Construction Contracts

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Construction Engineering 221
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Funds administration, also referred to as funds control, funds disbursement, funds management, and escrow, is a method that sureties use to offset the.
Bidding Requirements ACT 380. Objective Provide an overview of the bidding process, including documents included in the bidding requirements.
Nabil dmaidi1 Miller Act H Enacted in 1935 H Federal Contracts over $25,000 H Contractor shall provide Bonds H Performance Bonds in the amount to protect.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
1 MOSS ADAMS LLP | 1 Case Studies in Contract Close Out Audits May 2014.
Marcy Mealy Procurement Specialist CDBG Program
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
CIVL202 Construction Engineering I
Construction process Types of contracts Halmstad University Construction management Piotr Mazur Paulina Wawryca Paweł Bilski.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
PROCEDURES FOR SELECTING THE CONTRACTOR
1 CDBG Procurement Requirements For Local Officials.
Construction Engineering 221 Cost Estimating and Bidding.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
SURETY BONDS 101 The Basics of Bonding. Surety Bonds 4 A surety bond is an instrument under which one party guarantees to another that a third will perform.
Introductory to the “Basics” of Contract Types and Their Impact in the Management of Government Property Presented by: Fay K. Schulte, CPPM.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
State Auditor’s Office Change Order Pricing Practices Performance Audit of Eight Local Governments Puyallup City Council February 7, 2012 Chris Cortines,
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Construction Documents Review Questions. 1.The procurement (bidding) requirements are a.a part of the construction documents, but not the contract documents.
3/11/2003CVEN Maxwell1 Types of Contracts, Ownership, etc. Module Follows Halpin Chapter 5 Updated: March 11, 2003.
Construction Contracts and Project Delivery Methods
Warranties Review Questions. 1.The person who becomes secondarily liable for another’s debt or performance is called the: a.Guarantee b.Warrantor c.Guarantor.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
YUSUF OZ FATIH BOLUKBAS HUSEYIN ANIL KARABULUT. A contract is a legally binding agreement between two or more parties.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
Construction Documents ACT Objective To acquire a basic understanding of the contents and relationship between the documents which make up the.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
TYPES OF CONTRACTS.
1 1 T HE C ONSTRUCTION E NVIRONMENT Objective: Overview of the environment within which the planning and control of a construction project must proceed.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Phases Review Questions.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Chapter 13 Estimates for Remodeling Work
Conditions of the Contract Review Questions. 1.General Conditions and Supplementary Conditions make up the: a.Specifications b.Bidding Requirements c.Conditions.
LAW for Business and Personal Use © 2012 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Measurement and Payment
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Division 1 – General Requirements Review Questions.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
CHANGING PROJECT DELIVERY SYSTEMS
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
PROJECT DELIVERY METHODS
What Small and Emerging Contractors Need to Know Understanding Funds Administration © Copyright 2017 NASBP.
Types of contract selection based upon following:
CHANGING PROJECT DELIVERY SYSTEMS
Understanding Bonding Requirements
Request for Proposal & Proposal
Speaker: Sarah Chambers, Esq. Claims Counsel| Professional Liability
PROJECT DELIVERY METHODS
Construction Contracts
Construction Contract Negotiation
Presentation transcript:

Construction Contracts Review Questions

1. What are the necessary parts of a construction contract? Identification of the parties and the parties make a promise that constitutes an offer. Both parties sign the contract indicating they understand and agree. Both parties receive consideration and the parties have the legal authority to negotiate a contract. All of the above

1. What are the necessary parts of a construction contract? Identification of the parties and the parties make a promise that constitutes an offer. Both parties sign the contract indicating they understand and agree. Both parties receive consideration and the parties have the legal authority to negotiate a contract. All of the above

2. The construction agreement is Part of the contract documents which defines the relationships and obligations that exist between the owner and contractor. Always written by a lawyer to cover the specific situation. Must be on the A101 – Standard Form of Agreement Between Owner and Contractor. Part of the contract documents which defines the relationship and obligations that exist between the owner and the design professional.

2. The construction agreement is Part of the contract documents which defines the relationships and obligations that exist between the owner and contractor. Always written by a lawyer to cover the specific situation. Must be on the A101 – Standard Form of Agreement Between Owner and Contractor. Part of the contract documents which defines the relationship and obligations that exist between the owner and the design professional.

3. Which best describes the tripartite relationship of the Owner, the Contractor and the A/E? The Owner has a contract with the A/E who has a contract with the Contractor. The Owner has a contract with the Contractor who also has a contract with the A/E. The Contractor has a contract with the Owner who also has a contract with the A/E. The Contractor has a contract with the A/E who also has a contract with the Owner.

3. Which best describes the tripartite relationship of the Owner, the Contractor and the A/E? The Owner has a contract with the A/E who has a contract with the Contractor. The Owner has a contract with the Contractor who also has a contract with the A/E. The Contractor has a contract with the Owner who also has a contract with the A/E. The Contractor has a contract with the A/E who also has a contract with the Owner.

