February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.

Slides:



Advertisements
Similar presentations
Supervisory Control & Data Acquisition DAQ Networking.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
SPEAR Upgrade – EPICS Status
EUT 1040 Lecture 10: Programmable Logic Controllers.
2D Detectors DAQ Overview 2D detectors are organized as tiles providing 10G Ethernet serialized portions of the full.
STARLight PDR 3 Oct ‘01I.1 Miller STARLight Control Module Design Ryan Miller STARLight Electrical Engineer (734)
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 26/4/2004 Multi-channel Data Acquisition System Final_A Presentation.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Hall D Solenoid Controls. Rockwell Software Overview RSLogix5000 (PLC Programming) RSLinx Classic (Rockwell software/hardware interface) FactoryTalk (GUI.
EtherCAT (Beckhoff) for advanced LIGO
ELI: Electronic Timing System (ETS) at Facility Level E L I – B L – – P R E – B.
EtherCAT Driver for Remote I/O James Rowland, Ronaldo Mercado and Nick Rees.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
ERL Differential Current System Status Peter Cameron with contributions from Michelle Wilinski and Christophe DeFrance (Bergoz) 17 Sep 07.
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
Readout & Controls Update DAQ: Baseline Architecture DCS: Architecture (first round) August 23, 2001 Klaus Honscheid, OSU.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
UCN-nEDM DAQ DAQ and Slow Control L.Lee 1 July 3, 2013.
MICE Controls Progress 15 th March 2007 * Controls Infrastructure * Controls network * Target * Superconducting Solenoid * Magnet Power Supplies * Hydrogen.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
November 18, 2002Richard Talaga1 Target Hall Instrumentation NuMI Neutrino Beam Devices Instrumentation Review Instrumentation &Communication Overview.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007 Status of Alba Controls.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
September 19-20, 2007 A.Zaltsman EBIS RF Systems RF System Overview Alex Zaltsman September 19-20, 2007 DOE Annual Review.
Adrian Oates Daresbury Laboratory ALICE Control System July 08.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
FLASH Free Electron Laser in Hamburg Status of the FLASH Free Electron Laser Control System Kay Rehlich DESY Content: Introduction Architecture Future.
Steve Lewis Gas Attenuator 11 December Instrumentation & Controls Steve Lewis 11 December 2006 LCLS Gas Attenuator Preliminary.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
Industrial Controls Engineering Department First CERN PXI Users Group meeting 19 th October 2011 – Hubert REYMOND – EN/ICE 1.
The recent history and current state of the linac control system Tom Himel Dec 1,
October, 2009 Internal Review Beam Instrumentation David Gassner.
February 17-18, 2010 R&D ERL Z EYNEP A LTINBAS R&D ERL M ACHINE P ROTECTION S YSTEM Z EYNEP A LTINBAS February 17-18, 2010 M ACHINE P ROTECTION S YSTEM.
Current NML Layout.  Overall length of building is 72M 3 cryomodules with feed and end cans ~40M Not enough room for both photoinjector and downstream.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
Diagnostic & Control Status
Beam diagnostics from GSI
Current Status of IPM-Linac Control System
PLC-based control systems at SOLEIL - ICALEPCS 2017
ATF/ATF2 Control System
Facility for Rare Isotope Beam (FRIB) PLC Control Systems Introduction
MVL-supported Virtual Instrument Specifications
Magnet Safety System for NA61/Shine
PLC’s Are ... Similar to a Microcontroller: Microprocessor Based
UITF Conduct of Operations Review
Presentation transcript:

February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls

February 17-18, 2010 R&D ERL James Jamilkowski 2 Infrastructure Based on full-featured, familiar RHIC control system Parameter pages Video display Graphing/charting/logging tools Save/restore Alarm display Sequenced operation tool Extensive reuse of S/W, H/W “Synoptic” interactive displays –Preferred over alarm display scheme

February 17-18, 2010 R&D ERL James Jamilkowski 3 Infrastructure (Details) 2 LINUX servers (one dedicated to laser) 3 multi-screen operator workstations Share C-AD file systems and archive storage 3 VMEbus "crates" –XNTP time synchronization, millisecond accuracy b/w hosts –Standard analog, digital I/O, scaler, PLC interface modules Ethernet/GPIB "bridge" Terminal servers for RS-232/RS-485

