A Bowman Microturbine at the Holiday Inn January 20, 2004 Brian Inglett Presents SIMMAX ENERGY.

Slides:



Advertisements
Similar presentations
Energy Conservation Energy Management.
Advertisements

The New Technology To Save Primary Energy And To Reduce CO2 Emission
California Energy Commission 1 Energy Workshops for W&WW Agencies UTILITY STRATEGIES FOR SHIFTING PEAK DEMAND PERIOD WATER & ENERGY USE REGIONAL STRATEGIES:
The SunAirCool Eco Power Station
New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
Exhaust Heat Recovery Systems
1 AEE PIEDMONT CHAPTER Smart CHP Solutions for kWe.
Elliott Microturbines Absorption Chiller Integrated System Development
Jan Buijk Biogas Fuelled Cogeneration Systems.
1 Experience with IR 70kW installations on LFG, will current emission performance be enough? January 26, 2005.
Co-generation Cogeneration is an attractive option for facilities with high electric rates and buildings that consume large amounts of hot water and electricity.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Capture of Heat Energy From Diesel Engine After Cooler Circuit (2006 Annual Report) Mark Teitzel Alaska Village Energy Corporation
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
“Energy Efficiency Guide for Industry in Asia”
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
RETScreen® Energy Efficiency Projects
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Prospero LLC December 2, 2004 Connecticut’s Energy Future Financing Sustainable Energy.
Encouraging Green Power: Cooperation between the Private Sector and Government Avi Brenmiller, May
BALTIC ELECTRICITY REGIONAL INITIATIVE Riga, 24 April, 2009 LATEST UPDATE IN LATVIA Ainārs Meņģelsons Public Utilities Commission.
Over 60,000 Honda MCHP Units at work in Japan
Katrina Pielli U.S. Environmental Protection Agency CHP Partnership
Presentation Outline Introduction CHP Analysis Electrical Analysis Acoustical Analysis Thermal Storage Analysis System Optimization Analysis Conclusion.
Take A Load Off, Texas SM is provided by Oncor Electric Delivery LLC as part of the company’s commitment to reduce energy consumption and demand. Frontier.
Domestic Electric Heating Chris Davis Marketing Manager, Glen Dimplex UK Electrex – 17 th May 2006.
1 Microturbine CHP Application in the Hotel Business DOE Microturbine Application Workshop Embassy Suites Brea January 20, 2004.
Central PA Chapter: Association of Energy Engineers Americas Operation Services: CCHP Presentation & Tour March 26, 2015 Doug Ferguson.
WAL-MART STORES, INC. ENERGY EFFICIENCY AND DEMAND RESPONSE.
Don ’ t blow off steam- microturbines make cheap, clean energy from waste heat Presented By: Ahmad Sabri El-Sayed Nagy By: Lindsay Audin Web Address:
California's three large IOUs collectively served 12.7% of their 2007 retail electricity sales with renewable power. – Pacific Gas and Electric (PG&E)
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
PLS WORKSHOP September 18, 2012 Greg Miller Ice Energy Terry Andrews CALMAC Manufacturing Corp.
Overview of Distributed Generation Technologies June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Distributed Generation Programs, Incentives and Interconnections Ian Loughran, P.Eng. DSM Program Leader Renewable Energy Programs
The New Wave in Energy Tony Davies Executive Chairman.
CONFIDENTIAL AND PROPRIETARY Invenergy’s Views on Cogeneration Opportunities Presented to: April 30, 2015.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
Pg. 1 Energy Intelligence Program Monitor your industrial facility and save energy! Tool that provides real-time feedback to help you manage energy in.
Phoenix Convention Center Phoenix, Arizona Combined Heat & Power – The Basics Integrated Energy Combined Heat & Power (Making a Comeback) Bob Albertini.
Cheri Cousens, P.E. – Executive Director September 15, 2010.
JSC “OGK-6” 2009 Financial Results (IFRS) April, 2010.
Fitting GeoExchange Heating and Cooling to Your Building Denis Tanguay President & CEO Canadian GeoExchange Coalition High-Rise Power: Is renewable energy.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Demand Response How to make money by not using electricity?
2008 All Source Participants WorkshopJune 19, Participants Workshop All Source RFO June 19, 2008.
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
Technology details, potential and experiences of Trigeneration
0 The Problem – Centralized generation is often dirty, costs are increasing and T&D is vulnerable to natural and man-made interruption – Distributed renewables.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
Geothermal Heating System in the City of Bijeljina Bijeljina, City of Bijeljina City of Bijeljina Bosnia and Herzegovina.
International Newspaper Group 2008 Gannett’s Green Campaign.
California Energy Commission Transmission Interconnection and the California Energy Commission Generator Licensing Process PANC 2010 Annual Seminar San.
CHP & DG METERING & MONITORING IN NEW YORK STATE CASE STUDIES AND IMPLEMENTATIONS Presented By: STEPHEN STONE, PE DSM ENGINEERING ASSOCIATES, PC
Wisconsin’s Focus on Energy - Program Update John Nicol, PE Industrial Program Manager.
SELF-GENERATION INCENTIVE PROGRAM (SGIP) Website:
Kansas City International Airport Michael Glasker, P.E. George Butler Associates, Inc.
Biomass Cogeneration Facility Savannah River Site Aiken, SC
The Dominican Republic What can NSG do for You? 2014 Native Sun Group, Inc Meadowgrass Dr, Suite 101 Colorado Springs, CO Office: (719)
VM TECHNOLOGIES DESIGN. DEVELOP. DELIVER
State of Virginia Energy Managers 2016 Leigh Anne Ratlitf Account Management and Sales Integrated Demand Resources (iDR)
Elliott Microturbines Absorption Chiller Integrated System Development
Exhaust Heat Recovery Systems
Caspian Company مجری پروژه های نیروگاهی ، احداث مولد های مقیاس کوچک و سیستم های CCHP & CHP ohen staufen ring-20- koln – germany.
Energy Savings Projects
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Plug & Play CHP? Is Your Pocket About to be Picked?
Energy Management Introduction Rantharu Attanayake BSc. (Eng), MSc, MBA EE – Energy Management Mobile :
Presentation transcript:

A Bowman Microturbine at the Holiday Inn January 20, 2004 Brian Inglett Presents SIMMAX ENERGY

SIMMAX Group of Companies SIMMAX Corporation –Simmax Energy, Simson Maxwell, ADCO Power –Develops, builds, owns and operates generation facilities –Provides Cogeneration/ Generation equipment sales and service –Experts in international power plant construction –In operation for over 60 years

SIMMAX Group of Companies SIMMAX Energy –“Simple Solutions - Maximum Energy” –Own and operate 14 DG sites in Southern CA 5 Microturbine sites including Bowman, Ingersoll-Rand, and Turbec –In the business of selling ENERGY - not equipment TransAlta –SIMMAX financed by TransAlta –TransAlta Corporation traded on the NYSE under the ticker TAC $5 Billion in Assets and over 9,000 MW of generation

Organization Original Project development and funding was provided by Sempra Energy Connections Simmax acquired all Sempra Energy Connection sites in February 2003 Sempra Energy Connections Project Manger – Alex Kim Engineering was provided by All Temperatures Controlled

Site Description Location – La Mirada, California 80kW Bowman Microturbine Peak shaving – Operating hours from 8:00am to 9:30pm Waste heat used for laundry and domestic hot water Electricity used for peak shaving

Pictures

Costs Engineering Costs$9,700 Permitting Costs$300 Microturbine$80,000 Fluid Cooler$5,000 Construction Cost$70,000 Electrical Interconnection Cost$500 Gas Interconnection Cost$5,200 Heat Exchanger$16,000 Misc Costs$27,300 Total Costs$214,000

Costs Continued Previous owner spent an estimated $214,000 dollars on installation costs. A significant amount of this cost was spent on “learning the business.” There were change orders and costs associated with correcting design oversights.

Costs Continued 100% Hindsight More attention to the thermal load than the electrical load Application must be able to use most of the heat Size of hot water loop must be considered for thermal reaction time Applications may not be “plug-n-play” Proper engineering on the front end is an absolute must

Cost Continued 50 th Installation Standardize fleet of generators being used Standardize the type of pumps, valves, heat exchangers and so on Build off of previous engineering experience to reduce engineering costs

Electrical Performance Hours of operation to December 31, 2002 is 9,800 hours. Average Electrical Performance is approximately 23% (Net). Electrical Power delivered to load is 78kW. Parasitic Losses are 5.5kW. Power Quality is approximately 2.0% or less THD per phase.

Improvements VFD used to replace the thermal switch control on the dump radiator Circulation pumps added to both laundry and domestic hot water loops to improve waste heat recovery.

Thermal Performance Measured maximum of 450 kBTU/hr (maximum heat from microturbine is 500 kBTU/hr). The site consumes an average of 375 kBTU/hr. Delta T across heat exchangers is 10 to 20 degrees F. This varies as a function of site usage. Average Thermal Efficiency is measured at 44%. Expected Peak Total System Efficiency (Electrical + Thermal) is 75%.

O&M Performance Availability is 85.28% Average number of hours the unit is down per month is 7 hours. Annual O&M costs are difficult to estimate outside of the warranty. Annual PM costs are estimated at $3,000 annually. Unscheduled failures can impact O&M costs significantly. Spare part availability and cost are current industry issues.

Institutional Experience Site developed by Sempra Energy Connections. Permitting issues can cause the project to slip schedule. CARB (California Air Resources Board) requirements for January 1, 2003 compliance is an issue in the California market. The electrical interconnection has not been an issue to date.

Supplier Support Bowman Power’s Technical Support is very good. Trained Distributor Technical Support is still developing. Spare parts availability is an issue in their availability to have parts shipped from the manufacturer to the end user. (There is a limited stock of spare parts locally.)

Supplier Support Continued Bowman has performed very well in supporting and resolving all warranty issues.

General Experience Improvements for future installations: Packaging for smaller footprints Integrating the fuel gas compressor into the package UL certification CARB certification

General Experience Continued Future market development will be driven by economics. Existing transmission grid is heavily loaded. Distributed generation can relieve a portion of this loading. Lowered installation and maintenance costs. R&D or development should continue to support complimentary technologies. Absorption Chilling

Questions?

Contact Information Web Site: Mail: Brian Inglett Operations Manager Simmax Energy 2124 Main Street, Suite 195 Huntington Beach, CA, Contact Information: Phone: (714) Fax: (714)