Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.

Slides:



Advertisements
Similar presentations
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Advertisements

Organization of Primary Entities
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
P ROJECT M ANAGEMENT The FORE SIGHT Partners. The FORE SIGHT Partners 2 Owner Support Professional Services The FORE SIGHT Partners.
Building Success Stories: A Survey of Construction Delivery Methods PRESENTED BY: BLAKE G. POWELL.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Click here to add text The Single Prime Contractor Delivery Method Ohio School Facilities Commission Ohio Construction Reform.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
A Match made in Heaven? Connecting you with a builder.
Your Deliver Method... …Pick it Early
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Construction Engineering 221 Drawings and Specifications.
Chapter 1 Introduction. 1-1 THE CONSTRUCTION INDUSTRY construction contracting is a very competitive business with a high rate of bankruptcy. construction.
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Honoraria for Design Build Projects Methodology Assessment Matrix.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Dr. Hany Abd Elshakour 9/7/ :22 PM1. Dr. Hany Abd Elshakour 9/7/ :22 PM2 Engineering Project: Participants and Life Cycle.
Chief Legal Counsel, OSFC
Project Delivery Options in the California Construction Market CSI Fresno Chapter - February 16, 2010 PROJECT DELIVERY OPTIONS in the CALIFORNIA CONSTRUCTION.
Construction Contracts and Project Delivery Methods
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Agency Construction Management :CM NOT AT-RISK
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
You passed the Bond or secured some funds What do we do now? 2014.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
Kurt Krause. Topics of Discussion 1.Project Delivery Method Definition 2.Brief History 3.Alternative Project Delivery Trends 4.Key Drivers of APDM 5.Risk.
UTILIZING CONSTRUCTION MANAGER AT RISK IN GREENSBORO, NORTH CAROLINA.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
© 2011 Orbach Huff & Suarez 1 Lease Leaseback Project Delivery Method Kimble Cook Orbach, Huff & Suarez.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Integrated Project Estimating & Scheduling By Dr. Awad S. Hanna Professor and Chair of Construction Engineering and Management Program Department of Civil.
Project Delivery And The Changing Roles Of Contractors
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
CHANGING PROJECT DELIVERY SYSTEMS
Nepal administrative staff college
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
2016 SAME Small Business Conference - Atlanta
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
PROJECT DELIVERY METHODS
CHANGING PROJECT DELIVERY SYSTEMS
Project Delivery Systems
Nepal administrative staff college
Traditional Steps Leading To A Bid Document
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
MULTISPORTS CENTRE PRESENTATION
Building Construction Delivery Systems
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental Engineering Construction Engineering and Management Program

Prof Awad S. Hanna Traditional Method (Design_then _Build)  Also known as Design_Bid_Build or hard money or Competitive bid contract.  Has three sequential phase Design - Bid - Construction. Design Phase Bid/Award Construction Phase Architect- Engineer hired Single Construction Contract

Prof Awad S. Hanna Tradition Organization of Construction Project approval and selection of A/E Call for bids Bid acceptance and notice to proceed Project completion and acceptance Feasibility Engineering and design Contract Industry participation bidding documentsPlanning, engineering, and management Contractor Construction Use of facility Specialist and consultants A/E general supervision A/E design consultant Build the project on paper Owner user In-house and consulting services Contract design and supervision Single bid package Contract construction

Prof Awad S. Hanna Traditional Organization Owner A/E General Contractor Sub Contractor Sub Contractor Sub Contractor Sub Contractor Sub Contractor

Prof Awad S. Hanna Estimating Needs for Design-Bid-Build  Complete set of drawings  Specification  Other contract documents  General conditions  Special conditions  Addenda  Others (soil report)

Prof Awad S. Hanna Hierarchy of Contract Document Addenda Specification Drawing General Conditions Special Conditions

Prof Awad S. Hanna Single Source Delivery 1.Design Build 2.Engineer/Procure/Construct (EPC)  EPCmodel#1 (Pure CM, Construction Management)  EPCmodel#2 (General Contractor acting as construction manager)  EPCmodel#3 (A/E acting as CM)  EPC model #4 (CM acting as Contractor) 3.Others

Prof Awad S. Hanna Fast Track or Phased Construction Method Design Phase Construction Phase CM and A/E or DB hired ConceptsWorking Drawing Variable separate construction contracts

Prof Awad S. Hanna Level of Influence Influence Ability to Influence Project Cost Time

Prof Awad S. Hanna 1. Design Build Owner Design Sub-Contractor Engineer Contractor General Contractor Own Force Work  Single firm responsible for both design and construction.

