Anchor Handling Tug Supply Vessel

Slides:



Advertisements
Similar presentations
AFT END ARRANGEMENT By Group 1.
Advertisements

Container Ship Construction
Self Installing Wind Turbine (SIWT) Mark Riemers – Managing Director.
Thrust bearings  Support the axial thrust of both horizontal as well as vertical shafts  Functions are to prevent the shaft from drifting in the axial.
CLIENT SHIPBUILDER CHARTER HIRE + O&M 6.
Adam Larsson, Project Manager, DNV 26 May 2011 Oshima ECO-ship 2020 The open hatch bulk carrier of the future.
Transport Systems Ships.
“Changing Industry Demands Redesign the OSV’s” 1 This paper was first presented at the “ 4 th International Conference on Technology and Operation of Offshore.
Essential reading: SPINČIĆ, A., An English Textbook For Marine Engineers I., Pomorski fakultet, Rijeka LUZER, J., SPINČIĆ, A., Gramatička vježbenica.
Ship’s measurement Lesson 3.
Emergency Response Service IASST Safety Seminar September the 20 th 2010 Alexis CARAUX Head of Emergency Response Service.
Our Services. Services Vessel Inspection 1. Sale and Purchase 2. Condition Assessment 3. Pre-charter 4. On-Hire and Off Hire.
General Arrangement Plan
General Arrangement Plan
Western Shipyard history  Established in 1969  1998 privatized by “Western Invest AS”  2001 privatized by “BLRT Grupp”  2003 restructured into WSY.
STANDART OF RIGA SHIPYARD RIGA SHIPYARD has a large experience in shipbuilding, ship conversions and ship repairs since 1913, and is one of the.
ALOKRAJ. V - NA07B004. General  All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
Lesson 4 Manning of Vessels.
Crane Operations Objective
CLEAN and CLEAN DESIGN Environmental Class Eivind Haugen, Det Norske Veritas Norske Sivilingeniørers Forening Økonomisk og Miljøvennlig drift av skip.
Office of Marine Safety Stability and Flooding Eric Stolzenberg.
GENERAL SPECIFICATION INTRODUCTION 1.INTRODUCTION 1.1General Service *The “300ft S.E.U.” is a jack-up self-elevation unit designed as a drilling and repairing.
Ship Structural Response: Loads
11/04/2002Container Ships1/43 LECTURE LAYOUT Definition Developments of container ship concept Aspects of container ship design Main dimensions: length,
Chapter I. Introduction. Naval Architecture: the science and engineering of designing ships and other kinds of waterborne crafts. Kinds of ships Sub systems.
SHIP NOMENCLATURE. DO NOW  In the United States, we commonly use the English system of measuring length & distance (feet, inches, miles…).  In most.
Ship-Type Operations UNITAS ISM Code Training Material.
INTERNATIONAL WORKSHOP ON MARINE POLLUTION CONTROL 8 th June 2006, Athens (GR) OIL SEA HARVESTER TST4-CT ww.osh-project.org THE OIL SEA HARVESTER.
Marine Safety Branch Transport Canada Presented at Gander, NL - March 08, 2004.
Water Vehicular Systems
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Sea Water Scrubber. INTRODUCTION Crystallox has developed a new generation of horizontal and vertical scrubbers for marine and land based applications.
Maryam Aljaber PBL Q2. Types of oil platforms Fixed platform. Complaint tower. Sea star Floating production system. Tension-leg platform. Spar.
FABRICATION OF BLOCKS OWNERS REQUIREMENT DESIGN CLASSIFICATION SOCIETY
General Arrangement Plan
EMERGENCY TOWING PROCEDURE
1. KEY FEATURES VESSEL IS OCCUPIED WITH FULLY AUTOMATIC SYSTEM IN SUCH A WAY THAT 4 CREW CAN OPERATE THE VESSEL MANEUVERING AND CARGO LOADING/DISCHARGING.
Dewatering Equipment.
Shipping Agenda Part 1. Introduction, Nomenclature, Major shipping companies Part 2. Charter - Voyage, time and others Part 3. Deck maintenance Part. Engine.
ALOKRAJ. V - NA07B004. High Pressure Water Jet Blasting Machine  One Electric driven water blasting machine  2 water jet guns, hoses 400 feet each as.
New Technical Approach to Classification of Anchor Handling and Diving Support Vessels A. DEVADAS RINA MUMBAI.
Decks, Bulkheads, and Flooding
Vessels ROVs & suport toolings special machines ROV multi-tasking conclusions VLV T Workshop Enabling technologies for deepwater operations Amsterdam,
Ancillary Services UNIT 10.
Lesson Five Bulkheads and Pillars.
NON SEA WATER BALLAST BUNKER TANKER INVENTED & DESIGNED BY XED
Whitelaw & Pearson The Costs of Increasing a Basic Shrimp Vessel from 65 to 85 FEET A Case Study.
Innovative Mooring & Fendering Technology for the Sea Base Dave Liese, PMS 325 Joint Sea Based Theater Access Workshop Duck, NC 8-11 February 2005 Draft.
Derecktor and DAMEN have entered a license agreement to build DAMEN designs in the US This license includes the FCS 2008.
SHIPS, SHIP ROUTINE AND CONSTRACTION. 1. The pillar shape that gives the greatest strength for the least weight is the _______. A. circular type pillar.
DIESEL FUEL FILL 1.Secure Fireboat 2 to fueling dock, fueling vessel, or vessel to receive fuel (Fig ). 2.Develop communications as needed, including.
Best Quality Green Technology High Confidence
Lecture 2: Ship structural components
ALOKRAJ. V - NA07B004. General All deck machinery and construction equipment are to be supplied and installed to meet classification, intended operational.
Lesson Two Ship Design. Contents Design essentials Design Procedure advances factors concepts requirements Detailed operation.
Sprinkler Loads on Trusses Educational Presentation.
 FPSO — floating production, storage, and offloading systems; offloading of the crude oil to a shuttle tanker;  These are typically converted or newly.
TUGS & WORKBOATS TUGS ASD TUG 2810 HYBRID. TUGS & WORKBOATS TUGS 2 ASD TUG 2810 HYBRID Pollution of sea water by garbage. Pollution of sea water by sewage.
UAE YACHT REGULATIONS PRIVATE YACHTS.
Lesson 4 Manning of Vessels.
Chapter 6 Question-and-Answer.
GCC CODE “THE SAFETY REGULATIONS FOR SHIPS THAT ARE NOT COVERED BY THE INTERNATIONAL CONVENTIONS” THE CABINET RESOLUTION NO.(29) OF 2013.
Steering System Steers the vessel from side to side
THE OIL SEA HARVESTER SYSTEM :
Developments of container ship concept
Firefighting equipment
Classification Societies
LIFT,ESCALATOR AND MOVING WALKS
Presentation transcript:

Anchor Handling Tug Supply Vessel C. HARSHA NA07B007 DEEP SUNDAR NA07B012

AHTS Offshore supply vessels specially designed to provide anchor handling and towage services for semi submersibles, platform jackets, barges and production modules/vessels. Some Anchor handling tug supply (AHTS) vessels are equipped for fire fighting, rescue operations and oil recovery also. AHTS vessels range from small and compact vessels to large and powerful ships. ( 30mts to 100mts ) They can be fitted with the world’s largest advanced winches, providing tremendous pulling power for working at the deepest depths

Towage Services Anchor handling tug supply (AHTS) vessels tow oil drilling rigs or jacket platforms to their location and back, behaving like an ordinary tug. For towing Anchor handling tug supply (AHTS) vessels have very high power engines (~12000bhp) for an enhanced towing and anchor handling capacity. They have more power to increase the bollard pull. –*Sea Eagle 1* Modern vessels are capable of positioning and mooring drilling rigs in any location, at virtually any depth and under any conditions. – *TIDEWATER*

Anchor Handling Machinery is specifically designed for anchor handling operations. They have an open stern to allow the decking of anchors. They have arrangements for quick anchor release. Fitted with powerful winches for quick and effective anchor handling.

Other Secondary Uses Fire Fighting: Modern vessels are fitted with pumps that can spray water. Rescue Operations: They have a large deck area and exhibit good stability suitable for rescue operations. Sea Eagle 1 can carry a maximum weight of 2,300t without submerging. Oil Recovery: Modern vessels are fitted with suction pumps that can be used to clean in case of oil spills.

Machinery on board a typical AHTS DECK MACHINERY Anchor Windlass 1 Deck Crane ( Telescopic type) 2 - 3 Tugger Winches 2 Towing and Anchor handling winch 2 Towing pin and shark jaw 1 (hydraulic) Mooring winches 4 Mooring Anchors 4

A Towing Pin and Shark Jaw

Main Machinery Main Engine Steerable thruster Tunnel thruster Generator Harbor generator Emergency generator Air compressor Air receivers Bilge/ballast pump Fire pump Fuel oil Cargo/ transfer pump Drill water pump

80 TON BOLLARD PULL AHTS L AHTS HALUL OFFSHORE SERVICES Co. W.L.L Owner : Halul Offshore Services Company W.L.L Builder : TBA Classification: LR / IAACS Member

Halul Offshore Services Financial Status

GENERAL SPECIFICATIONS OUTLINE Twin screw Anchor Handling, Towing, Supply and fire fighting Vessel completely outfitted and equipped for rescue, offshore supply and other related duties. Operational on a twenty-four (24) hour per day basis. Vessel shall be capable of operating in all seas and weather conditions, which may occur.

Operational Requirements Transport fresh water, diesel oil, deck cargoes, bulk cargoes (cement/Barites/Bentonite) liquid mud, stores, materials & equipment. Tow / move Rigs Anchor handling External fire fighting Transportation of passengers to and from Oil field, located offshore in the State of Qatar

Operational Requirements To berth and/or hold station near offshore platforms to safely transfer passengers, liquids, deck and bulk cargoes. Rescue personnel fallen overboard and pollution control Helicopter hoisting facilities 24-hours/day continuous operations, capable of remaining on station for a minimum of 15 days.

