Distribution Lightning Protection Pilot Projects Reliability Engineering Team Lightning Arrester Initiative Presented by Tim Constanzo, PE.

Slides:



Advertisements
Similar presentations
Electric Power Utility Motor Case Study Diagnostics & Resolution Power utility contracted to perform off-line circuit and insulation testing of critical.
Advertisements

1S25 Arc Fault Monitor. 1S25 Arc Fault Monitor 1S25 Arc Fault Monitor Electrical arc short circuits in metal clad switchgear may occur for many different.
Inspection & Preventive maintenance of breakers
1 CNS/GSS/2008/M1 1 Module 1 Basic Terminologies and Characteristics of Switchgear.
Lightning Arresters and Their Application
RMM Systems, LLC By Sam Rietta RMM Systems, LLC is a manufacturer's representative firm focused on providing value added sales solutions by providing.
The Power Grid ELEC 403 The Citadel Mark McKinney.
Arrester Application bringing it all together!
The Challenges of Converting Arrester Standards to Understandable Utility Standards Michael K. Champagne, P.E. Member, IEEE-SPDC.
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
Feeder Maintenance Program. The purpose of the Cooperative is to provide safe, reliable, low-cost energy services in fiscally responsible partnership.
Startup Training – TPS3 15. Siemens TPS3 Startup Training 2 Topics Covered  Visual Inspections  Verify environmental requirements are met  TPS3 15.
April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
Smart battery technology for a global environment Louie Lane #104 Reno, Nevada
Universal College of Engineering & Technology
©2004 Fluke Corporation Insulation Resistance Testing 1 Insulation Resistance Testing.
Substations. Substations Chapter 4 Substations Major types of equipment found in most transmission and distribution substations with their purpose,
Single Phase IEC and EATS Distribution Transformers
AIRCRAFT WIRE DEGRADATION STUDY 6 November 2002 Joe KurekNick Kirincich Multi-Disciplined Engineer Section Manager, Wiring Design (317) (317)
Unit-3 SUBSTATIONS.
THE ELECTRIC SUB STATION
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
Rulemaking PacifiCorp Responses to ALJ Ruling May 26, 2015.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
1 Entergy Transmission Asset Preservation Department 2004 Objectives Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
Reliability Engineering
Total System Reliability Program for Underground Electrical Distribution Networks Essay Shu, Ph.D Winnipeg, MB Sep
POWER SYSTEM PROTECTION
SWER New Zealand & Australian Experience
A PRACTICAL TRAINING SEMINAR ON PLCC
Lesson 6 Voltage Do we need to MEASURE it? OR Do we need to DETECT it?
Electrical Fire in Terminal Room at Collider-Accelerator Department Relay-Fire Investigation Committee
Utility Engineers, PC.  Generation  Transmission  Distribution.
Review of TADS Data for 2012 Voltage Class Name Metric AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error.
EECE 887 Distribution System Engineering CHAPTER 1 Power Delivery Systems.
POWER HOUSE.
What is POWERGRID??? The Power Grid Corporation of India Limited (POWERGRID), is an Indian state-owned electric utilities company headquartered in Gurgaon,
Submitted to: Submitted by:
Jesus A. Guerra, P.E. Distribution System Reliability CenterPoint Energy SWEDE 2011.
Introduction to switchgears
NERC Lessons Learned Summary LLs Published in September 2015.
A Presentation On 132 KV GSS BEHROR
Submitted to: Submitted by:
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
132KV GSS PIPAR CITY JODHPUR
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Submitted To:- Submitted By:- Mr.
M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
LIGHTENING PROTECTION USING LFA-M
AUTOMATIC CIRCUIT RECLOSER
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
Sub Station.
SUB-STATIONS.
Chapter # 25 Sub-Stations risemark.pbworks.com.
Predictive-Based Maintenance Strategy
3-Phase Transformer Construction, Principal, Working, Operation Advantages Over 1-Phase Transformer Introduction Advatages Construction Principal Working.
35kV Assessment SWEDE 2007 May 10, 2007.
Basics of electrical engineering
ELECTRICAL INSTALLATION AND MAINTENANCE (EIM) 5 INSTALL ELECTRICAL PROTECTIVE DEVICES FOR DISTRIBUTION, POWER, LIGHTING, AUXILIARY, LIGHTNING PROTECTION.
Engineering Project Cable Management.
3-Phase Transformer Construction, Principal, Working, Operation Advantages Over 1-Phase Transformer Introduction Advatages Construction Principal Working.
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Presentation transcript:

Distribution Lightning Protection Pilot Projects Reliability Engineering Team Lightning Arrester Initiative Presented by Tim Constanzo, PE

Where it all started Corporate initiative to improve reliability Reliability Summit Root cause analysis methodology  Relay philosophy/settings  Maintenance, allocation of resources  Backbone initiative (distribution system design)  Lightning arresters (LA’s)

Problem Statement Lightning arresters (LAs) are believed to be the cause of an unacceptable frequency and duration of customer interruptions and outages.

Probing Questions How bad is it? Why/how are LA’s failing? How effective is current application of LA’s on system?

How bad is it? Estimated population: 39,000 35kV line LAs 300,000 35kV equipment LAs Total 35kV LAs: 339,000 35kV LAs issued for maintenance FYE 2005: 500 Ratio of replacements to total population: 0.15% Circuit outages in FYE 2005 LA related: 135 LA related rate of circuit outages: 8.7%

How/why are LA’s failing? Fishbone and Pareto graphs/Root Cause LA failure categories:  Proper isolator operation (not a failure!)  Design/Manufacturing defects  Installation Design/Practice  Thermal Runaway

Normal Operation Isolator designed to operate when capacity of LA is exceeded Lightning TOV No outage caused Loss of protection until replaced Reduced BIL/CFO until replaced

LA Design/Manufacturing Issues Poor design/manufacturing Poor seals Voids under sheds Recommendation: Revise LA standards to eliminate designs with poor seal and voids under sheds.

Failure due to moisture ingress

Installation Design Current installation design/practice Long leads wrapping around primary Reduced Insulation/BIL after isolator operates Recommendations: Shorter leads Eliminate insulating bracket

Tracking Failure of Bracket

Installation T & E Option

Thermal Runaway Cause: Aging zinc oxide block material Moisture ingress (most common) Effect: High leakage current Marginalized MCOV Elevated temperature Recommendations: IR patrol removal when +10°C/18°F above ambient

Current Application of LA’s Line arresters 27 kV/22 kV MCOV (Heavy Duty) ¼-mile spacing, all phases Equipment arresters 27 kV/22 kV MCOV (Heavy Duty) All equipment

Evaluating LA Application TFlash modeling cases: Baseline: no arresters ¼ mile, 3 phases Every pole, center phase only Every pole, raised center phase only Every pole, 3 phases

TFlash Results

Conclusions/Recommendations Discontinue current application: “¼-mile” Let attrition remove line LAs Maintain LAs protecting equipment Apply only when/where lightning is an issue Circuits requiring higher reliability High exposure Use higher voltage rated LA (27 -> 30 kV)

Lightning Arrestor Initiative Going Forward T&E lightning arrestor installation arrangements Static wire (no arresters) LA’s center phase only, every pole Further modeling in TFlash Evaluate costs of various arrangements

Questions?