February 17-18, 2010 R&D ERL James Jamilkowski 4 Safety, Cryo, Vacuum Chipmunks interfaced via VMEbus scalers –C-AD standard Cryo "CRISP" system interfaced via ethernet –C-AD standard Vacuum –Valves controlled via ControlLogix PLC –Gauges/Pumps interfaced via RS-232 –Also C-AD standards

February 17-18, 2010 R&D ERL James Jamilkowski 5 Magnet Power Supply Controls Substantially similar to existing systems, e.g. EBIS First operational use will be during G5 test run IE Power 35V/320A Main Magnet Power Supply –VME-based power supply controller, C-AD standard 34 15V/10A Danfysik, 5 Kepco 50V/20A bipolar power supplies –RS-232/RS-485 via terminal server 38 BiRa 50V bipolar power supplies –VME-based ADC/DAC/digital I/O, C-AD standard

February 17-18, 2010 R&D ERL James Jamilkowski 6 HPRF 50 kW (cavity) system used during cavity tests –Analog measurements  Commercial GPIB CW RF power meter  16-channel VMEbus 100KHz ADC –Mechanical tuners tested 1 MW (gun) power supply controlled by AB PLC –Interfaced via VME-based PLC 5/40

February 17-18, 2010 R&D ERL James Jamilkowski 7 LLRF Newly designed LLRF controller Platform already controlling RHIC RF, EBIS under commissioning Implementation effort required for ERL Modular design based on XILINX FPGA Software integrated with existing VME infrastructure

February 17-18, 2010 R&D ERL James Jamilkowski 8 Laser/Photocathode Development effort required for C-AD controls Basic laser control via vendor-supplied PC Cross correlation, shaping, transport, attenuation –Linear and rotational motion control working in lab Power/shape measurements –Photodiodes via VMEbus ADC –Commercial laser power meter working in lab –IEEE1394 cameras (used elsewhere at C-AD)

February 17-18, 2010 R&D ERL James Jamilkowski 9 Beam Diagnostics(1) BPM's (Libera) – new, but familiar –LINUX software interface to ethernet capable COTS modules Beam Losses – mostly ready –Pin diodes sampled with VMEbus scaler card –Ion Chambers sampled with GPIB digital ammeters  LINUX software interface –PMT sampling options:  C-AD standard VMEbus modules, or  XILINX platform with ADC cards  TTL outputs for interlock system

February 17-18, 2010 R&D ERL James Jamilkowski 10 Beam Diagnostics(2) Current Transformers (Bergoz) – new, development required –VMEbus 100kHz ADC using external triggers  integrating transformer signal  injection/dump differential signal –TTL output for interlock system Halo Scrapers/Wire Scanner – new, but familiar –VME-based motor control, ADC, digital I/O, LINUX interface for Keithley electrometer readout via GPIB (Halo Scraper) Beam Dump Temperature – C-AD standard –PLC thermocouple interface  TTL output for interlock system  LINUX software data acquisition

February 17-18, 2010 R&D ERL James Jamilkowski 11 Beam Diagnostics(3) Faraday Cups – C-AD standard –VMEbus 100kHz ADC using external triggers Beam Profiles (Radiabeam) – new, but familiar –LINUX software for 3-motor lens control system via RS-232 –VMEbus digital I/O for plunging mechanism, lens, and light control Pepper Pot (Radiabeam) – new, but familiar –VME-based motor control for slit plunging mechanism (X2) Laser-wire Scanner – new, future option –PCI DAQ module with LabView and LINUX software interface Streak Camera (Hamamatsu) – new, future option –LINUX bridge to Windows/PCI-GPIB hardware interface

February 17-18, 2010 R&D ERL James Jamilkowski 12 Beam Diagnostics(4) Camera frame grabbing infrastructure –IEEE1394 Firewire –C-AD standard (ex. Beam Profiles / Emittance) –New applications:  Synchrotron Light  IR Video  Emittance from Pepper Pot  Streak Camera & Laser-wire Scanner –10Hz video via Gigabit Ethernet demonstrated

February 17-18, 2010 R&D ERL James Jamilkowski 13 Machine Protection Per input interlock control and master reset capability Timestamps on input changes of state for troubleshooting LabView and Simple Network Access Protocol (SNAP) connect CRiO hardware with Linux user interface –Communication scheme is in use elsewhere at C-AD In use... Room for expansion