GE MyFleet Persona Template. 2 GE Internal 2 Control Room Operator Glen H, Control Room Operator, Inland Empire Energy Center The primary focus of my.

Slides:



Advertisements
Similar presentations
BALANCING LIFES ISSUES, INC. Managing Multiple Priorities at Work.
Advertisements

SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Welcome to the Award Winning Easiest to Use & Most Advanced View, Manage, and Control Security, Access Control, Video, Energy & Lighting Systems, & Critical.
Value Now: Off-the-Shelf Operational Visibility in ProcessBook and RtPortal Data South Systems and Dominion Power.
Disaster Recovery Planning Because It’s Time! Copyright Columbia University and Bentley College, This work is the intellectual property of the author.
Learning Objective : Today we will review follow multiple step instructions in a basic technical manual.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
VALUE NOW: Using PI Data to Improve and Optimize Process Control John Cunningham The RoviSys Company.
1 Corporate Capabilities. Adayana was founded in 2001 to improve human capital performance Our clients come to Adayana to help improve their people’s.
Spatial Hypermedia and Augmented Reality
1 SWE Introduction to Software Engineering Lecture 3 Introduction to Software Engineering.
Fun with PowerPoint June 8, Presentations content formatting delivery.
Syringe Robot Arm (SRA)
Lawson System Foundation 9.0
Activity 1 - WBs 5 mins Go online and spend a moment trying to find out the difference between: HIGH LEVEL programming languages and LOW LEVEL programming.
CPMT 1449 Computer Networking Technology – Lesson 1
Front Page …..is an Asset Management tool designed to record and aid the analysis of activities affecting Production capability and costs. …..promotes.
Systems Life Cycle A summary of what needs to be done.
How Do I Find a Job to Apply to?
StressChill App Click the StressChill icon (shown to the right) to open the app. If you do not see this on the desktop, you will find it in the pull up.
Student Training Presentation. The primary purpose of PARCC is to provide high quality assessments of students’ progression toward postsecondary readiness.
PROGRAMS MONITORING AND SUPERVISION
Useful Techniques in Teaching Reading
Take a minute… Think about the people that your work with.
RtReports in Action Barry Higgins Automation & Control Engineer.
Michael Margel Dec CSC 2524 SURFBRD. What is SURFBRD? SURFace-Based Remote Desktop Pronounced “Surfboard” A desktop environment that allows users.
11 SECURITY TEMPLATES AND PLANNING Chapter 7. Chapter 7: SECURITY TEMPLATES AND PLANNING2 OVERVIEW  Understand the uses of security templates  Explain.
1 ● Plant Automation Security Review of Cyber Security Attack at Maroochy Water Services ● Bradley Yager ● National Business Development Manager – Telemetry.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
Personal Safety Unit - Level 7. The Internet is not anonymous. Your address, screen name, and password serve as barriers between you and others.
© Grant Thornton | | | | | Guidance on Monitoring Internal Control Systems COSO Monitoring Project Update FEI - CFIT Meeting September 25, 2008.
Student Training Presentation. On Wednesday, April 8, all juniors will take the Standards Based Assessment (SBA) in Science. This is part of the testing.
PI – An Enterprise Integration Tool Mark Brown – Calpine Corporation Mark Bowles – Calpine Corporation Sam Jenkins – Calpine Corporation.
DATABASE ADMINISTRATION WHAT IS IT?. THE GIST Database administrators are responsible for creating and maintaining the databases that form the core of.
Where USERS Make the Difference! Peer to Peer | Greater Scale | More Voices | Faster How to Personalize the Role Tailored Client – What you.
Open access to device intelligence. Why FDT? A r e y o u c o n f u s e d ? E v e n h e a r d a b o u t i t ? W o n d e r w h a t i t ’ s a l l a b o u.
Read to Learn How to use formal and informal methods to research careers How to evaluate sources of career information How to identify work experience.
A337 File Design Computerized and Manual Systems 11/10/2009.
PI Trickles Down At the Water District Emile Richard Portland Water District Portland, Maine.
Leadership: A Lesson from Industry
Meaningful Mathematics
By: Chelsey Joubert 4 th Period. As with the mouse, people have experimented with how to make the keyboard more user- friendly. Most Keyboards today are.
Risk Management and PINs Why risk management is so important Why HSRs should be “qualified” to issue PINs 1 Training & Safety Consultants.
ITC Summer I Table of Contents Glossary of terms Glossary of terms Safety Tips Quiz Credits Standards Multimedia Connections Multimedia.
Intro to Computers Computer Applications. What is a Computer? Initially the term computer referred to an individual whose job it was to perform mathematical.
Planning an Installation and d Upgrade. Learning Objectives  To learn how to plan an upgrade and installation.
Cctv Management Solution - CMS From – Intelitech Solutions Pvt. Limited. [ ITSPL Group ]
Process Control 2.1 – Control Systems.
INSTANT PEOPLE INSIGHTS Injazat partners with Qlearsite to bring ‘People Analytics’ to Leaders across the UAE. The art of leadership is getting a boost.
1 Technical & Business Writing (ENG-715) Muhammad Bilal Bashir UIIT, Rawalpindi.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
Smart cloud orchestrator - the first implementation in the world at Wroclaw University of Technology for supporting design processes in education at universities.
My audience will be excited to learn the basics of what a network systems & data communications analyst does.
Proficy Workflow for Water reduce. improve. secure.
WKEC STLN Welcome Back! January 29 th, Congratulations to Jessica and her beautiful family!
TOOLS What tools for occupational safety and health must be created or developed further? EntriesTotalBalance integrate OSH rules into smart products -
Register & Login pages 2 to 8 Create & Edit Quiz pages 9 to 16 Run Quizzes & Reports pages 17 to 33 Welcome to Socrative! We are happy to have you in.
JOB POSTING SECURITY AGENT STATUS: PT (Non-Exempt)WAGE:$10.50 at start CORE EXPECTATIONS The Rose Quarter Security Team is responsible for the.
Testing Requirements in the Boiler House Requirements for regular testing will vary according to national regulations, and the type of equipment installed.
INTRODUCTION TO INFORMATION TECHNOLOGY Shanti Kusumawardhani, MBus.Sys.
Universal Systems Model. Has 4 elements – Has 4 elements – Inputs Inputs Process Process Output Output Feedback Feedback.
Presented by Jon Pastuszynski, Lead M&D Engineer
Lawson System Foundation 9.0
PRODUCTION.
Test Administration & The TA Sites.
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
managing your technology environment
Inside a PMI Online Course
An Introduction to BYOD Bring Your Own Device
Presentation transcript:

