Tillamook County, OR Flood Study Board of Commissioners’ meeting June 23, 2010.

Slides:



Advertisements
Similar presentations
Flood Map Modernization in North Dakota North Dakota State Water Commission FLOOD MAP MODERNIZATION.
Advertisements

Regulations and Processes for Floodway/Non-Encroachment Area Encroachments. What to look for and what to require. Robert Billings, PE, PH, CFM Mecklenburg.
FEMA PROGRAMS II Session Name: FEMA Programs II Coastal Hazards Management Course Amends the Stafford Act Establishes a Pre-Disaster Mitigation Program.
Flood Damage Prevention Ordinance.  Legal means for communities to set standards for regulating floodplain development  Dependent upon type of mapping.
Levee Decertification & CRS: How a Catch-22 Can Catch You! ASFPM 2011 National Conference Louisville, KY Wednesday, May 17, 2011 ASFPM 2011 National Conference.
 WELCOME  Welcome to the home page for the Louisiana Mapping Project (LaMP). The LaMP effort is being undertaken by Department of Homeland Security’s.
Springettsbury Township STORMWATER AND HOW IT AFFECTS YOU February 19, 2013.
Pierce County, WA DFIRM Update Fife City Hall rd Street East Fife, WA March 18, 2014.
Alabama’s Floodplain Management Program Tom Littlepage Alabama Office of Water Resources.
Federal Emergency Management Agency Map Modernization Project City of Bryan City of College Station & Brazos County, Texas.
Mapping On Demand Federal Emergency Management Agency (FEMA) Map Modernization and the Post-Preliminary Process Escambia County, Florida PDCC Meeting November.
Risk MAP and Discovery FEMA Region [#], [WATERSHED NAME] Watershed Discovery Meetings [DATE]
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
A Simplified Method of Implementing No Rise Analysis in Unnumbered A-Zones Based Upon No Loss of Conveyance Dwayne E. Culp, Ph. D., P.E., CFM Second National.
Flood Risk Mapping Project Identifying the Risk Editorial Board Meeting [COMMUNITY NAME] Flood Risk Mapping Project.
Maine Association of Mortgage Professionals
In coordination with FEMA Scoping Meeting Lake County, California February 19, 2010.
Risk Map Early Demonstration Project Lackawanna County, PA CCO Meeting September 13, 2011.
NC Floodplain Mapping Program North Carolina Floodplain Mapping Program Becoming a Cooperating Technical State.
Flood Risk Mapping Project Editorial Board Meeting [COMMUNITY NAME]
North Carolina Neuse River Basin Plan Final Scoping Meetings April 23, 24, and 25, 2001.
What is a Flood Map? Flood maps are integral part of communities’ disaster and emergency management system. The Federal Emergency Management Agency (FEMA)
Osceola County Floodplain Program
CHAPTER 3 MAPS AND MAP CHANGES
1 Flood Insurance. 2 Flood - History History of the Law –National Flood Insurance Act of 1968 Federally subsidized insurance became available Voluntary.
Creating Depth Grid from a DFIRM FEMA Region VIII Mitigation GIS Team Wednesday, February 13, 2013.
Map Modernization Management Support Best Practices Project - FEMA State of Idaho Idaho Department of Water Resources Boise, Idaho November 2008.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
Prepared by National Flood Services Flood Insurance It’s more than just a lender requirement – don’t get left behind… 1.
Monday, May 2, 2011 W-10 Clarification of Rules and Regulations Presenters: Steve Van Dyke, Tyrone Gregory & Carleathea Greenhill Facilitator: Corise Morrison.
Community Coordination Meeting Hampden County, Massachusetts Review of Preliminary Flood Maps May 31, 2012.
Creating Value … … Delivering Solutions Modeling 72-Miles of the Mississippi on a 2-Mile Budget Mohamed A. Bagha, P.E., CFM Dong Nguyen, P.E., CFM Pradeepa.
FLOOD STUDY Rockland County, NY
