(A) Completion of on going works of dam, canals,etc. including restoration of works of dam. PROJECT WISE DETAIL Total Provision Rs. 8.00 Crore Measure/Project/SectorDistt.

Slides:



Advertisements
Similar presentations
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW APRIL 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State___________.
Advertisements

Bundelkhand Special Package Animal husbandry Department Madhya Pradesh 1.
Development of Lands of Poor Rural Development, Govt. of A.P.
Doosti Dam on shared river of Harirood: A Friendship Bridge Between Iran and Turkmenistan Saeed Nairizi Head of the Board & Managing Director, Toossab.
Crop as Damaged by Pond previously Crop as Damaged by Pond previously.
Sl. N. Name of ProjectAgencyEstimated Cost Latest Estimated Cost by Planning Commission Fund Release by GoI ExpenditurePhysical Status ENERGY.
Staff Updating & Review Meeting Netherlands Leprosy Relief-India R a m n a g a r R a m n a g a r 8 th & 9 th December th & 9 th December 2010 Presented.
LORD Addl. PD, DRDA, BOLANGIR Presentation by HARISHANKAR.
MUSURUMILLI PROJECT 15 km 35.4 km Project cost : cr
SPILLWAY ( 77 mt) 31.5 Km SEEPAPALLY VAGU RESERVOIR Right Earth Dam226 Mt Left Earth Dam 522 Mt Non EPC Package Works under progress EPC Package Works.
CONVERGENCE OF MGNREGA DEPARTMENT OF AGRICULTURE GOVERNMENT OF TRIPURA.
Madurai Date: 10 & 11th March 2014 STATE LEVEL NODAL AGENCY TAMIL NADU.
Group-II Adoption of Improved Technology for Efficient Use of Water, Nutrients & Plant Protection Chemicals.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW JUNE 2007 Reforms-Projects-Funds Mobilisation & Grant Utilisation State:- Goa City:-
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
Implementation of MGNREGS in Andhra Pradesh In India Agriculture based Livelihoods: Opportunities and Potential 1 Government of Andhra Pradesh, India.
RESERVOIR POSITION CWC monitors 81 important reservoirs and issues weekly bulletins of storage position Total designed live storage capacity = BCM.
BRINGING GREEN REVOLUTION TO EASTERN INDIA (BGREI) MEETING OF CENTRAL STEERING COMMITTEE at KRISHI BHAWAN, NEW DELHI 31 ST OCTOBER, 2014 Department of.
MANDI PARISHAD UTTAR PRADESH Website - NEW HORIZONS.
TADIPUDI LIFT IRRIGATION SCHEME
Neotech Institute of technology Department of Civil Engineering
Hydro Electric Power Plant
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
Projectsunder JnNURM Scheme Construction of traffic transit management centres Procurement of buses.
PEDDAGEDDA PROJECT Project cost : Crores Ayacut : Acres
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
Mid Day Meal Scheme AWP&B Arunachal Pradesh.
LEFT LINK CHANNEL 540M RIGHT LINK CHANNEL 210 M LEFT HEAD SLUICE RIGHT HEAD SLUICE PROPOSED RIGHT MAIN CANAL 1,20,000 ACRES Km Km LEFT.
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
30Nos. Distributaries under the 3 canals are in progress and are to be completed by 3/2006. Lining works for all 3 Main Canals proposed in package 94,
1 Performance review of the D/o RD & PR for RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT.
HYDROLOGY PROJECT I HYDROLOGY PROJECT II HYDROLOGY PROJECT Project Period 1996 to 2004 Total Outlay 12.5 Crores Project Period 2006 June to May 2014 Total.
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
Under execution YELLUR BALANCING RESERVOIR EXISTING SINGOTAM RESERVOIR
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
AGRICULTURE DEVELOPMENT IN THE EASTERN REGION WORKSHOP TO REVIEW STATE IMPLEMENTATION PLANS WEST BENGAL.
Review of utilization of 13 th FC Grants Finance Department
Presentation Format MGNREGA PMGSY Rural Housing : IAY BRGF Integrated Action Plan.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
Dr Ranu Rani Sethi Senior Scientist ICAR-IIWM, Bhubaneswar, Odisha District Irrigation Plan (A case study of Nayagarh district of Odisha)
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
TELUGU GANGA PROJECT (2 years period)
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
SRI RAMATHEERTHAM BALANCING RESERVOIR NAGARJUNASAGAR RESERVOIR KRISHNA RIVER ONGOLE NAGARJUNASAGAR RIGHT MAIN CANAL ONGOLE BRANCH CANAL RAMATHEERTHAM BALNCING.
PRESENTATION OF Integrated Watershed Management Programme (IWMP) & Pre-IWMP (IWDP, DPAP) Uttar Pradesh by Land Development & Water Resources Department,
Sarva Shiksha Abhiyan SSA, UT Mission Authority Andaman & Nicobar Islands loZ f’k{kk vfHk;ku CIVIL WORKS.
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
THE JnNURM IN CHENNAI An assessment with focus on the urban poor Transparent Chennai.
ActionSoft Tool for Scheme Implementation & Monitoring.
Construction Fundamentals Chapter 16.  Construction technology is the design and building of structures.  Purposes of structures  Places to  Live.
REVIEW MEETING ON CROP DEVELOPMENT PROGRAMMES PRESENTATION : CHHATTISGARH VARANASI : 18 th November, 2011.
:: Presented by :: (Rohit Gupta) DPC (Mahatma Gandhi NREGA) & District Collector Udaipur Mahatma Gandhi NREGA Udaipur.
UTTAR PRADESH IRRIGATION DEPARTMENT BUNDELKHAND PACKAGE.
STATE - PUNJAB TWO DAYS CONFERENCE OF CEOs OF SLNA TO REVIEW IMPLEMENTATION OF WDC-PMKSY (ERSTWHILE IWMP) (18-19 th February, 2016 ) For internal circulation.
ENSURING FOOD SECURITY THROUGH WATER CONSERVATION AND RAIN WATER HARVESTING - WITH SPECIAL REFERENCE TO WESTERN UTTAR PRADESH, INDIA K.B.Biswas, Chairman.
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
FLOW DIAGRAM OF C.B.R RIGHT CANAL (LINGALA CANAL FROM KM TO KM ) WORKS GROUNDED COMPLETED CHITRAVATHI BALANCING RESERVOIR (Existing) KM 0.00.
TARAKARAMA THIRTHA SAGARAM PROJECT Project Cost : Crores Ayacut: Acres Km. Excavation of RMC including Distributories, Field Channels.
GOVERNMENT OF TELANGANA Irrigation & CAD Department
Review: Implementation of Smart Cities Mission Haryana
Pradhan Mantri Krishi Sinchayee Yojana
Presentation on Ken – Betwa Link Project-Phase-II
IMPLEMENTATION OF MITIGATION AND ADAPTATION
Review of CADWM Projects Under PMKSY
MDM-PAB Meeting –PUDUCHERRY On
Defence Industrial Corridor
Presentation transcript:

(A) Completion of on going works of dam, canals,etc. including restoration of works of dam. PROJECT WISE DETAIL Total Provision Rs Crore Measure/Project/SectorDistt. Included in Package (Total Rs. In Cr.) Proposals sent for sanction to GOI (Rs. In Cr.) Approvals by GOI (Rs. In Cr.) Release by GOI to State Govt. (GOI) (Rs. In Cr.) Items/Works Additional Benefits 1Balance work of lining of upper Rajghat Canal to achieve additional irrigation potential Lalitpur E/W & Boulder Pitching work 1170 Hect. 2Modernization work of Gunta Dam to restore irrigation potential. Chitrakoot E/W & Pucca work & Boulder Pitching 1932 Hect. Total Hect. U.P. Irrigation Department Bundelkhand Package - Sanction/Release Status

(B) Repair and Renovation of Ponds/ Tanks including development of its command area. PROJECT WISE DETAIL Total Provision Rs Crore U.P. Irrigation Department Bundelkhand Package - Sanction/Release Status Measure/Project/Sector Distt. Included in Package (Total Rs. In Cr.) Proposals sent for sanction to GOI (Rs. In Cr.) Approvals by GOI (Rs. In Cr.) Release by GOI to State Govt. (GOI) (Rs. In Cr.) Items/Works Additional Benefits 1Restoration of Magarwara lakeJhanshi Earth work 43 Hectares of Additional Irrigation 2Restoration of Magapur lakeJhanshi Earth work144 Hect. 3Restoration of Pachwara lakeJhanshi Earth work410 Hect. 4Restoration of Arjar tankJhanshi Earth work459 Hect. 5Restoration of Kachnev lakeJhanshi Earth work100Hect. 6Restoration of Syawari lakeJhanshi Earth work86 Hect. 7Restoration of Tendol tankJhanshi Earth work119 Hect. 8Restoration of 3 No. Bundies in Bangra Block Jhanshi E/W & Pucca work 351 Hect 9Restoration of 11 No. Bundies in Mauranipur Block Jhanshi E/W & Pucca work 190 Hect 10Repair & Restoration of Padhari Navtal check Dam. Jhanshi E/W & Pucca work 200 Hect. 11Restoration of Manpur, Rajataal, Ghisouli, Tank Jhanshi E/W & Pucca work 200 hect. 12Restoration of 15 No. Bundies in Panwari Block Mahoba E/W & Pucca work 237 hect. 13Restoration of 55 No. Bundies in Kabrai Block Mahoba E/W & Pucca work 2777 Hect 14Restoration of 26 No. Bundies in Jaitpur Block Mahoba E/W & Pucca work 556 Hect