Prof Awad S. Hanna Form of Design_Build Organization Owner Design-Builder (Architect/Engineer) Contractor Owner Design-Builder (Contractor) Architect/ Engineer Owner Design-Builder (Joint Venture) Owner Design-Builder (DB Firm)

Prof Awad S. Hanna Advantages of Design & Build for Owners  Owner only has to communicate with one entity for the entire project  Total project duration can be reduced because phased construction is easier to implement,(Fast tracking)  Integration of construction planning and design phases  Claims reduction (reduction of adversary relationships)  Innovation in design and construction can be encouraged  Risk assigned to party best able to manage that risk  Reduce change orders

Prof Awad S. Hanna Disadvantages of DB for Owners  Fewer checks and balances, owner must rely on integrity of the design-build firm  Reduced owner involvement in the design process may result in less than expected results  All your eggs in one basket

Prof Awad S. Hanna Advantages to a design-build organization  Improved constructibility through design/construction integration  A specialized organization can be developed that has a specific expertise which will be attractive to specific market areas  Reduction of negligence claims between the Architect/Engineer and the construction contractor since they are under one umbrella firm  Ability to react rapidly to change in scope

Prof Awad S. Hanna Disadvantages for the design-build firm  Acceptance of additional project risk  Possible premature release of bid packages (when using fast track) which can lead to increased errors in the plans and extras  Scope of work changes can be difficult to identify under DB/ fast track construction  Heavy overhead due to large multi-disciplined staff requirements

Prof Awad S. Hanna 2. Engineer/Procure/Construct (EPC) Specialty Contractors and Vendor Owner CM In-House Design or Engr. Firm Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor Pure CM EPC Model #1

Prof Awad S. Hanna Cost Saving due to Competitive Bidding Total Project Cost $ 825,000 General Contractor 2 $ 845,000 General Contractor 1 $ 840,000 Saves $15,000 Bid Pkg 1 $ 90,000 Bid Pkg 2 $ 195,000 Bid Pkg 3 $ 220,000 Bid Pkg 4 $ 320,000 Best Bids Received Best Bids Received 95, , ,000200, ,000 90, , , , , ,000 95, , , , , , , , , , , , , , , ,000 By soliciting more bids and by passing the savings directly to the owner, the owner saves $15,000 compared to the best general contractor price. This example illustrates four bid packages. Typical commercial building projects may have thirty or more bid packages.

Prof Awad S. Hanna 2. Engineer/Procure/Construct (EPC) (cont.) Specialty Contractors and Vendor Owner Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor General Contractor acting as CM EPC Model #2 Engineering/Procure Construct

Prof Awad S. Hanna Other Models of Single Source Delivery Systems  A/E acting as CM Owner A/E and CM Prime Contractor EPC Model #3

Prof Awad S. Hanna CCM acting as Contractor Owner A/ECM Contractor Prime Contractors EPC Model #4 Other Models of Single Source Delivery Systems (cont.)

Prof Awad S. Hanna Others Design Department Contractors Owner Construction Department Optional Own Force Work Owner Builder CM Owner Prime Contractors Subs A/E Owner C.M.

Prof Awad S. Hanna Estimating Needs for Single Source Delivery  Conceptual Design  Assemblies cost data  Update your estimate as the design develops  Value engineering studies

Prof Awad S. Hanna Design-Build Issues 1.Prequalification  The reduction of the number of possible bidders to a small group of serious, qualified bidders improves the effectiveness of the selection process.

Prof Awad S. Hanna Design-Build Issues (cont.) 2. Proposal Evaluation  Cost only  Cost and time  Multiparameter (quality, safety…etc.)

Prof Awad S. Hanna Innovative Contracting Methods  Multiparameter Bidding (A+B+C) Multiparameter bidding is a bidding system within the competitive bidding concept where successful bidder is selected based on the combined cost, time, and quality.

Prof Awad S. Hanna Example of Multi-parameter Bidding Lowest Cumulative Bid Cost

Prof Awad S. Hanna Design-Build Issues (cont.) 3.Legal a.Insurance and Bonding  The contractor should have the proper insurance to cover design deficiencies or cover construction errors. b.Conflict of Interest  Design-build eliminates the checks and balance of the traditional methods.

Prof Awad S. Hanna Innovative Contracting Methods (cont.)  Construction Warranties (DBW) A warranty is a guarantee of the integrity of a guarantee of the integrity of a project and of the maker responsibility for the replacement or repair of deficiencies for a period longer than the traditional 1-year warranty.  It is different than project maintenance warranties that provide routine maintenance