Advisory Base Flood Elevations: What Your Community Needs to Know Information for Floodplain Managers and Local Officials.
FLOOD STUDY Oswego County, NY FEMA REGION II February 7, 2011.
National Flood Insurance Program (NFIP) and Map Modernization History and Overview Bill Massey and Sam Crampton Dewberry South Florida Water Management.
Back Creek Floodplain SEPTEMBER 2, Why are we here Introductions Almost 300 parcels affected by revised flood study of Back Creek Outline ◦History.
North Carolina White Oak River Basin Plan December 19, 2000.
US Army Engineer Research and Development Center COASTAL OUTREACH ADVISORY TEAM Kick-off Meeting November 19, 2010 FEMA Region III Coastal Mapping Project.
Resilience Meeting: [Watershed Name] [LOCATION] [DATE]
Flood Map Modernization June 11,  Obtain Best Available Data  Develop Partnerships for Production that Enhance Capability (local, state, fed)
Office for Information Resources GIS Services Flood Map Modernization and the Tennessee Base Mapping Program Dennis Pedersen, Director F&A, OIR – GIS Services.
Ventura County Levee Systems Levee Certification Compliance Efforts Presentation to the Ventura County Watershed Protection District Board of Supervisors.
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting October 2005 HILLSBOROUGH COUNTY FLOOD MAP MODERNIZATION V
Flood Map Modernization Flood Map Modernization Mapping the Risk Editorial Board Meeting [date] V [COMMUNITY NAME] FLOOD MAP MODERNIZATION.
North Carolina Tar-Pamlico River Basin Plan Final Scoping Meetings January 30 and 31, 2001.
Flood Map Modernization and North Dakota Julie Prescott, ND Map Modernization Coordinator North Dakota State Water Commission And Brian Fischer, CFM, GIS.
North Carolina Pasquotank River Basin Plan Final Scoping Meetings May 17 and 18, 2001.
Passaic County, NJ Initial Coordination Meeting FEMA Region II Mitigation Division October 6th, :00-11:00.
Prepared by: Burnham – Floodplain Study October 23, 2009 Presented by: Marty Spongberg, PhD, PE, PG AMEC Geomatrix, Inc.
In coordination with FEMA Kickoff Meeting Ventura County, CA April 29, 2010.
A Great L-EAP Forward: Successes and Challenges in Implementing FEMA’s Expanded Appeals Process Todd Steiner FEMA Maggie Mathis, CFM RAMPP.
1-Day of 2-D How Are The Results Of Hydraulic Models Used To Manage Floodplain Development Under The NFIP? Eric Simmons, FEMA Region IX.
Polk County Preliminary Digital Flood Insurance Rate Maps City of Windsor Heights Public Meeting Polk County Preliminary Digital Flood Insurance Rate Maps.
FLOOD STUDY Burlington County, NJ FEMA REGION II November 29, 2010.
FEMA Terms (Last updated July 25, 2006) The Acronyms  NFIP – National Flood Insurance Program  FIRM – Flood Insurance Rate Map  SFHA – Special Flood.
4.0 Unit 4: BFE Considerations. 4.1 Objectives At the end of this unit, you should be able to:  List potential data sources for determining BFEs in A.
Preliminary DFIRM Community Coordination (PDCC) Meeting Dixie County, FL February 10, 2016.
Polk County Preliminary Digital Flood Insurance Rate Maps City of Clive Public Meeting Polk County Preliminary Digital Flood Insurance Rate Maps November.
Osceola County Floodplain Program Jennifer Nicholson, CFM Picture credit: Osceola Historical Society.
City of Stockton Levee Flood Protection Status Report January 29, 2008 Agenda Item 4.03.
Preliminary DFIRM Community Coordination (PDCC) Meeting Hamilton & Suwannee Counties, FL February 8, 2016.
Prince George’s County Flood Forum March 23, 2017
2007 Flood Insurance Rate Maps
Coos County Risk MAP STUDY
Flood Damage Prevention Code Update
Flood Hazard Area, Flood Insurance and Stormwater Management
North Carolina Lumber River Basin Plan
Risk MAP & the Little River Basin
<<County Name>> <<Date>>
Presentation transcript:

Tillamook County, OR Flood Study Board of Commissioners’ meeting June 23, 2010

AgendaAgenda National Flood Insurance Program (NFIP) Map Modernization Program Tillamook County Flood Insurance Study (FIS) Review Map Adoption Process

Purpose of the NFIP Maps the flood risk and assign insurance rates (FIRMs) Makes flood insurance available Sets minimum floodplain construction standards Reduces dependency on structural flood control Promotes floodplain management practices Reduce economic loss caused by flood events

NFIP Facts 5.6 million flood insurance policies 20,532 participating communities $1.2 trillion in flood coverage Nationally...

How the NFIP Works Three disciplines of the NFIP: Mapping – Flood Studies Regulations Insurance

Flood Studies FIS creates maps that show Special Flood Hazard Areas (SFHA); base (100-yr) floodplain FIS sets flood insurance rates per the maps Lenders must require flood insurance in the 100-year floodplain for Federal-related loans FIS provides communities with data to enforce their ordinances Study Report: Describes flood history, principal flood problems, flood protection measures, hydrology and hydraulic methods, floodway data tables, water surface profiles Flood Insurance Rate Map (FIRM): Shows floodplain limits, base flood elevations (BFEs), floodways, surveyed cross sections, corporate limits, roads, insurance zones

Flood Insurance Rate Maps (FIRM) Who uses the FIRM? Local Jurisdictions - Community Officials - Building and Zoning Departments - Economic Development - Planners - Emergency Managers Lending Institutions Surveyors & Engineers Builders/Developers Insurance Agents Property Owners State and Federal Agencies

When Will it Flood? Flood Frequency % chance over Years Chance in any Year 30 yr mortgage out of % 502 out of % out of % out of 100 6%

Base Flood A flood that has a 1% chance of being equaled or exceeded in any given year. Base Flood Elevation (BFE) - the elevation that the base flood is expected to reach. Base Flood = 100-year flood

What is Map Modernization? Through Map Modernization… …FEMA will provide digital flood insurance rate maps and studies… …for communities nationwide… …that are more accurate, easier to use, and more readily available.

Why Modernize? Outdated maps (10+ years old) Physical changes in floodplains – man-made and natural Digital format enables overlays/analysis Easier to update maps Maps are foundation for flood risk reduction and insurance (5.6 million policies, 1.2 trillion coverage)

Tillamook County Flood Study Details Contractors: WEST Consultants, Inc., & Michael Baker Jr., Inc. FEMA Funds: $520,000

Tillamook County Preliminary FIS: December 31, 2009 Pre-Scoping Report – January 2006 Establish Community Contacts, Retrieve Data (models, LOMRs, needs), Level of Study, Available Base Map Data Scoping Meeting – March 11, 2006 Discuss proposed scope of work, identify available data and update needs, 14 Attendees (FEMA, County, Cities of Tillamook and Garibaldi, State, USACE, WEST) Large Flood Event – November 6, 2006 – Wilson River near Tillamook - 38,600 cfs vs FIS 100-year – 36,300 cfs Large Flood Event – December 3, 2007– Wilson River near Tillamook – 33,100 cfs History

Scope of Work Re-assess hydrology If not within tolerance, evaluate effects on the BFE Re-delineate floodplain extents along reaches where we obtained newer topography and aerial photos Refine floodplain boundaries Digitally convert effective FIRMS –All effective panels, except for detailed re-study of Miami, Kilchis, Wilson, Trask and Tillamook Rivers

Hydrologic Assessment Wilson/Trask/Tillamook hydrology modified because of large floods in 2007 and 2008 Kilchis hydrology unchanged (within 2% of effective) Miami 100-year hydrology increased from 6,600 cfs to 9,550 cfs based on flood frequency analysis

Hydrologic Assessment Location Drainage Area (square miles) Frequency 2008 FFA Computed Discharge (cfs) 2002 FIS Discharge (cfs) Discharge Confidence Limits 25- percent 75- percent Gage Wilson River near Tillamook, OR through Year28,50029,70027,40025, Year37,60039,70035,80033, Year 41,400 43,90039,300 36, Year50,20053,80047,20043,500 Trask River 100-year Flow went from 27,400 to 33,500 CFS

FloodwayFloodway Area where water velocities and depths are the most destructive Defined as the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height (1 foot).

FLOODWAY SCHEMATIC 100 YEAR FLOODPLAIN SURCHARGE FLOODWAY FLOODWAY + FLOODWAY FRINGE = 100 YEAR FLOODPLAIN SURCHARGE NOT TO EXCEED 1.0 FEET

Hydraulic Model Based on Corps flood reduction model (2004) –Cross sections from a variety of sources (County, previous FEMA, and Corps surveys) –Sections extended the overbanks using 2-ft topo from late 1999 –Calibrated to events in Nov. 1999, May 2001 and Nov Some modifications to: –Expand the sections to contain the 0.2% flood –Fix split flow in SW part of model

Floodway Development Lower Trask River and Tillamook River did not have defined floodways Wilson River floodway needed updating to new hydrology and hydraulics Initially “adopted” effective floodways –Worked for upper Wilson and Trask, but not downstream Floodplain and floodway mapped to 2-ft contours

DFIRM Conversion Reaches Detailed Study – Approximately 80 miles Distance (mi) Nehalem Bay 4.0 Nestucca Bay3.7 Nehalem River15.1 NF Nehalem River5.2 Nestucca River16.0 Three Rivers4.9 Wilson River4.3 Pacific Ocean28.4 DFIRM Conversion of 28 FIRM and 7 FBFM Panels

New maps are county-wide Follows a USGS Quad layout – countywide coverage with no city “cut-outs” Contains 100- & 500-year floodplains (AE/X zones) 10, 50, 100, 500 year flood elevations published Re-delineation of flooding sources where better topography was available Vertical Datum change (NGVD 1929 to NAVD 1988) What’s new Flood Insurance Study

