January 2013 BIM the cost of sustainability BIM And the cost of sustainability Delivering sustainability.

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Building Information Management (BIM)
The Future in BIM Integrated Project Delivery Where’s the engagement in BIM gone?? BIM Proprietary Design CAM Fabrication Perceived to be too complex.
Enabling you for BIM (Building Information Modelling)
BIM EXECUTION PLANNING PROCESS
Financial Management F OR A S MALL B USINESS. FINANCIAL MANAGEMENT 2 Welcome 1. Agenda 2. Ground Rules 3. Introductions.
Platinum Energy, Inc. Slide No. 1 PROJECT EVALUATION Joseph A. Orlando, Ph.D, PE Platinum Energy, Inc. Springfield, Virginia
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
TM The Nation’s Local Builder TM. The Nation’s Local Builder TM The Brief “how taking a collaborative and Lean approach to delivering projects working.
RIBA Plan of Work 2013.
06/06/07 – 07/11/07 BIM Building Information Modeling.
EMPA Forum 2015 Workshop 3 - Endeavour BIM (Building Information Modelling) (2nd Lesson) & Using Augmented Reality February 2015.
BIM Me Up, Scottie! The Next Generation in Construction Technology.
The countdown to 2016: Your action list to be ready
Dan Rossiter BIM Team, BRE Wales 26th of September, 2014
Building Information Modeling
David Warne Independent Manufacturing Consultant.
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Introduction to BIM BIM Curriculum 01.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
Construction Category Management Planning Version 1.1 (May 2015)
Oncor Electric Delivery Oncor Electric Delivery Restructure An Engineering & Construction Perspective SWEDE Conference May 11, 2007 San Antonio Mark Burt.
Change Management “Getting from where you are, to where you want to be”
Bill Harrison New Jersey Chapter February 3, 2009.
The BIM Toolkit Stephen Hamil – March 2015 – v2.0.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
Application of Integrated Methodology Multicriteria Building Energy Analysis using Models of Dynamic Energy Simulation Unique Perspectives in bioclimatic.
Albert Young – University of Glasgow Allan Crooks – Carbon Trust Case Studies.
Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
INFORMATION Information Packs, Construction Phase Plans and Health and Safety Files.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
T172 Tutorial 2. Maths Day school for Technology Students Saturday 27 March Regional Centre, Manchester (Details to be sent in post) The day school clashes.
The Influence of BIM on Quantity Surveyors Presented by: Syukri Zulkipli Alex Lim.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
FACILITIES PLANNING INTRODUCTION Form Follows Function Form and function should be one, joined in a spiritual union.
SEE Energy Poverty Nexus Aleksandar Kovacevic. 2 Concept of Affordable Energy compromises: Total social costs of energy that could be covered by productivity.
Global construction consultants SPENDING WISELY Laurence Brett Partner Davis Langdon LLP.
Process Room Deke Smith, FAIA Executive Director - buildingSMART alliance Member - Executive Committee buildingSMART International.
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOT 7 – CAPITAL WORKS.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
© 2009 Bentley Systems, Incorporated Intermediate Status Dec 8, 2009 FM Handover Aquarium (COBie2)
Solving the Energy Puzzle Understanding the Rules of Energy Delivery Electricity Natural Gas Tariffs Solar Combined Heat and Power Generation Distribution.
BIM & FM in Hong Kong Public Rental Housing Projects.
EcoDomus PM Data Management Igor Starkov President EcoDomus, Inc.
BEST East – Introduction Developing the capability to deliver more with less Neil Jarrett CWC.
Page 1 / DI Martin Moesl, M.A. Univ. Prof. DI Dr. Arnold Tautschnig Determining and controlling of the Life-Cycle-Yield in an early planning.
The NBS BIM Toolkit Dr Stephen Hamil – Director of Design and Innovation.
Dana K “Deke” Smith FAIA Birgitta Foster Executive Director Assisting Director buildingSMART alliance 1.
DESIGN TOOLS UPDATE.
The Design Team Carl James.
7D 6D 5D 4D 3D bIM Dimensions bIM Services ESTIMATING
BIM EXECUTION PLANNING PROCESS
Beck Technology Innovation in all Dimensions.
EXTRA SLIDES.
RIBA Plan of Work 2013.
Standards for success in city IT and construction projects
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
BEEP Integrated Design Process for Energy Efficient Buildings
BIM EXECUTION PLANNING PROCESS
The Challenges of Building Information Modeling (BIM)
Michelle Papayannakos
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Dominant Improvements of BIM Modeling Services and Building Information Modeling Firms BIM Modeling Services Building Information Modeling Firms.
Project delivery RIBA stages Define design deliver Key Objectives 1 2
RIBA Plan of Work 2013.
Presentation transcript:

January 2013 BIM the cost of sustainability BIM And the cost of sustainability Delivering sustainability

January 2013 BIM the cost of sustainability Introduction This is a case study of a PassivHaus primary school that has been collaboratively designed, built and operated. For a modest capital investment PassivHaus generates very low: Power consumption kW Utility bills (revenue costs)£ Carbon emissionsCO 2 The tools required include: Collaboration Benchmarking Life cycle cost Building Information Modelling Facilities management