The Owner The Contractor The A/E Who is responsible for the technical sufficiency of the design and construction documents? The Owner The Contractor The A/E

The Owner The Contractor The A/E Who is responsible for the technical sufficiency of the design and construction documents? The Owner The Contractor The A/E

5. In Competitive Bidding The Owner is not required to select the lowest price for the project. The Owner may select someone other than the lowest bidder on publicly funded projects. The Owner negotiates the prices with the Contractors. Bidding is open to any bidder demonstrating the financial ability to perform the work.

5. In Competitive Bidding The Owner is required to select the lowest price for the project. The Owner may select someone other than the lowest bidder on publicly funded projects. The Owner negotiates the prices with the Contractors. Bidding is open to any bidder demonstrating the financial ability to perform the work.

6. The Single Prime Contract Is the most common form of construction contract. Is the most complex type of contract to administer. Is one in which the Owner contracts directly with the subcontractors. Is where the owner divides the work between several contractors.

6. The Single Prime Contract Is the most common form of construction contract. Is the most complex type of contract to administer. Is one in which the Owner contracts directly with the subcontractors. Is where the owner divides the work between several contrators.

7. In the Multiple Prime Contract The Contractor has an agreement with the Owner and with the A/E. The A/E will prepare a separate set of bidding documents for each contract. The contracts are usually negotiated. Is not normally used in “fast track” construction.

7. In the Multiple Prime Contract The Contractor has an agreement with the Owner and with the A/E. The A/E will prepare a separate set of bidding documents for each contract. The contracts are usually negotiated. Is not normally used in “fast track” construction.

8. When the Owner has the A/E “within house” The construction contract type is called “design – build”. The construction contract type is called “construction management”. The construction contract type is called “owner – builder”. The construction contract type is called “subcontract”

8. When the Owner has the A/E “within house” The construction contract type is called “design – build”. The construction contract type is called “construction management”. The construction contract type is called “owner – builder”. The construction contract type is called “subcontract”

9. Lump Sum Contracts Are negotiated between the owner and the contractor on competitively bid projects. Are where the contractor is reimbursed for actual costs of labor and materials. Are typically used on engineering projects. Are the simplest method of stating the cost of an entire contract.

9. Lump Sum Contracts Are negotiated between the owner and the contractor on competitively bid projects. Are where the contractor is reimbursed for actual costs of labor and materials. Are typically used on engineering projects. Are the simplest method of stating the cost of an entire contract.

10. The construction subcontracts Are the contracts between the owner and the contractor. Are the contracts between the owner and the construction manager. Are the contracts between the contractor and the A/E. Are the contracts between the contractor and the subcontractors.

10. The construction subcontracts Are the contracts between the owner and the contractor. Are the contracts between the owner and the construction manager. Are the contracts between the contractor and the A/E. Are the contracts between the contractor and the subcontractors.

11. A disadvantage of using standardized agreement forms is: Familiarity of the forms. Uniformity of terminology. Legal precedents interpreting the documents. May not meet specific project requirements. Recognized customs resulting from longtime use.

11. A disadvantage of using standardized agreement forms is: Familiarity of the forms. Uniformity of terminology. Legal precedents interpreting the documents. May not meet specific project requirements. Recognized customs resulting from longtime use.

12. The Agreement: Establishes how the contract will be administered. Provides for requirements unique to a specific project. Protects the labor force if the Contractor fails to meet his obligations. Defines relationships and obligations between the Owner and the Contractor.

12. The Agreement: Establishes how the contract will be administered. Provides for requirements unique to a specific project. Protects the labor force if the Contractor fails to meet his obligations. Defines relationships and obligations between the Owner and the Contractor.

Architect/Engineer and Contractor. Owner and Subcontractors. 13. The contractual relationship governed by the Conditions of the Contract is between: Owner and Contractor. Architect/Engineer and Contractor. Owner and Subcontractors. Architect/Engineer and Subcontractors.

Architect/Engineer and Contractor. Owner and Subcontractors. 13. The contractual relationship governed by the Conditions of the Contract is between: Owner and Contractor. Architect/Engineer and Contractor. Owner and Subcontractors. Architect/Engineer and Subcontractors.

Single-Prime. Multiple-Prime. Turn-Key. Competitive Bidding. 14. What contract type is usually the simplest type of construction contract to administer? Single-Prime. Multiple-Prime. Turn-Key. Competitive Bidding.

Single-Prime. Multiple-Prime. Turn-Key. Competitive Bidding. 14. What contract type is usually the simplest type of construction contract to administer? Single-Prime. Multiple-Prime. Turn-Key. Competitive Bidding.

15. Direct selection or negotiated contract method: Is generally allowed for public sector projects. Is used when the Architect hires the Contractor. Does not involve the method of payment. Usually is used by the Owner with advice from the A/E.