GE MyFleet Persona Template

2 GE Internal 2 Control Room Operator Glen H, Control Room Operator, Inland Empire Energy Center The primary focus of my day is keeping the unit online safely.

3 GE Internal 3 GE.comBrand CentralEcomaginationUX COEMyEngines ABOUT Dan is a control room operator in Alabama. Before taking a seat in the control room, he started out in the field, learning to maintain the plant down to each pipe and valve. Once he joined the control room team, it took Dan 4 months to fully memorize the hundreds of screens needed to monitor and maintain the plant during his twelve-hour shift. Dan’s passion for the industry started in the armed forces, when he was stationed in the Navy Nuclear Program. KEY NEEDS 1.Precisely define your space to keep the plant running 2.React to what’s happening at the microsecond level 3.Develop a “feel” for how physical and digital systems should work MANTRAS 1.Question Everything 2.Constantly Learn 3.Be Level-Headed TIME HORIZON BEFOR E NOW TODAY TOMORROW WEEKMONTHYEA R TOOLS OF THE TRADE 1.Cimplicity / Simatics / Ovation 2.Pi Historian ProcessBook 3.Toolbox 4.Radio 5.Phone 6.Excel CRITICAL DATA 1.Everything 2.Megawatt Output 3.Water levels & temps 4.Emissions, NOx levels Shift-to-shift focus “You’re job is on the line when you take over” Dass, Control Room Operator, Cane Island Control Room Operator

4 GE Internal 4 PRIMARY TASKS & TOOLSPLANT STATE & FREQUENCY Monitor Monitor system, alarms, and units, and startup a unit Tools: Pi ProcessBook, Printed Binders Correct React to system, alarms, and units, and troubleshoot by consulting parameters, reviewing alarms, and coordinating diagnostics Tools: Cimplicity/Ovation/Simantics, EGD Historian, Toolbox Relay Communicate log notes and information Tools: Log Books, Phone, Radio, Text, Whiteboard, Orchestrate by calling in for help Tools: Phone Evaluate Reference O&M procedures, reference system and site drawings Tools: Pi ProcessBook, Printed Binders GE.comBrand CentralEcomaginationUX COEMyEngines Control Room Operator Tasks & Tools

5 GE Internal 5 SECONDARY TASKS & TOOLSPLANT STATE & FREQUENCY Monitor Monitor security cameras for deliveries and visitors Tools: Security Camera Correct Submit jobs for further testing on machine operations Tools: Relay Facilitate by running diagnostics and routine tests on parts Tools: Bentley Nevada System GE.comBrand CentralEcomaginationUX COEMyEngines Control Room Operator Tasks & Tools

6 GE Internal 6 Precisely define your space to keep the plant running. “Your job is on the line when you take over.” - Dass Control Room Operators manually configure their workspace because they seek consistency in the structures they create. This is especially important during shift turn- overs. Unsuccessful software upgrades, touchy systems, and continual “nuisance alarms” can be perceived as dangerous distractions that will reduce their trust in the tools they use. Many of them served in the Armed Forces and are 110% committed to carrying out their duty to the best of their ability—they expect the same caliber or integrity from their equipment.  How can we design a system that remembers a CRO’s last configuration to let them pick-up where they’ve left off?  How can create a trustworthy system that arms CRO’s with relevant information they need to start their shift? React to what’s happening at the microsecond level. “The alarm queue is the first line of defense…When you get an alarm, you still have to figure out what it means.” - Glenn Control Room Operators can be responsible for reviewing 10+ screens per unit at once. They have to be able to understand the phenomena behind an immense volume of constantly fluctuating raw data over time. For this reason, many control rooms have additional screens (both physical and digital) that they construct to highlight key real-time information they can cross-reference with trends and logic rules.  How can we provide enough context, or the “why” behind an alarm?  How can we provide navigation to information at a moment’s notice? Develop a “feel” for how physical and digital systems should work. “You gotta have a feel for it…you can’t put your finger on it, but it doesn’t look right.” - Glenn By the time a Control Room Operator earns a seat in the Control Room, they have an intuitive understanding of how a plant should normally run. But this doesn't happen quickly, and folks must learn the normal rhythm of a plant through experience. Many CROs start their career by memorizing the tag numbers and locations of every valve and part to develop an intrinsic map of the plant. When they learn software, they have to connect that mental map to 544+ screens. They have to develop, sharpen and reapply their mental model to multiple tools simply to keep abreast of what’s happening in the now at the plant.  How might we encourage faster navigation and learning through use of muscle memory? Control Room Operator Needs