– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd 2010 1/21 GTK COOLING: STATUS OF THE MICRO-CHANNEL OPTION Paolo.

Slides:



Advertisements
Similar presentations
LCFI Collaboration Status Report LCWS 2004 Paris Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, RAL.
Advertisements

Low material budget microfabricated cooling devices for particle detectors P. PETAGNA and A. MAPELLI On behalf of: CERN PH/DT The NA62 Collaboration EPFL.
122 Nov GTK Microchannel Cooling Hydraulic simulation with Rectangular Manifold Enrico Da Riva, Vinod Rao CERN (EN/CV/DC) 22 th Nov 2011 E. Da Riva,
Mechanical Status of ECAL Marc Anduze – 30/10/06.
GTK WG Meeting May 24 th 2011 Status of Microchannel Cooling - Paolo Petagna 1/9 PH-DT Status of Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
GTK Cooling Summary of frame and cooling plate Shear tests Alessandro Mapelli Michel Morel Jerome Noel Georg Nüßle Paolo Petagna Giulia Romagnoli GigaTracKer.
GTK WG Meeting April 5 th 2011 Update on Microchannel Cooling - Paolo Petagna 1/15 PH-DT Update on Microchannel Cooling J. Daguin (CERN PH/DT) A. Mapelli.
Novel technologies and materials for thermal management
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
DT Steering Board Meeting - April 30 th 2010 WP 11: Detector Cooling - Paolo Petagna 1/19 PH-DT WP 11: DETECTOR COOLING Outline of the Talk WP mandate.
Pressure Tests Results 13/03/2013Collaboration meeting CERN - CSEM1.
Micro-channel CO 2 cooling for the LHCb VELO upgrade. R. Dumps, J. Buytaert, A. Mapelli, P. Petagna, B. Verlaat CERN A. Nomerotski Oxford University September.
NA62-GTK special meeting on cooling options
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
20 th June 20111Enrico Da Riva, V. Rao Project Request and Geometry constraints June 20 th 2011 Bdg 298 Enrico Da Riva,Vinod Singh Rao CFD GTK.
, T. Tischler, CBM Collaboration Meeting, Split Status MVD Demonstrator: System Integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Low mass carbon based support structures for the HL-LHC ATLAS pixel forward disks R. Bates* a, C. Buttar a, I. Bonad a, F. McEwan a, L. Cunningham a, S.
Material Measurement Laboratory Cryogenic Engineering Conference :45 AM Single-phase ambient and cryogenic temperature heat transfer.
Thermal & Mechanical Support for Diamond Pixel Modules Justin Albert Univ. of Victoria Nov. 6, 2008 ATLAS Tracker Upgrade Workshop.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
Meeting with TUM 1/5/2016P. Petagna – LHC Detector Upgrades: Cooling Visit of the President of the Munich Technical University LHC DETECTOR UPGRADES: COOLING.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Thermal Model of Pixel Blade Conceptual Design C. M. Lei 11/20/08.
Considerations on integration, mechanics and cooling R. Santoro, D. Perini ITS Upgrade plenary meeting, 29-May 2011.
Microchannel cooling Alessandro Mapelli CERN PH-DT EPFL-LMIS4 Reporting on behalf of D. Bouit, J. Daguin, L. Kottelat, J. Noel, P. Petagna – CERN PH-DT.
Report on testing Snake2 u-channel. P. Jalocha & J. Buytaert. 8 June 2015.
Multi-Microhannel Cooling Model Silicon Micro-Cooling Element to be applied on a pixel detector of CERN (ALICE) / Parametric Study Footprint area: (6.0.
PH-DT FLUIDIC SYSTEM 1 ST SECTION MEETING 19 NOVEMBER 2015.
Dummy Modules The next step is to build and test 10 thermal modules for tests and distribution. What do we want to test? Thermal performance and variation.
Microfluidic Cooling for Detector and Electronic OUTLINE: Motivations for micro-channel cooling in HEP Micro-technologies involved First possible HEP cases:the.
Pixel upgrade test structure: CO 2 cooling test results and simulations Nick Lumb IPN-Lyon MEC Meeting, 10/02/2010.
CO2 Cooling For the CMS Pixel detector 11 November 20081Hans Postema & Antti Onnela.
Perspectives for ILC Si-Tracker mechanics work at Oxford aka It’s looking grim unless … PS: This is an individuals view 19/06/2014 2nd Oxford Strategy.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
Microchannel Cooling D. Bouit, J. Daguin, A. Jilg, L. Kottelat, A. Mapelli, J. Noel, P. Petagna, G. Romagnoli – CERN PH-DT K. Howell – Georges Mason University.
1 1F.Bosi, M.Massa, SuperB Meeting, Isola d’Elba, May 31, 2008 Update on Thin Mechanics/Cooling R&D for the Layer 0 of the SuperB Factory F. Bosi - M.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
GTK Controls and Safety Thermal results with the ceramic heater Kaitlin Howell, Georg Nüßle, Paolo Petagna,
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
F.Bosi, M.Massa, 11 th Pisa Meeting on Advanced Detectors, May 2009 Development and Experimental Characterization of Prototypes for Low Material.
For the CMS Pixel detector
WP9 (NA8) PARALLEL MEETING AOB: (Apr 4th 2017)
Microchannel cooling - Update
The CSOI approach for integrated micro channels
Micro-channel Cooling
Hybrid Pixel R&D and Interconnect Technologies
SILICON PIXELS DETECTOR
Update on WG4 A.Tauro - R.Santoro 11/10/11 ITS upgrade meeting.
ALICE PD group meeting Andrea Francescon.
Microfluidic devices for thermal management
3D-Printed Connectors Timothée Frei
detector development readout electronics interconnects bump bonding
2S module geometry updates Module positioning concepts
WG4 – Progress report R. Santoro and A. Tauro.
2th EuCard Col/Mat WP Meeting
The Stave Thermo-Conductivity QC Procedure Idea
Detector Technology Group
CO2 Cooling IPNL Nick Lumb, 28/01/09.
Tests on a dummy facet of PIX upgrade using CO2 cooling
Preliminary control integration
For the CMS Pixel detector
Presentation transcript:

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /21 GTK COOLING: STATUS OF THE MICRO-CHANNEL OPTION Paolo Petagna (CERN, PH/DT) On behalf of:Jérôme DAGUIN Raphael DUMPS Alessandro MAPELLI Jérôme NOËL Georg NÜßLE Paolo PETAGNA

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx SUMMARY Perspectives for µ-channel cooling in HEP The proposed approach for the NA62 GTK Status of the R&D Next steps MAINLY “WORK IN PROGRESS”

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx WHY µ-CHANNEL COOLING NOW? Example: CMOSAIC project run by EPFL (2 labs), ETHZ (2 labs), University of Madrid, Boston University, IBM Zurich. CERN Presently discussing scientific partnership

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx FUTURE POTENTIAL APPLICATIONS IN HEP Very low X 0 layers for SHLC pixel detectors; “Trigger Layers” (first-level trigger) in SHLC Trackers ILC/CLIC detectors First potential target candidate: NA62 GTK

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx WHY TARGETING THE NA62 GTK? 1.Extremely aggressive X 0 specifications 2.Test case for the integration with electronics 1.Simple “system configuration” (3 independent modules) 2.Allows for concentrating the efforts on local thermal management

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx “STEP 0”: CREATE A NETWORK OF COLLABORATIONS EPFL – LMIS4 collaborating now on  -fabrication EPFL – LTCM collaborating now on  -fluidics + heat & mass transfer UCL – ELEC/DICE (SOI & MEMS) discussing possible collaboration VTT let us know their interest through PH/ESE: need to contact them IBM Research – Zurich Personal contact with B. Michel + CMOSAIC SLAC Developing in this moment a very similar line of R&D

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx PROPOSED PROCEDURAL MATRIX 500  m Pyrex 500  m Si 500  m Pyrex 500  m Si 500  m Pyrex 300  m Si 50  m Si (thinned) 100  m Si (thinned) Fluid distribution / recollection Channel optimal size Heat transfer from chips/sensor Temperature uniformity Silicon on Silicon bonding Pressure issues Handling issues C 6 F 14 vs. CO 2

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx CFD SIMULATIONS AT EPFL – 1: CHANNEL GEOMETRY J. Thome et al. Two-Phase Cooling of Targets and Electronics for Particle Physics Experiments, TWEPP 09, Paris, Sep x 50  m section

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx CFD SIMULATIONS AT EPFL – 2: C 6 F 14 VS. CO 2

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx µ-CHANNEL PROTOTYPES PRODUCED - 1

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx µ-CHANNEL PROTOTYPES PRODUCED - 2 Pyrex 500 µm Silicon 500 µm Anodic Bonding

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx IDEAS FOR FLUID DISTRIBUTION/RECOLLECTION – 1: “CLAMP” SYSTEM Bulky Complex integration with electronics Holds pressure in the manifolds Allow immediately for thermo- fluid studies Size and mass can be reduced

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx IDEAS FOR FLUID DISTRIBUTION/RECOLLECTION – 2: NANOPORT ® CONNECTORS Lighter Easy integration Preferred choice

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx IDEAS FOR FLUID DISTRIBUTION/RECOLLECTION – 3: PRESSURE TESTS OF NANOPORT ® CONNECTORS Requires careful design and test of fluid distribution / collection

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx TEST SET-UP FOR C 6 F 14 COOLING: P&I

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx TEST SET-UP FOR C 6 F 14 COOLING: PREPARATION

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx FIRST TEST SET-UP FOR CO 2 COOLING: AVAILABLE PRESSURE GAUGE METERING VALVE OPTIONA L CAPILLAR Y TUBE DETECTOR TUBE WITH ELECTRIC HEATING MASSFLOW METER CO 2 BOTTLE WITH PLUNGER CONCENTRIC TUBE HEAT EXCHANGER VENT TO ATMOSPHER E PROPORTIONAL RELIEF VALVE WATER BATH HEATER

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx THERMAL CONTACT STUDIES PRESENT BENCHMARK: ME7159 by AI Technology (USA) diamond-loaded epoxy glue with thermal conductivity11.4 W/mK R&D contract in preparation with CNR Italy (Institute for Composite and Biomedical Materials): Study of thermal conductive adhesives obtained by doping Araldite 2011 and Silicone VRT Carbon Nano-Tubes Diamond Nano-Powder Metal Nano-Wires

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx NEXT STEPS Tackle integration problems (towards electronics and towards outside) Start C6F14 studies – room temperature Continue C6F14 studies – low temperature Proceed with Silicon on Silicon bonding technique Start CO2 studies Move towards thinned assembly

– GTK Working Group Meeting – GTK Cooling: Status of the Micro-Channel Option Feb 2 nd /xx LONG TERM: A POSSIBLE FUTURE EVOLUTION? ? But a rational approach is to move step by step towards intermediate useful objectives…