15. Direct selection or negotiated contract method: Is generally allowed for public sector projects. Is used when the Architect hires the Contractor. Does not involve the method of payment. Usually is used by the Owner with advice from the A/E.

16. The types of contracts include all of the following EXCEPT: Project Management Design/Build Turn-Key Owner/Builder Construction Management

16. The types of contracts include all of the following EXCEPT: Project Management Design/Build Turn-Key Owner/Builder Construction Management

The A/E and an Owner directly. 17. In a Design/Build project, there is a contractual relationship established between: The Owner and single party; typically a Contractor associated with the A/E. The A/E and a single party; typically a Contractor associated with an Owner. The Owner and several other separate parties; typically various subcontractors. The A/E and an Owner directly.

The A/E and an Owner directly. 17. In a Design/Build project, there is a contractual relationship established between: The Owner and single party; typically a Contractor associated with the A/E. The A/E and a single party; typically a Contractor associated with an Owner. The Owner and several other separate parties; typically various subcontractors. The A/E and an Owner directly.

Negotiated contracts with pre-approved bidders. Direct selection. 18. For public sector projects, which method is normally followed for contract award? Bidding to a pre-selected group with contract award to the lowest bidder(s). Competitive bidding. Negotiated contracts with pre-approved bidders. Direct selection.

Negotiated contracts with pre-approved bidders. Direct selection. 18. For public sector projects, which method is normally followed for contract award? Bidding to a preselected group with contract award to the lowest bidder(s). Competitive bidding. Negotiated contracts with pre-approved bidders. Direct selection.

19. The Construction Manager is normally hired by: The A/E The Owner The A/E and Owner Public agencies

19. The Construction Manager is normally hired by: The A/E The Owner The A/E and Owner Public agencies

Multiple prime contracts Single Contract Procurement contract 20. The form of contract usually most difficult to administer during construction is: Multiple prime contracts Single Contract Procurement contract Negotiated contract

Multiple prime contracts Single Contract Procurement contract 20. The form of contract usually most difficult to administer during construction is: Multiple prime contracts Single Contract Procurement contract Negotiated contract

Contractor and Subcontractors Contractor and A/E Contractor 21. In the single-prime contract situation, the Owner has a contractual relationship with which of the following: A/E Contractor and Subcontractors Contractor and A/E Contractor

Contractor and Subcontractors Contractor and A/E Contractor 21. In the single-prime contract situation, the Owner has a contractual relationship with which of the following: A/E Contractor and Subcontractors Contractor and A/E Contractor

22. Multiple-prime contracts are normally a part of: Turn-key construction Phased Construction Long duration construction projects Fast track construction

22. Multiple-prime contracts are normally a part of: Turn-key construction Phased Construction Long duration construction projects Fast track construction

23. Typically, a Construction Manager is hired by the Owner to: Perform the construction Oversee and administer the construction Instruct the A/E during the design phase of a project Assist the Owner during the bidding phase of the project and to perform the construction.

23. Typically, a Construction Manager is hired by the Owner to: Perform the construction Oversee and administer the construction Instruct the A/E during the design phase of a project Assist the Owner during the bidding phase of the project and to perform the construction.

24. A cost-plus-fee may include: Cost of material plus an additional fee for overhead and profit. A guaranteed maximum price. Shared savings. Incentives for early completion. All of the above.

24. A cost-plus-fee may include: Cost of material plus an additional fee for overhead and profit. A guaranteed maximum price. Shared savings. Incentives for early completion. All of the above.

25. The objective of the competitive bidding process is: To ensure that all qualified bidders may submit bids on public work projects. To ensure that the public works contracts are awarded to the lowest bidders. To ensure that the intent of the governing public laws are maintained in the awarding of contracts. To ensure that the cost of the project is reasonable and consistent with the prevailing conditions in the construction industry.

25. The objective of the competitive bidding process is: To ensure that all qualified bidders may submit bids on public work projects. To ensure that the public works contracts are awarded to the lowest bidders. To ensure that the intent of the governing public laws are maintained in the awarding of contracts. To ensure that the cost of the project is reasonable and consistent with the prevailing conditions in the construction industry.

26. A unit price contract is used when: Extent of work cannot be fully determined or where actual quantities cannot be accurately calculated. Extent of work is know, but the Owner desires a unit cost for portions of the work. It is anticipated that bidders will not examine soil bearing reports prior to submitting bid. Bidding quantities of equipment.

26. A unit price contract is used when: Extent of work cannot be fully determined or where actual quantities cannot be accurately calculated. Extent of work is know, but the Owner desires a unit cost for portions of the work. It is anticipated that bidders will not examine soil bearing reports prior to submitting bid. Bidding quantities of equipment.

Answers 14. a 15. d 16. c 17. a b a c d e d a c b 10. d 11. d