AB EH C D F G I 10 Min. 5 11 12 373 4 11 Example Balance for 3 units/hour and compute theoretical min number of stations (primary: longest task time; secondary:

Slides:



Advertisements
Similar presentations
Quantitative Review II
Advertisements

Line Balancing Problem A B C 4.1mins D 1.7mins E 2.7 mins F 3.3 mins G 2.6 mins 2.2 mins 3.4 mins.
9 Layout Strategies PowerPoint presentation to accompany
Chapter 4: Manufacturing Processes. Learning Objectives How production processes are organized Trade-offs to be considered when designing a production.
1 IRWIN  a Times Mirror Higher Education Group, Inc. company, 1996 Facilities Layout.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Technical Note 6 Facility Layout
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Cosets.
COMSOAL Computer Method for Sequencing Operations for Assembly Lines Lindsay McClintock OPERMGT 345 – 004 May 6, 2003.
Operations Management Layout Strategy
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Assembly Line Balance Balance.
MBA 8452 Systems and Operations Management
Quantitative Review II
Facility Layout Technical Note 6.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 5 Facilities To Accompany.
Scheduling (Part II) Mohd Zaidan bin Abdul Aziz B
Line Balancing Problem
Assembly Line Balancing
Assembly Line Balancing
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
1 Facility Layout: Manufacturing and Services Manufacturing and Services Chapter 5, Part B.
Process Layout Chapter 7 July 20, 2005.
Customer and Market Focus Information and Analysis
Line Balancing. Example problem - Golf Club mfg/assy firm Customer demand requires production volume of 24 finished clubs in an 8 hour shift Customer.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Assembly Line Balancing Introduction to Industrial Engineering.
Assembly Line Balancing
Operations Fall 2015 Bruce Duggan Providence University College.
Technical Note 6 Facility Layout
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Slide 0 of 96 Manufacturing Facility Layout. Slide 1 of 96 Basic Layout Forms Process Product Cellular Fixed position Hybrid.
EXAMPLE 2 Plot points in a coordinate plane
Dr. Ron Lembke.  Situation: Assembly-line production.  Many tasks must be performed, and the sequence is flexible  Parts at each station same time.
Chapter 7 Server Management Policies –User accounts –Groups Rights and permissions Examples.
40 Minutes Left.
Lesson 5.5 Use Inequalities in a Triangle. Theorem 5.10 A B C 8 5 IF AB > BC, THEN C > A The angle opposite the longest side is the largest angle; pattern.
Minutes Left:
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved.
8.2: Digraphs (continue). Digraphs Example 1) TASKSTIMETASKS BEFORE A3 B10C,F,G C2A D4G E5C F8A,H G7H H5.
Facility Layout Objectives of Facility Layout Basic Types
AS Maths Decision Paper January 2011 Model Answers.
Revision BUSI 2301 B. Averaging methods b). Moving average - sample problem Compute a three-period moving average forecast for period 6, given the demand.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Manufacturing Processes
ΟΡΓΑΝΩΣΗ ΚΑΙ ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ 3 Ο ΜΑΘΗΜΑ. ΟΙ ΜΕΓΑΛΕΣ ΕΠΙΧΕΙΡΗΣΕΙΣ Η δημιουργία μεγάλων επιχειρήσεων είναι ένα από τα χαρακτηριστικά του 20 ου αιώνα.
Supply Chain Customer Order Decoupling Point
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Additional line balancing notes
Analytical Tools for Process Analysis and Improvement
1. Draw the precedence diagram.
Nelson Mandela Quotes.
Facility Layout Chapter 6A.
EDD 581 Innovative Education- -snaptutorial.com
Assembly line balancing
Plenary: rules of indices
FACILITY LAYOUT Facility layout means:
3 Assembly Line Balancing CHAPTER Arranged by
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
15 seconds left 30 seconds left 3 minutes left 2 minutes left 1 minute
Example: If line AB is parallel to line CD and s is parallel to t, find the measure of all the angles when m< 1 = 100°. Justify your answers. t
ОПЕРАТИВНА ПРОГРАМА “ИНОВАЦИИ И КОНКУРЕНТОСПОСОБНОСТ“ „Подобряване на производствения капацитет в МСП“
5.2 Section 5.1 – Increasing and Decreasing Functions
Process Analysis “If you cannot describe what you are doing as a process, you do not know what you are doing.” W.E. Deming.
Solving Equations 3x+7 –7 13 –7 =.
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
Do not use a calculator for the following!!.
Maximum and Minimum Points
Presentation transcript:

AB EH C D F G I 10 Min Example Balance for 3 units/hour and compute theoretical min number of stations (primary: longest task time; secondary: most followers)

Example of Line Balancing: Step 2: Determine Cycle Time Question: Suppose we only have demand for 3 units per hour. What would our cycle time have to be? Answer: Therefore, the maximum task time allowed in a single station is 20 minutes

Example of Line Balancing: Step 3: Determine Theoretical Minimum Number of Workstations Question: What is the theoretical minimum number of workstations for this problem? Answer:

Example of Line Balancing: Step 4: Rules To Follow for Loading Workstations A number of simple rules have been proposed for assigning tasks to work stations. –Assign Tasks With The Most Following Tasks First –Assign Tasks With the Longest Task Time First For this example, we’ll use –Primary: Assign tasks in order of the longest operating time –Secondary (tie-breaking): Assign tasks in order of the largest number of following tasks.

Example of Line Balancing: Step 5: Make assignments AB C D F E G H I TaskTask Time (minutes) Followers A108 B115 C53 D43 E122 F32 G71 H111 I30 WorkstationTime Left EligibleWill FitAssignIdle Time I20 10 A B,E A-A- A-A- 10 II20 8 B,E B,H B,E - E-E- 8 III B,H C,D,H D,H B,H C,D D BCDBCD - IV F,H F G F,H F - HF-HF- 6 V20 13 GIGI GIGI GIGI 10