Planning & Delivery Systems Construction Engineering 380 Engineering Law
Planning and Delivery Quality, speed, and cost form the management triangle of construction (and other design and delivery systems) cost time quality Balanced job time cost quality Time constrained job
Planning and Delivery Project constraints affect choice of planning and delivery system Business judgment, engineering judgment, and legal judgment are all involved in the management triangle, and decisions must be made with an understanding of risk, project goals, and constraints
Planning and Delivery Direct legal controls- registration, licensing, award process, standards, claims process Indirect legal controls- loss of efficiency, contract and control ambiguity, cost of collection, risk management
Planning and Delivery Contract award –Public contracts- usually competitive bid process of some kind –Private contracts- market governed Contract pricing –Fixed price (lump sum) Risk is with the contractor Contractual method for increasing price of contract Allows owner to better plan financing IF the plans and specs are sufficiently complete & coordinated
Planning and Delivery –Cost (Cost plus) contracts Beneficial when design conditions are uncertain or incomplete Can be a problem for financiers of the project No incentive for designer or contractors to manage cost Can put in a guaranteed maximum amount (G-Max or GMP) and a cost-savings split option Jobs are usually open book Value engineering- is a gray area because of intellectual property issues and bid-shopping
Planning and Delivery –Unit price contracts Used when material estimates are impossible or unreliable (soil excavation, remediation, asbestos) Good for repetitive work easily categorized How to handle “general conditions” needs to be addressed Can be combined with other forms of contracting (for instance, LHI on development projects)
Planning and Delivery –Allowances Set a fixed amount for certain categories of work to be included in the contract but final choices have not been made (used frequently for equipment and finishes) Variances are handled through change orders Must spell out net vs., gross, and how shipping, OH, and other related costs are handled
Planning and Delivery –Contingencies Unallocated money set aside in a contract for uncertainties and other unforeseen (latent) conditions.
Planning and Delivery Traditional delivery –Design and construction are separated –Design-bid-build sequence –Wider range of design possibilities –(theoretically) better quality control –Contractor left out of the design process –Adversarial relationships develop –Cost “designed-in” early, hard to fix
Planning and Delivery time $ Cost of changes Cost of design
Planning and Delivery Early design decision fix cost parameters and constrain subsequent decisions Construction Management- three party contracting Design-Build- single party contracting Fast-tracking (design-assist) Multiple Primes Turnkey contracting (land, financing, eq)
Planning and Delivery Partnering and teaming –Becoming more formalized –Set goals and expectations –Develop trust and commitment to the project –Build, operate, transfer –Build, operate, own Privately financed infrastructure More common in lesser developed countries with insufficient capital for water systems, sanitation