Conwy Estuary Strategic Route Project Progress Photographs.

Slides:



Advertisements
Similar presentations
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Advertisements

CONSTRUCTION DRILLING INC.
Cofferdam.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Enzyme Stabilized Mud (Earthen) Construction using DBV-1
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
Measurement for Civil Engineering works
FIXED MARINE STRUCTURES
Project details • New headquarters for HKSB
DAMS.
Council Bluffs Value Engineering Workshop
CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE.
Foundation Systems.
Structures Mrs. Bader. Definition Slide Structure - an arrangement of parts.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Commercial Foundations
What is a Dam? A dam is a hydraulic structure of fairly impervious material built across a river or a stream to retain the water. It prevents the flow.
Looking through the window of the model, the water in the canal on the left has reached the vertical flood wall. Under the white clay levee, the dark swampy/marsh.
Types of Concrete Foundations. Concrete Piers Foundation This type of foundation is mostly used on buildings with post & beam style construction. It is.
Basic Civil Engineering-Foundation
ASSALAMUALAIKUM & GOOD MORNING
Building Walls Have one main purpose, to support roofs and ceilings such walls most often have three or more separate components. In today construction,
ERT352 FARM STRUCTURES RETAINING WALL DESIGN
Commercial Foundations
The architect who designed the hotel was Tom Wright, Born on September 18th Wright studied at the Royal Russell School and then later at the King.
Sec 2 IDS, 2010 Coastal Management. You will learn: 1.Evaluate the feasibility of coastal protection measures at Pulau Ubin.
Bridge Engineering (5) Substructure – Abutments and Piers
Austin Friars Environmental Enhancements Briefing Session.
Preparing Foundations for Cylinders & ASME Tanks
9. Seepage (Das, chapter 8) Sections: All except 8.2, 8.6, 8.7, 8.8, 8.9.
MASONRY. Introduction Masonry→ construction of buildings units bonded together with mortar The building units →bricks, stones or precast concrete, Depending.
Chapter 23 Elevation Layout and Drawing Techniques.
Monday 1 st June 2009 Major Projects Dewar Place Cable Tunnel Works at Gardner’s Crescent Update Meeting.
BRVFD & RS Training Facility Proposal 05/07/2009.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
Framing the House. Platform Framing Platform framing.
DAMS Dept. Of Civil Engineering
Day 20 PRECAST AND PRE-STRESSED CONCRETE Pre Cast concrete comprise units that are made under controlled conditions, with necessary preparations for.
Basic Hydraulics: Bridges. Definition & terminology Abutments Flow contraction.
Progress Photos March Construction Progress Park Station Portal Shaft Excavation 16 March 2007 View towards South 16 March 2007 General views of.
UNIT I RETAINING WALLS.
Chapter 2: Total Hydrostatic Force on Surfaces
COFFERDAMS.
Foundations of Marine Structures SOIL MECHANICS CIVIL ENGINEERING DEPARTMENT BMCET JOSLIN JOSH GATHA DESAI.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
Mahatma Gandhi Institute of Technical Education & Research Centre
FOUNDATIONS.
SOIL MECHANICS AND FOUNDATION ENGINEERING-III (CE 434)
Soil mechanics and foundation engineering-III (CE-434)
David Smith, Project Manager GZA GeoEnvironmental, Inc. February 13, 2015 Blynman Canal and Stacy Boulevard Bulkhead Improvement Projects 1.
The Malahide Railway Viaduct Group 15: Harry Griffin & Carl O’Sullivan.
Building Foundations.
ELCITA UPDATE February 2017.
Substructure Groundworks - Hazards
Scenic Highway – Public Meeting
DR. JIVRAJ MEHTA INSTITUTE OF TECHNOLOGY
Elevation Layout and Drawing Techniques
What would a lunar eclipse look like if you were standing on the moon?
EAG346-Sem II 2014/2015 Lesson 2.
Suresh.R.
Organics Waste Processing Facility Construction Progress Update December 15, 2010
Framing the House                                                                                                                   
Progress Report 11/10/11.
Structures Mr. Hickey.
Copyright by Mashhadcivil.ir.
Retaining Walls 101 – July 25th 2018
Hard Engineering Case Study
UNIT 7 DAMS SANDEEP LECTURER IN CIVIL ENGG. GP MEHAM.
Minuteman Vocational Technical Regional High School Progress
BUILDING CONSTRUCTION Foundation
Presentation transcript:

Conwy Estuary Strategic Route Project Progress Photographs

RES0403A – Conwy Quay Wall Extension (Phase 1 Works) Photograph showing the the inside of the dilapidated sheet piled Training Wall, including large volumes of silt material. Area of proposed mass concrete gravity wall, and existing restricted access to the foreshore. Please note the areas of large silt material within the foreground

Reclaimed area to the rear of the newly constructed mass concrete gravity wall being Infilled with granular material. RES0403A – Conwy Quay Wall Extension (Phase 1 Works) Drilling and piling works continue on the new sheet piled to assist with achieving required toe depth to satisfy the design. Drilling works were necessary due to the hardness of the rock.

RES0403A – Conwy Quay Wall Extension (Phase 1 Works) The below photograph highlights the complexity and constrained nature of the works

RES0403A – Conwy Quay Wall Extension (Phase 1 Works) First coping stone is placed.Sorting of the materials on the foreshore continues for potential reuse within the works.

RES0403A – Conwy Quay Wall Extension (Phase 1 Works) Works nearing completion.

RES0404A – Marine Crescent, Deganwy Enhancement Works (Phase 1 Works) Photograph showing Marine Crescent before the commencement of works. Note timer marker posts which were used to highlight the top of the proposed masonry flood wall.

RES0404A – Marine Crescent, Deganwy Enhancement Works (Phase 1 Works) New precast concrete masonry wall units being secured to new foundation. Landward side of new wall is to be dressed with masonry.

RES0404A – Marine Crescent, Deganwy Enhancement Works (Phase 1 Works) Works were substantially complete in June this year. The photographs highlight new flood wall, lighting, wider footway and formalised parking arrangements.