What’s new Vertical Datum Change NGVD 29 –Based on a mean sea level from 21 tidal stations in the US & 5 stations in Canada NAVD 88 –Based on the density of the Earth instead of varying values of sea heights –More accurate Conversion for Tillamook County Varies –NGVD + (vertical adjustment’) = NAVD –Conversion factor for County for FIS is 3.54 feet

Digital Flood Insurance Rate Maps Vertical Datum and FIRMs (e.g. uses 3.54’ conversion) NGVD 29NAVD 88 BFE = 5.54 ft BFE = 2 ft

Digital Flood Insurance Rate Maps Digital Format Aerial Imagery Elevation Geodetic Control Boundaries Surface Waters Transportation Land Ownership Special Flood Hazard Areas

Apply local parcel and topo layers… Digital Flood Insurance Rate Maps

Zone Designation Changes Old FIRMsNew FIRMsDefinition AAApproximate Floodplain (SFHA) A1- A30AEDetail River Floodplain (SFHA) A99 Protected by Levee AH Shallow Floodplain with BFE AO Shallow FP without BFE BX (shaded)500 Year Floodplain CX (un-shaded)Outside 500 Year Floodplain DDUndetermined Floodplain VVApprox Coastal Floodplain V1-30VEDetailed Coastal Floodplain

AE Zone X Zone (shaded) Floodway Digital Flood Insurance Rate Maps FIRM Labels

Digital Flood Insurance Rate Maps Some new labels on dFIRMs look like this… X (Un-shaded ) X (Shaded) (500-year) Floodway A & AE Zones SFHA (100-year)

Tillamook County Adoption Process

Post PreLiminary Processing Post PreLiminary Processing Timeline of events Preliminary maps issued ……… Hold Coordination Meeting …… Public Meeting …………………… day appeal period begins ……... after 2 nd public notice in local newspaper 90-day appeal period ends …… FEMA reviews submitted technical appeals and modifies or maintains maps as appropriate FEMA issues “Letter of Final Determination (LFD)” ………………………... to communities and publishes the BFEs in the Federal Register Communities have 6 months to adopt the study before the data becomes “effective”. Failure to adopt results in suspension from NFIP Effective date …………………………… December 31, 2009 March 31, 2010 May 12, 2010 e.g. June 15, 2010 e.g. September 15, 2010 Est. December, 2010 Est. June, 2011

AppealsAppeals 44 CFR 67.6A – The sole basis of appeal under this part shall be the possession of knowledge or information indicating that the elevations proposed by FEMA are scientifically or technically incorrect. Because scientific and technical correctness is often a matter of degree rather than absolute (except where mathematical or measurement error or changed physical conditions can be demonstrated), appellants are required to demonstrate that alternative methods or applications result in more correct estimates of base flood elevations, thus demonstrating that FEMA's estimates are incorrect.

AppealsAppeals Signed Letter with Backup Technical Information Mail to: STARR - Region X Support Center 901 Fifth Avenue, Suite 3100 Seattle, WA Informal Comments not needing a response: Questions: Phone: ext. 2225

CommentsComments #1– Floodway crosses across school despite the entire area uniformly being raised 10 feet above river bank. Can the floodway be adjusted to not include school since it looks like it would either convey over the entire area or not at all? Backup Documentation – Zoomed in map of area, address topography #2 – Area has flooded numerous times in the past. Why is it mapped as dry? Backup Documentation – Zoomed in map of area, address, photos, topography

Comments Not Able to Address #1 - My house has never flooded in xx number of years, why am I being shown wet? Problem – The 100-year flood is generally larger than recent floods. We need technical information that shows the calculations are incorrect (flow, stage, topography) #2 - There is newer topography since you started the study. Please redo study to newer topography. Problem – Too expensive and time-consuming and would never be able to complete a study. Not a valid appeal by definition.

Letters of Map Change (LOMC) (ways to appeal at any time) LOMA - for property owners who believe a property was incorrectly included in a SFHA. An elevation certificate supports a LOMA, but by itself, does not remove the insurance requirement. LOMR – removes land that has been graded or filled (physical changes) since the date of the map. A LOMR can waive flood insurance requirements. (LOMA) Hotline FEMA-MAP

Future Steps after Appeal period ends FEMA addresses submitted comments Local jurisdictions adopt an ordinance that is compliant with your map and FEMA standards Local jurisdictions develop and implement outreach strategies, if desired. Upon receipt of LFD, local jurisdictions begin enforcing the maps

Letter of Final Determination (LFD) Letter of Final Determination (LFD) Starts with the Letter of Final Determination (LFD) stating that the Appeals have been resolved, if applicable Officially notifies community of final base flood elevations Indicates effective date of FIRMs as 6 months from the date of the letter Ordinance meeting FEMA regulations MUST become effective by end of 6 months or community will be suspended