVICES $ OBJECTS X Standard Costing Practices Managing Gross Margin $ £ £ £ £ £ £ £ £ £ £ £ £ £ £ £ £ £ £ £ COSTS ACTIVITIES OBJECTS PRODUCTS & SERVICES CUSTOMERS / CHANNELS Activity Based Costing Managing Profit $ $ $ Activities consume resources

o What is Lean? o Activity Based Costing (ABC) Implementing Lean (using ABC) – Case Study o Lean ABC Exercise

16 Order entry process improvement project Measuring the impact of the Waste in the order entry process BEFORE: 100 orders Receive order Find to Customer data Put in the order data Define shipping type Define special prices <13% perfect order 2%40%35%50%36%  Fax received at reception  sent to the wrong internal address  Customer doesn’t know his customer number  No customer number on the fax  Stock outs  Delivery address different from that in the system  Individual typing for all orders  Price structure isn’t in system VA 33% NVA 57% SNVA 10% Process Mapping

17 sales information file Stapler & punch printouts notes The need to use additional paperwork and “aide memoirs” demonstrates the inability to enter orders right first time, where known information is not held in the SAP system additional Information VA 33% NVA 57% SNVA 10%

18 BEFORE:AFTER: Order entry process improvement project Dramatic reductions in Order Entry times from 60–90% Process Mapping Capacity (orders/day) Warehouse (orders/day until in the warehouse) % 90%

19 More open environment … Faster communication Team motivated Easy to control Elapsed Time (in minutes for one order) BEFORE: AFTER:

20 Warehouse reorganization project Reduction in distance traveled (Spaghetti Diagram) BEFORE: AFTER: Warehouse Activity Based Costs Spaghetti Diagram 20 Receiving /Shipping Small Parcel OfficeOffice Large Customers Small Parcel OfficeOffice Large Customers ReceivingReceiving ShippingShipping

21 Warehouse Reorganization resulted in the following improvements: Analysis of Shipping and Rental Costs and collection of quotes resulted in the following cost savings: WAREHOUSE REORGANIZATION Cost (T DM) Elapsed Time (min/order) FTECapacity (orders/day) Warehouse (orders/day until in the warehouse) % 90%

o What is Lean? o Activity Based Costing (ABC) o Implementing Lean (using ABC) – Case Study Lean ABC Exercise

 By company do a current state process map of the order entry process  Or map out your Warehouse

Questions and Discussion