Measure/Project/SectorDistt. Included In Package (Total Rs. In Cr.) Proposals sent for Sanction to GOI (Rs. In Cr.) Approv als by GOI (Rs. In Cr.) Release by GOI to State Govt. (GOI) (Rs. In Cr.) Items/Works Additional Benefits 15 Restoration of 14 No. Bundies in Charkhari Block Mahoba E/W & Pucca work527 hect. 16 Restoration of 82 No. Bundies in Hamirpur Distt. Hamirpur E/W & Pucca work7686 hect. 17 Restoration of 3 No. Bundies in Maudaha Block Hamirpur E/W & Pucca work206 hect 18 Repair & Restoration of 3 No. Bundies in Jaspura Block Banda E/W & Pucca work282 hect. 19 Restoration of 1 No. Bundies in Mahewa Block Jalaun E/W & Pucca work92 hect. 20 Restoration of 06 No. Bundies in Kadaura Block Jalaun E/W & Pucca work1042 hect. 21 Restoration of 05 No. Bundies in Dakor Block Jalaun E/W & Pucca work542 hect. 22 Restoration of Jayawanti tankChitrakoot E/W & Pucca work394 hect. 23 Restoration of Panhai tank & canal system Chitrakoot E/W & Pucca work230 hect. 24 Restoration of Lathwara tank, Derwara Bandhi, Ghuraiya & Basari check Dam. Jhanshi E/W & Pucca work425 hect. 25 Restoration of Salarpur tankMahoba E/W & Pucca work1048 hect. 26 Restoration of Kamalpura tank Mahoba E/W & Pucca work944 hect. 27 Restoration of Kulpahar tankMahoba E/W & Pucca work640 hect. 28 Restoration & Desalting of Dashrapur tank Mahoba E/W & Pucca work469 hect. 29 Restoration of 06 No. tanks in Mahoba Distt. Mahoba E/W & Pucca work538 hect.

Measure/Project/SectorDistt. Included In Package (Total Rs. In Cr.) Proposals sent For Sanction to GOI (Rs. In Cr.) Approvals by GOI (Rs. In Cr.) Release by GOI to State Govt. (GOI) (Rs. In Cr.) Items/Works Additional Benefits 30Restoration of Baradaha Dam & Canal system Chitrakoot E/W & Pucca work 394 hect. 31Restoration of 12No. tanks in Jakhaura, Bar, Talbehat Block. Lalitpur E/W & Pucca work 1560 hect. 32Restoration of 19No. Water bodies in Mahroni, Bar, Birdha, Madawara Block. Lalitpur E/W & Pucca work 1248 hect. 33Restoration of Manikpur tank & Canal System. Chitrakoot E/W & Pucca work 198 hect. 34Restoration of Jarera tank & Canal System. Chitrakoot E/W & Pucca work 567 hect. 35Restoration of Rampur Kalyangarh tank & Canal System. Chitrakoot E/W & Pucca work 203 hect. 36Restoration of Maro tank & Canal System. Chitrakoot E/W & Pucca work 1176 hect. 37Restoration of Kotwamaufi tank & Canal System. Chitrakoot E/W & Pucca work 21 hect. 38Restoration of Semra Bandhi & Canal System. Chitrakoot E/W & Pucca work 30 hect. 39Restoration of Canal system of 3No. tanks (Hella, Barahmaufi, Donda Tank). Chitrakoot E/W & Pucca work 184 hect. TOTAL : hect.

(C) Restoring Capacities of canal, repairs, renovation and remodeling of canals and construction of new canals for the purpose of integration of canals and ponds/Tanks etc. PROJECT WISE DETAIL Total Provision Rs Crore Measure/Project/SectorDistt. Included in Package (Total Rs. In Cr.) Proposals sent for sanction to GOI (Rs. In Cr.) Approvals by GOI (Rs. In Cr.) Release by GOI to State Govt. (GOI) (Rs. In Cr.) Items/Works Additional Benefits 1Additional works for optimum use of potential created in Kurar Dam and Canal System. Jhansi E/W & Pucca work 1401 hect. 2Balance work of 5 Nos. Check Dam in Mauranipur of district Jhansi. Jhansi E/W & Pucca work 97 hect. 3Additional work for Optimum use of potential creation in Augasi Pump System. Banda E/W & Pucca work 9930 hect. 4Additional work for optimum use of potential creation in Rasin Dam and Canal project. Chitrak ut E/W & Pucca work 1992 hect. U.P. Irrigation Department Bundelkhand Package - Sanction/Release Status

