Module 10 PS M4110 Components. Module Objectives: Describe the indicators on the front panel of the PS-4110 array Demonstrate how to replace a Disk Drive,

Slides:



Advertisements
Similar presentations
Mobile Lab Basics. Each of our Mobile Labs contains 24 netbooks for your students to use in the classroom. The charging cart provides wireless internet.
Advertisements

An Example of a Portable Computing Device. A PDA as an Example of a Portable Computing Device Recharger and connection to computer for replication Recharger.
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
Opening the Chassis There are two screws at the top of the system and three at the base that should be removed to enable to (Delete) removal of the rear.
Color Printer Training
BBP11 Training BBP11-34L.
Installation of Peripherals. I. Backup Battery.
1 All In One Training ASI ECS G11 Assembly. Getting Started Lay the system face down making sure not to damage screen.
5.3 Installing the blade server in a BladeCenter unit.
PowerEdge M-Series CMC Management
SGI ® Company Proprietary SGI ® Modular InfiniteStorage Sales Deck – V4 – Feb 2013 An evolutionary new compute & storage platform exclusive to SGI.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
Unit Test Calibration Training
THE M-9 9MM SERVICE PISTOL
SGI Confidential Copan 400 Installation. SGI Confidential Installation Overview The approximate minimum time to complete this procedure is.
© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. Introducing the HP ProLiant.
System X 3500 Fan Cage Removal Here are some basic steps and helpful hints.
How to Perform Preventive Maintenance of the Personal Computer Properly Shut Down of the Computer Properly Shut Down of the Computer Unplug all Connection.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
SGI Confidential Shelf Hardware. SGI Confidential Shelf Front View Canister Status LEDs Canister 0Canister 7 Canister Position Number Canister.
How to Build A Computer By John A. Saiz. Materials Required Tools Screw driver Screw driver Tweezers Tweezers Flashlight FlashlightHardware PC Case PC.
Intelligent Storage Systems
Module 8 Installation & Setup M1000e Chassis
+ USING THE POWER CHARGER AND BATTERY MINI-DV CAMCORDER Connect the charger to the power cord Attach the battery to the charger Plug it in and watch for.
© 2009 EMC Corporation. All rights reserved. Intelligent Storage Systems Module 1.4.
Chapter 3 Computer Assembly. 3. Introduction Assembling computers is a large part of a technician's job. This Chapter will teach you how to work in a.
+ USING THE POWER CHARGER AND BATTERY MINI-DV CAMCORDER Connect the charger to the power cord Attach the battery to the charger Plug it in and watch for.
We Design It Replacing Hard Drives Tutorial Seven Easy Steps By: James Landon Carie Jackson Odetta Rodriguez Michelle R. Person Miceala Vega.
5.3 HS23 Blade Server. The HS23 blade server is a dual CPU socket blade running Intel´s new Xeon® processor, the E5-2600, and is the first IBM BladeCenter.
Module 9 PS-M4110 Overview <Place supporting graphic here>
Copyright © 2014 EMC Corporation. All Rights Reserved. Advanced Storage Concepts Upon completion of this module, you should be able to: Describe LUN Migration.
Hardware Overview Iomega Network Storage LENOVO | EMC CONFIDENTIAL. ALL RIGHTS RESERVED. Storage for SMB and Distributed Enterprise PX SERIES.
10 Easy steps to building your computer By Chris Holzworth & Michael Barnett.
Guide to Linux Installation and Administration, 2e 1 Chapter 9 Preparing for Emergencies.
Repair Guide SMP-Series Products. page 2 Agenda Warning Product Disassembly ○ SMP-WEBPLUS ○ SMP-WEB / SMP-PRO2 ○ SMP-WEB3 / SMP-PRO3 SMP-WEB3N / SMP-PRO3N.
PC Assemble & Disassemble Trey, Josh, Jin-young. Step1. Checking PC Before performing disassemble, make sure the PC is working properly.
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
Module – 4 Intelligent storage system
Chapter 2 Working with Disks and Other Removable Media 2.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco PublicNew CCNA Jianxin Tang IT 1 V4.0 Ch3. Computer Assembly—Step by Step.
Computer Disassembly and Reassembly Presentation by: James Hinton, Derrick Sartain, and Steve Evans.
5.3 HS22 Install Specifics. Removing the blade server cover If the blade server is installed in a BladeCenter unit, remove it (see Removing the blade.
Rick Claus Sr. Technical Evangelist,
Service Manual. Cubi Overview The service manual instructs the installing and removing the mSATA, memory card, Wifi card and 2.5 inch HDD.
PRESENTATION. Parts of the PCOS (3) Operator LCD Screen with Counter (4) Printer Compartment (5) Transmission Port (9) “RETURN” Button (8) “CAST” Button.
The Complete Training/Knowledge Guide. Session 2: Phone Basics  Removing the Back Cover  Installing the Battery  Removing the Battery  Installing.
Information Systems Technology Ross Malaga A Copyright © 2005 Prentice Hall, Inc. A-1 INSIDE YOUR COMPUTER.
Ahmadu Bello Computer Repair Training Course 3: Assembling/Disassembling of a Laptop Computer By Suprix Technology Nigeria ( A.B.U.
1062m0656 between 10692m2192 DS/ICI/CIF EqualLogic PS6510E
Quick Start Guide ST30/ST32 Series mobile computer.
EonStor DS series disk arrays
E2800 Marco Deveronico All Flash or Hybrid system
WELCOME TO EVM WITH VVPAT TRAINING FOR ARO’S and STAFF
EonStor DS 1000.
PostBase Automatic Feeder Component Removal Service Training
ControlLogix Portfolio
EonStor DS 2000.
Fujitsu Training Documentation Hardware Installation
FlashBack-4 Training June 2014
Fujitsu Training Documentation Hardware Installation
Drive Enclosure for Gen 3 and Gen 4 Arrays
Heavy Duty Safety Switch Replacement Instructions for
Tips to upgrade RAM, SSD, and HDD in HP Omen 15. Intel Core i7 processor, GTX 10 series GPU, 16GB of RAM and solid storage functions configured in HP.
Installing the SIM CARD and Battery
Call to Fix Dell Printer Error Code
How to Perform Preventive Maintenance of the Personal Computer
1.11: Robot Controller.
Hard Drives & RAID PM Video 10:28
System 57 Gas Control System
Presentation transcript:

Module 10 PS M4110 Components

Module Objectives: Describe the indicators on the front panel of the PS-4110 array Demonstrate how to replace a Disk Drive, Control Module or Micro SD card Describe what an SED drive is and its benefits are.

Configuration

PS M4110 Front View Top Release Handle Power LED Blue – Good Amber - Fault Serial Ports Bottom Release Handle Drive LEDS

M4110 Top View Dual, hot-pluggable 10GbE controllers 4GB of memory per controller, Cache to Flash Design 1 x dedicated 10/100 management port – accessible via CMC 14x 2.5” 6Gb/s SAS disk drives 2.5” SAS Disks Controllers FrontBack Controller status LEDS

Controller Module microSD card access Active LED: - Green = active - Amber = secondary Power LED

PS M4110 Controller Type 13 Controller comprised of multiple boards: – Controller Module (Host and SAS cards combined as single unit) – FIOM (Fixed I/O Module, connects to chassis infrastructure) – Equallogic firmware with iDRAC emulation – 4GB Memory – Cache to Flash based memory backup

PS-M4110XS – Auto-tiering within an array Enables the performance of SSD with capacity of HDDs Mixture of SSD and spinning media within one array /member Automated data tiering within a member. Hot data placed on SSD 5 x 400GB SSD + 9 x 600GB 10K SAS HDD 7.4 TB capacity Automated data tiering within a member Optimizes Hot & Cold data placement

