Earned Value Management

Slides:



Advertisements
Similar presentations
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Advertisements

Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
 Costs are planned, measured, analyzed and controlled in terms of project activities.  Expenditure for any activity is incurred evenly over the duration.
Monitoring and Controlling the Project
1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
Chapter 7: Project Cost Management
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Microsoft Project 2002 Sessions 5-6. Entering Tasks During this first session we will enter a set of tasks that comprise building a shed – data sheet.
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
Chapter 10: Monitoring and Controlling Change
Office of Innovations and Solution ACB-1 Project Management Principles and Practice for Managers Presented by: Pat A. Eigbe, PMP® Office of Innovations.
Project Cost Management
Using Earned Value Management System (EVMS) Briefing for ATC Engineering & Test Division (ACT-200) Managers and Leads.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Advanced Project Management Project Cost Management Ghazala Amin.
Chapter 10 Project Monitoring and Control
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Project Monitoring and Control. Monitoring – collecting, recording, and reporting information concerning project performance that project manger and others.
Project Management Methodology Project monitoring and control.
1 ev14a Interactive Session 4 u Tuesday, July 17 7pm to 10pm u Build a sqa plan for the dental office software u Assume a 3-person, development team, a.
Chapter 4: Schedule, cost, and situation analysis (pt. 2) ISE 443 / ETM 543 Fall 2013.
© SYBEX Inc All Rights Reserved. Session 10 Project Control.
Earned Value JOEL VIRAY TOPICS What is Earned Value Management? –Why do I need it? –How do I do it? Earned Value Reporting Earned.
Software Project Management Lecture # 7. What are we studying today? Chapter 24 - Project Scheduling  Effort distribution  Defining task set for the.
Chapter 15 Cost Control.
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
Earned Value SOS section Sp8Jan24ev3. Earned Value Analysis One approach to measuring progress in a software project is to calculate how much.
Chapter 9 Project Development. What to manager Client experience  Clients are very important  Happy or not is largely dependent on their expectations.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
1 Project Management – Unit 4 – Part 1 Cost Model ACWP: Actual cost of work performed: Actual costs in performing the work so far. BCWP: Budgeted cost.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Project Cost Management
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Evaluating EVM January 13, EVM Issues and Opportunities ▪ EVM Basics ▪ EVM Issues ▪ EVM ETC and EAC Calculations ▪ EVM Cost and Schedule Value Calculations.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
Where Module 04 : Knowing Where the Project Is 1.
Project Management Information System What?? Objective: –Record & report relevant information and status of various components of project –Highlight the.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Chapter 6 Project Cost Management. 2 Learning Objectives Explain basic project cost management principles, concepts, and terms. Discuss different types.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Schedule Control (Earned Value)
What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
1 Getting Value out of Earned Value (EV) Presented by Tom Arnez, PMP.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
PROJECT MANAGEMENT AND CONTROL
Budget Planning.
CHAPTER:7 Project Cost Management
Earned Value Management
Chapter 7: Project Cost Management
Project Communication, Tracking, and Reporting
Earned Value Management
Project Cost Management
Earned Value - What is it
An Introduction to Earned Value Performance Measurement
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
Earned Value Management
Managing Project Work, Scope, Schedules, and Cost
Presentation transcript:

Earned Value Management Instructor: Mike O’Dell Some slides in this presentation were originally developed by Mr. Tom Rethard, and most have been further enhanced and modified by Mr. Mike O’Dell for use in the CSE Senior Design class.

Earned Value - What is it? Simply, it is a project monitoring and measurement system that: establishes a clear relationship between planned accomplishments and actual accomplishments reinforces and rewards good planning practices

Earned Value - What is it? Basic concepts of Earned Value Management (EVM) Each task in a project earns value as planned work is completed For example (perhaps), if you were paid on this basis, you would earn $$ at key milestones based on the value of what you have completed (earned value) Earned value can be compared to actual cost and budgeted cost to determine variance and predict future performance

Earned Value - What is it? The budgeted cost (e.g., dollars, person-hours, person-days, etc.) in terms of your baseline plan/budget of the work performed up to a specified point in time Also known as Budgeted Cost of Work Performed (BCWP) Each task in the Work Breakdown Structure (WBS) is assigned a BCWP based on its individual cost. Project BCWP is total of BCWP for all tasks required to complete the project

Earned Value Components Planned Value (a.k.a. BCWS) How much work (person-hours) you planned to have accomplished at a given point in time (this is from the WBS in your plan) Actual Cost (a.k.a. ACWP) How much work (person-hours) you have actually spent at a given point in time Earned Value (a.k.a. BCWP) The value (person-hours) in terms of your base budget of what you have accomplished at a given point in time (or, % complete X Planned Value)