Measure/Project/SectorDistt. Included in Package (Total Rs. In Cr.) Proposals sent for Sanction to GOI (Rs. In Cr.) Approvals by GOI (Rs. In Cr.) Release by GOI to State Govt. (GOI) (Rs. In Cr.) Items/Works Additional Benefits 5Balance work of Gunta Canal Chitrakut E/W & Pucca work 398 hect. 6Restoring canal section and lining of Maudaha Main Canal. Hamirpur E/W & Canal Lining work 1400 hect. 7Lining and restoration of Sumerpur Branch Hamirpur E/W & Canal Lining work 300 hect. 8Work of restoring capacity of reservoir of Swami Brahmanand Dam. Hamirpur E/W & approach road & Boulder Pitching work 1855 hect. 9Restoring capacity and Renovation of Ambabai Dy. System. Jhansi Canal Lining & Restoration works 594 hect. 10Restoration of capacity construction of lining in filling reaches & fixing of outlets of Bhojla Minor & Siprily from Km to Jhansi Canal Lining & Restoration works 2605 hect. 11Modernisation of Pt. Deen Dayal Upadhyaya Patharai Dam & restoration & Lining of canal system. Jhansi Canal Lining & Restoration works 880 hect.

Measure/Project/SectorDistt. Included in Package (Total Rs. In Cr.) Proposals sent for Sanction to GOI (Rs. In Cr.) Approva s by GOI (Rs. In Cr.) Release by GOI to State Govt. (GOI) (Rs. In Cr.) Items/Works Additional Benefits 12 Rehabilitation work of Patharai Dam to restore the reservoir capacity to achieve actual proposed irrigation. Jhansi Developmental Pucca works infra structures for rehabilitati on 1400 hect. (Kharif) 13 Restoration and Lining of Sipri Dy. From Km to Km & construction of X- regulator. Jhansi Construction of X- Regulator 2- Canal Lining 376 hect. 14 Repair works of Jakhlaun Pump Canal System. Lalitpur Canal Lining 5966 hect. 15 Construction of 30 Nos. Check Dams on various Nala in the catchments of Sajnam River Lalitpur E/W & Pucca works 382 hect. 16 Restoring capacity & lining / pitching of Bhailwara Dy. System. Lalitpur Canal Lining & Restoration works 1003 hect. 17 Restoring / Renovation of Canal Section and lining of Lower Rajghat Canal in patches from Km to Km Lalitpur Canal Lining & Restoration works 586 hect.

Measure/Project/SectorDistt. Included in Package (Total Rs. In Cr.) Proposals sent for sanction to GOI (Rs. In Cr.) Approvals by GOI (Rs. In Cr.) Release by GOI to State Govt. (GOI) (Rs. In Cr.) Items/Works Additional Benefits 18Restoring/Renovation of Canal System off taking from Lower Rajghat Canal from Km to Lalitpur Canal. Lining & Restoration works 869 hect. 19Restoration and lining of Kuthond Branch, system. Lalitpur Canal Lining & Restoration works 3500 hect. 20Restoration and lining of Hamirpur Branch, system. Hamirpur Canal. Lining & Restoration works 3936 hect. 21Restoration and lining of Ranipur Canal, system. Jhansi Canal Lining & Restoration works 2000 hect. 22Restoration and lining of Pachwara, Kakwara, Arzar Main Canal Jhansi Canal Lining & Restoration works 160 hect. 23Restoration and lining of Siori main Canal Jhansi Canal Lining & Restoration works 7000 hect. 24Restoration and lining of Badwar and off takes of G.M.C., system. Jhansi Canal Lining & Restoration works 1866 hect.

Measure/Project/SectorDistt. Included in Package (Total Rs. In Cr.) Proposals sent for sanction to GOI (Rs. In Cr.) Approvals by GOI (Rs. In Cr.) Release by GOI to State Govt. (GOI) (Rs. In Cr.) Items/Works Additional Benefits 25Restoration and lining of Khaprar canal system Jhansi Canal Lining & Restoration works 158 hect. 26Restoration and lining of Arjun, Urmil, Kabrai and Chandrawal Canal System Mahoba Canal Lining & Restoration works 2497 hect. 27Restoration and lining of Kartal Canal System Banda Canal Lining & Restoration works 900 hect. 28Restoration and lining of Atarra Branch System Banda Canal Lining & Restoration works 1400 hect. 29Restoration of Payasvani Canal system Chitrako ot Restoration works 2756 hect. 30Restoration of Ohan feeder Chitrako ot Restoration works 3046 hect. 31Restoration of canal system Khapatiha, Kotara, Khambha, Khandeha, Garwan, Katrakhamba Tank & Kharsana weir Chitrako ot Restoration works 1132 hect. 32Restoration and lining of Jalalpur and Islampur Branch System Hamirpur Canal Lining & Restoration works 3600 hect. Total (C) Rs hect.