PS-M4110 Component Replacement

Identify Drives Drive Numbering 013 Top view Front

Identify Failed Drive Locate the failed drive

Replace a Drive 1. Remove the Bad Drive: Press the drive release button. 2. Fully open the drive release latch. 3. Remove the drive by the grabbing the drive sides. 4. Install the new drive: lift the drive release latch to its fully open position 5. Hold the drive by its carrier and insert the drive into an empty slot 6. When the drive is fully inserted as far as it can go, rotate the drive release latch to its fully closed position. 7. Push down on the latch until you hear and feel a click 3

Identify Type 13 Control Modules Top view Front CM 0 CM 1

Replace a Control Module 1. Remove the Control Module: Press the control module release button. 2. Fully open the control module release latch. 3. Remove the control module by the grabbing the sides. 4. Install the Control Module: Lift the control module release latch to its fully open position 5. Hold the control module by its carrier and insert it into the slot 6. When the control module is fully inserted as far as it can go push down on the latch until it clicks 3

MicroSD Card Replacement Procedure 1. Remove the control module from the array. 2. Remove the SD card from the control module. – Push the microSD card in its slot to release the spring mechanism. The microSD card will be partially ejected from the housing. – Gently pull the card straight out of the slot 3. Install the replacement SD card in the control module. – Align the microSD card so the arrow on the card points towards the microSD card slot in the control module – When correctly positioned, the notch on the card will correspond to the slot. – Firmly press the card into the slot until it clicks into place 4. Insert the control module into the array.

Self-Encrypting Disks (SED)

Self Encrypting Disks To identify a self encrypting disk a lock symbol will be on the label. SED drive model mixing is not supported. SED Label Non- SED Label

SED Disks To determine if all disks installed are SED – Login to the group – Select the member – Issue a “show” command

Self-Encrypting Disks (SEDs) States Unsecure – Encryption is not active on this disk. When shipped from the factory, drives are unsecured. Secure/Online – Encryption is active. Disk has been unlocked. When more than half the drives are present, they are secure and online. Secure/Offline – Encryption is active. Disk is locked. When powered off, failed, or stolen, drives are encrypted and locked so that data is not accessible.

Self-Encrypting Disks (SED) Encryption keys used to secure data on the disk Military-grade in real time Dell Equallogic uses AutoSED – Works at the array level › Administrator should ensure all members in group are deployed with SED – SEDs operate in an automatic fashion – If a drive is removed from a SED array its data is immediately locked

SED drives in GUI

Backup encryption keys

EqualLogic PS-M4110 Configurations PS-M4110EDrives – 14x 2.5”, 7,2K NL SAS 500GB or 1TB drives Up to 14TB per array, Up to 28TB per group inside blade chassis Up to 56TB, 2 groups inside blade chassis Controllers – 1 or 2, single or dual controller option PS-M4110XDrives – 14x2.5” 10K SAS 600GB or 900GB drives Up to 12.6 TB per array, Up to 25.5 TB per group inside blade chassis Up to 50.4 TB 2 groups inside blade chassis Controllers – 1 or 2, single or dual controller option PS-M4110XVDrives – 14x 2.5”, 15K SAS 300GB or 146 GB drives Up to 4.2TB per array, Up to 8.4TB per group inside blade chassis Up 16.8 TB, 2 groups inside blade chassis Controllers - 2, dual option only PS-M4110XSDrives – 9x 2.5”, 10K SAS 600GB drives and 5x 2.5” SSD 400GB drives Up to 7.4TB per array, Up to 14.8TB per group inside blade chassis Up 29.6TB, 2 groups inside blade chassis Controllers - 2, dual option only

PS M4110 Up to four PS-M4110 array’s can be installed in one M1000e chassis The PS-M4110 is limited to 2 PS-M4110 arrays per group If there are four PS-M4110s in a chassis there will be at least two groups

Module Summary Now that you have completed this module you should be able to: – Describe the indicators on the front panel of the PS-4110 array – Demonstrate how to replace a Disk Drive, Control Module or Micro SD card – Describe what an SED drive is and its benefits are.

Questions?