Earned Value: Example On Day X: Today 18 8 14 On Day X: PLANNED VALUE (Budgeted cost of the work scheduled, BCWS) = 18 + 10 + 16 + 6 = 50 EARNED VALUE (Budgeted cost of the work performed, BCWP) = 18 + 8 + 14 + 0 = 40 ACTUAL COST (of the work performed , ACWP) = 45 (from your project tracking - not evident in above chart)

Earned Value: Example Cost (Person-Hours) Time (Date) Actual Cost: what you have actually spent to this point in time. Today Budgeted (Planned) Spending Planned Value: what your plan called for sending on the tasks planned to be completed by this date. Cost (Person-Hours) Actual Spending Earned Value Earned Value: value (cost) of what you have accomplished to date, per the base plan. Time (Date)

Earned Value: Example Over Budget Cost (Person-Hours) Behind Schedule Today Over Budget Budgeted (Planned) Spending Behind Schedule Cost (Person-Hours) Actual Spending Earned Value Time (Date)

Variance Any schedule or cost deviation from a specific plan. Used within an organization to verify the budget and schedule for a project Frequently used as a key component of plan reviews and performance measurement

Variance Must compare scheduling and budget variance at the same time Schedule variance: deviations from work planned – not a measure of changes in cost Cost variance: deviations from the budget – not a measure of work scheduled vs. work completed Example: applying more $$/people to a task may maintain the schedule, but it adds to cost… schedule on track… over budget on expenses (cost)

Performance Indices Cost Performance Index Schedule Performance Index CPI = BCWP/ACWP Schedule Performance Index SPI = BCWP/BCWS Analysis CPI > 1.0  exceptional performance CPI < 1.0  poor performance Similar for SPI

Quiz The EV measurement of work you planned to have accomplished at a given point in time : BCWP ACSP BCWS ACWS True or False: At any point in time, the SPI tells you exactly how far ahead or behind schedule you are on your project. TRUE FALSE

Quiz If BCWP is 20 pm and ACWP is 15 pm, CPI: .75 1.33 1.0 If BCWP is 27 pm BCWS is 25 pm, you are probably: On schedule Ahead of schedule Behind schedule None of the above

Earned Value & Variance: Example 18 8 14 On Day X: PLANNED VALUE (BCWS) = 18 + 10 + 16 + 6 = 50 EARNED VALUE (BCWP) = 18 + 8 + 14 + 0 = 40 ACTUAL COST (ACWP) = 45 (from your project tracking) Therefore: Schedule Variance = BCWP – BCWS = 40 - 50 = -10 (behind schedule) Schedule Performance Index = 40 / 50 = 0.8, or 80% of plan (a B-, at best) Cost Variance = BCWP - ACWP = 40 - 45 = -5 Cost Performance Index = 40/45 = .89, or you’re getting an 89¢ return on every $1.00 (or, person-hour) spent on this project

Primary Measurement Methods Measurable efforts Discrete increments of work with definable schedule and tangible results (i.e., real tasks with a deliverable) Level of effort Work that is not discernable in discrete, measurable tasks (e.g., project management, training)

Determining % Complete – When? Allocate based on time spent – but what if you spend more time than allocated? Allocate 50% at start of task, 50% at end But only for small, discrete tasks Allocate 100% at start of task Allocate 100% at end of task Best solution if you keep tasks very small Allocate value at Critical Milestones Good solution when using with contract work Others? Our approach

Another Example Project Plans to spend $100K in each of first 4 weeks (baseline budget, per documented plan) Actuals, at end of week 4 show: $325K spent BCWS = $400K ($100K x 4) ACWP = $325K What conclusions can you draw? Under budget? Is project on schedule?

Another Example Project Suppose BCWP is $300K How is this determined? What conclusions now? SV = BCWP – BCWS SV = $300k - $400K = -$100K Behind schedule, but what does the $100K in variance really mean? CV = BCWP – ACWP = $300K - $325K Over budget by $25K

Earned Value Management How can you use this information? Careful analysis of variance and trends Resetting schedule or budget, when appropriate Variance Analysis Questions What is the problem causing the variance? What is the impact on time, cost and performance? What is the impact on other efforts, if any? What corrective action is planned or under way? What are the expected results of the corrective action?

Earned Value Management Extraordinary variance or alarming trends may be cause for reset or cancellation of a project, but where do you draw the line? How much variance to allow depends on a number of factors: Life-cycle phase Length of life-cycle phase Length of project Type of estimate Accuracy of estimate

Variance Projection

Performance Index Trends

Ideal Performance Index

Closing Thoughts: Management Reserve The padding always added to a project for unexpected costs that are within project scope Not an allowance for changes to scope Not part of the cost estimate Added by upper management, not the project manager.

Closing Thoughts: Government Requirements U.S. government contract cost tracking often must include: BCWS BCWP ACWP Estimated cost at completion Budgeted cost at completion Cost and schedule variances with explanations Traceability

Summary Cost, in the form of Earned Value or BCWP, can be used to analyze progress of a project Using Earned Value data to make critical project decisions must be based on careful analysis of data, variances and trends