Operational requirements Good maneuverability and station keeping Twin controllable pitch propellers Twin rudders / Azimuth Thrusters Bow and stern thrusters Wheelhouse is designed to ensure excellent all-round view. full-length windows and deck head windows Additional CCTV monitoring with 3 cameras (zoom and wide angle)

Endurance Requirement Provide a stable platform/deck even in rough weather conditions. To minimize pounding and rolling, the main weight should be concentrated mid-ship and aft and the hull form should feature a fine bow with flared section above waterline.

Principal Particulars Dimensions (approximate): Length overall 70.00 m Breadth moulded 16.00 m Depth moulded 7.00 m Draft Scantling 6.50 m Draft loaded (Maximum) 6.00 m Performance: Dead Weight 2500 T Bollard Pull 80 T Trial Speed at100% MCR & 4.5m draft 13.5 Kts Service Speed at 85% MCR & 4.5m draft 12.5 Kts Endurance 15 days at service speed

Machinery Main Engine 2 x ~2750 KW Propulsion System conventional or Azimuth Generating Set 3 x ~400 Kw (diesel driven) Shaft Alternator 2 x ~1200 KW (each) Emergency Generator 1 x 120Kw (diesel driven) Main Engine driven Fi-Fi pump 2x1650 cu. m Bow Thrusters 2x~500 KW Stern Thrusters 1x~500 KW Fuel Oil Cargo Pump 2x~100 cu.m/hr . @75m head Fresh Water 2x~100 cu.m/hr Drill Water Pump 2x~100 cu.m/hr Mud Pump 2x~100 cu.m/hr

Complement Crew 18 men Hospital 0 men Special personnel 20 men Total 38 men Clear ceiling is not to be less than 2150 mm (average) generally in accommodation spaces The accommodation is well appointed and centrally air-conditioned.

Classification Registry The vessel including its Hull, Machinery and outfitting equipment shall be constructed in accordance with the latest Rules for Building & Classing of Steel Vessel to Lloyd Register of Shipping. Rules which may come into force prior delivery of the vessel shall be treated as modification. Registry The vessel will be registered at Doha, under the flag of Qatar.

Rules & Regulations SOLAS International load line convention International convention for prevention of pollution by ships Radio communications regulations Regulation for Prevention of collisions at sea IMO, ISO and many others

Certificates Builder’s certificate Classification certificate safety equipment, construction, radio certificate Load line certificate Tonnage certificate IOPP certificate and many others

Materials & Workmanship good shipbuilding quality test certificates good welding quality Blasted and primed before using. Only mild steel to be used for hull structure All visible plates are to be smooth and straight Makers List All timber to be impregnated against rot, infestation and free from odour.

Welding Contract plans, specification & classification requirement. High standards of up-to-date welding practice Alignment, fairness, edge preparation and gap widths. Continuous welding is to be used for all the structure up to uppermost continuous deck and weather exposed area. Intermittent welding to be used only inside the superstructure.

Inspection/Supervision surveyors, owner’s representative and consultants are to be given free access to the builder’s yard. Qualified personnel shall be in attendance during installation, commissioning , testing , dock trials and sea trials as necessary at builder’s expense. QAP Plan showing inspections and control points by class and owners representatives, within 2 months of contract signing.

Tests Shop Trials Onboard Trials Alternator set load trials Hydrostatic pressure tests Sea trial Speed trial Endurance trial Steering and turning circle trial Stopping and astern trial Inclining test Environmental conditions Trim and stability

Dock trails Dock trails are carried out in accordance with a programme agreed between builder and the owner Trim and stability

Drawings General arrangement Hydrostatic curves Stability booklet Dimensional profile Docking plan Anodes plan Structural profile and deck Midship section

Drawings Engine seating detail Forward sections Aft sections All transverse and longitudinal bulkheads Superstructure detail `A’ bracket details Shafting arrangement Rudder arrangement

Drawings Rudder stock and rudder drawing Anchoring and mooring arrangement Deck outfit plan Ship’s fuel oil and Lube oil system Engine room layout Thruster tunnel details Refrigeration system Schematic wiring and reference to fittings

Drawings Shaft generator arrangement Ventilation arrangement Cargo securing manual Fire safety operation booklet Training manual for fire fighting Well killing liquid system External FI-FI system Layout of manholes and hatches

Drawings Mast drawing Bulk cargo system Purification system Painting scheme Fendering plan Towing and anchor handling arrangemet and details including all the equipments onboard like stern roller, tow pins, shark jaw, towing bollard, AHT winch etc.

Environmental conditions The vessel, plant, machinery and equipment, their components and related systems shall be entirely suitable for service under following conditions

Sea water temperature 36C Ambient air temperature 50C Relative air humidity 92% Wind velocity 18m/sec Significant wave height 3.0 m Current velocity 1.0m/sec Wave period 10 sec

Framed Plans Vessel Operating Manuals Manuals of Machinery and Equipment Spare Gear and Tools Practice Modification Ship’s Model A scale of 1:100 shall be supplied Model test Delivery

THANK YOU