January 2013 BIM the cost of sustainability Collaboration QS Main contractor Client Sub contractor FM ArchitectStructuralMEP PM

January 2013 BIM the cost of sustainability Design, Build, Operate

January 2013 BIM the cost of sustainability BIM Collaboration Information is added to the same model as the design progresses. The coordinator can merge the separate files by converting to IFC “common” file format The Design & Build contractor can add supply chain information The client owns the completed BIM and amends with refurbishment and adaption Data enrichment Main contractor Client Specialist sub contractor FM ArchiCad Architecture TEKLA Structural Bentley Systems MEP Quantity extraction

January 2013 BIM the cost of sustainability Benchmarking

January 2013 BIM the cost of sustainability Benchmark: Capital The Cabinet Office has published benchmarks Secondary school of 8-10,000 m² is average £ 2,158/m² This school (Primary) 2,400m² £ 2,077/m² “More for less” “Good is good enough” 20% savings in capital cost “More for less” “Good is good enough” 20% savings in capital cost

January 2013 BIM the cost of sustainability Benchmark: power, revenue and carbon CIBSE has produced benchmarks for power consumption and carbon emissions. Schools and seasonal public buildings Previous school F 260 kW/m² AverageD 190 kW/m² TargetB 120 kW/m² (less than half) Utility cost per annum£11,000 (previous £27,000) Carbon emissions73 tCO 2 (previous 190)

January 2013 BIM the cost of sustainability Life cycle cost Capital Maintenance Replacement Operation

January 2013 BIM the cost of sustainability Framework “J” curve With a framework the supply chain can afford to invest, gain experience and improve

January 2013 BIM the cost of sustainability Cost benefit analysis Capital cost Project 12%(+) £108,000 Project 21%(+) £54,000 Project 30%(+) £0 Revenue savings power consumption (-) 120 kW/m²pa Utility bills (-) £16, k Carbon emissions(-) 105 tCO t Payback 8,4,0 years

January 2013 BIM the cost of sustainability Building Information Model

January 2013 BIM the cost of sustainability Building Information Models

January 2013 BIM the cost of sustainability 3D, 4D and 5D 3D AArchitecture SStructural MEMechanical Electrical and Plumbing 4D W+TIME planning and construction simulation 5D Q+COST (Capital, life cycle & FM)

January 2013 BIM the cost of sustainability Benefits All information in one fileCo-ordinated collaboration VisualisationHigh level reporting to management Clash detectionSolving problems before site Building performanceDaylight, heat loss, reverberation Standard component libraryCreate a standard specification Lean construction economies of scale Standard format for dataReuse and transfer of information Client operational dataRefurbishment / adaption / space planning

January 2013 BIM the cost of sustainability Click on “Family” for Information including length, area and volume. “Family” information

January 2013 BIM the cost of sustainability “Family” additional parameters +QS, PM, BS and FM data Capital rates Life cycle cost (anticipated life expectancy) Carbon reduction Capital allowances Programming and phasing Building reinstatement cost Health & safety Client accountancy coding Asset registers Trade package coding Risk management Facility management planning Material scheduling

January 2013 BIM the cost of sustainability “Family” design options and level of detail “Level of detail” 1 Concept 2 Schematic 3 Technical Alternative> Doors: Timber, metal, glass etc. Boiler: Biomass, Gas, CHP.

January 2013 BIM the cost of sustainability Revit plus Designers Cost, time and carbon Revit file (*.rvt) ObjectPositionFloorX (m) Y (m) Z (m) TrussA:A AHUA:A DoorB:B1: ObjectRate £ Life Years Material Truss50070Steel AHU100015Copper Door30045Hardwood Supply chain Family files (*.RFA) Architect Structure M&E QS & PM Application Programming Interface (API) Revit Program SQL Database

January 2013 BIM the cost of sustainability RLBIM API “add in” x

January 2013 BIM the cost of sustainability RLBIM: import RLB database RLBIM External database (NRM description library). OUTSIDE of Revit but accessible from within Revit. The “primary key” is the same assembly code as used within Revit RLBIM External database (NRM description library). OUTSIDE of Revit but accessible from within Revit. The “primary key” is the same assembly code as used within Revit

January 2013 BIM the cost of sustainability Capital cost plan in Revit And Elemental Breakdown

January 2013 BIM the cost of sustainability RIBA plan of works: COBie drops ArchitectureStructuralMEP 12 Appraisal Design brief Preparation Concept Design development Technical design Design Production information Tender documentation Tender action Pre-construction Mobilisation Construction Post completion Operation RIBA Plan of WorksAB CDE FGH JK L Cobie drop Contractor Owner 435 QS COBie 3D Design ConstructionOperationsBuildingInformationExchange

January 2013 BIM the cost of sustainability Conclusion

January 2013 BIM the cost of sustainability Summary Delivering sustainability from start to finish in a cost-effective way A holistic approach to capital and revenue Collaboration Building Information Modelling Life cycle cost planning Benefits: Economies of scale and standardisation-£ Lower power consumption -kW Lower utility bills (revenue costs)-£pa Lower Carbon emissions-CO 2 “More for less” “Good is good enough” 20% savings in capital cost “More for less” “Good is good enough” 20% savings in capital cost

January 2013 BIM the cost of sustainability Delivering sustainability RLB.com