Value and Cost of Distributed Generation ACC Staff Workshop #1 – May 7, 2014 Docket No. E-00000J-14-0023 DG Valuation ─ Lessons from the APS Distributed.

Slides:



Advertisements
Similar presentations
Copyright © 2014 Clean Power Research, L.L.C Prepared by Clean Power Research May 7, 2014 Prepared for Arizona Corporation Commission Cost Causation and.
Advertisements

Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
How Technology will make Renewable Energy Competitive 10/17/2013
Meeting with Rep. _______________ Solar Industry Representatives May 5, 2010.
Cost of Services Pricing Enables a Net Zero Energy World © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
Considerations in Determining the Role for Solar in Missouri’s State Energy Plan Presented by Rick Hunter, Board Chair for the Missouri Solar Energy Industry.
Capacity Valuation.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Distributed Generation Valuation from a Ratemaking Perspective Presentation to the ACC Workshop Tom Beach, Principal Crossborder Energy Consultant to the.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 14 Energy Efficiency Module 14: DEMAND-SIDE MANAGEMENT.
Value of Solar Tariff Will it work in Washington State? Ahlmahz Negash
Welcome and Introductions CoServ Presentation & Member Input.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
Avoided Costs of Generation
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Distributed Energy Resources The Energy Challenge of the 21 st Century.
1 WPL Regulatory Update Scott R. Smith Director, Regulatory Affairs.
OVERVIEW OF ISSUES DR AND AMI HELP SOLVE Dr. Eric Woychik Executive Consultant, Strategy Integration, LLC APSC Workshop on DR and AMI.
“Demand Response: Completing the Link Between Wholesale and Retail Pricing” Paul Crumrine Director, Regulatory Strategies & Services Institute for Regulatory.
Strategic Planning for DSM in a Community-owned Utility Presented by Shu-Sun Kwan & Ed Arguello Colorado Springs Utilities 2005 APPA Engineering & Operations.
Rate Design Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker &
Joint Agency Workshop on the Governor’s Energy Efficiency Goals CEC IEPR Workshop on 2030 Efficiency Goals Panel Topic Codes and Existing Buildings Monday.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
Investing Our Energy In You Traverse City Light & Power Electric Generation TCL&P Study Session December 1, 2009.
VIRTUAL NET METERING AND LOCAL NETWORK CHARGES IN AUSTRALIA: AN UPDATE Smart Future Cities Conference 2015, Newcastle, NSW, October 1 st 2015.
Selected Geothermal Resource Topics from a Utility Perspective Geothermal Power Generation Workshop May 11, 2003 Ken Dragoon PacifiCorp
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
National Energy Technology Laboratory Driving Innovation ♦ Delivering Results Steve Bossart, Moderator October, 2015 USAEE Pittsburgh North American Conference.
Electric Capacity Market Performance with Generation Investment and Renewables Cynthia Bothwell Benjamin Hobbs Johns Hopkins University Work Supported.
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Helping Utilities Make Smart Solar Decisions Distributed Solar Transactions: NEM and Beyond MEC Conference October 2013.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Draft Seventh Power Plan Meets RTF. Key Finding: Least Cost Resource Strategies Rely on Conservation and Demand Response to Meet Nearly All Forecast Growth.
Overview of Energy Policy Act of 2005 A Review of Implementation issues in New Hampshire.
Cost-Effectiveness Analysis of BGE’s DSM Programs Marshall Keneipp, PE Summit Blue Consulting, LLC Prepared for: Energy Efficiency and Conservation Stakeholders.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Integrated Resource Plan 2016
The Net Metering Controversy
Presented to the NARUC 2013 Winter Meeting
Distributed Solar Energy California´s Experience
2500 R Midtown Sacramento Municipal Utility District
Grid Modernization in New Hampshire
Wind Development & Policy Options
Presentation transcript:

Value and Cost of Distributed Generation ACC Staff Workshop #1 – May 7, 2014 Docket No. E-00000J DG Valuation ─ Lessons from the APS Distributed Energy and Net Metering Technical Conference Bob Davis Principal and Executive Consultant nFront Consulting LLC

Conference Overview APS Distributed Energy and Net Metering Technical Conference

22 ACC decision ordered that “APS shall conduct a multi- session technical conference to evaluate the costs and benefits of Distributed Renewable Energy and Net Metering” Six workshops and forums held February 21, 2013 through May 28, 2013 Over 180 registered stakeholders and presenters included representatives from local and national solar industries, environmental groups, consumer groups, regulatory interests, and electric utilities Presentations provided by content experts enlisted by the stakeholders, APS and the conference Facilitator Cost-benefit matrix developed summarizing stakeholder perspectives on costs and benefits of DE Facilitator’s Report issued July 8, 2013

33 APS Distributed Energy and Net Metering Technical Conference Major topics covered:  DE and net metering activities and regulatory trends throughout the U.S.  Concepts of electric utility retail ratemaking  Review of APS rates and potential cost shifting caused by solar DE  Electric utility avoided cost concepts and APS planning for solar DE  Solar DE evaluation models and approaches  Stakeholder studies of costs and benefits of net metering and DE costs and benefits for APS  SAIC update of the 2009 R. W. Beck Study of DE value

44 DE Cost and Benefit Categories Stakeholder Agreement Stakeholders, including APS, reached agreement on categories of costs and benefits that should be considered when evaluating DE Avoided utility costs (benefits):  Fuel and purchased power  Variable operations and maintenance  Environmental compliance  Avoided generation capacity investment  Fixed operation and maintenance costs for avoided generation capacity  Electric system losses  Avoided transmission and distribution investments Incurred utility costs:  Utility integration costs  Program administration costs

55 DE Cost and Benefit Categories Stakeholder Disagreement Fuel hedging Market price mitigation Cost of ancillary services Value of ancillary services provided by DE RES avoided costs Non-compliance environmental impacts Decommissioning costs Ratepayer cross- subsidization Utility systems costs Grid security Marginal value of reduced water consumption Health effects Economic development and jobs Civic engagement / conservation awareness Energy subsidies Technology synergies Ratepayer / consumer interest Stakeholders could not agree that the following should be included when computing utility benefits of DE

66 DE Costs and Benefits – Methodologies Stakeholders generally did not reach agreement on methodologies for computing costs and benefits (even when agreeing on categories) Computation of avoided generation capital and fixed O&M costs  Generic or avoided planned facilities  Incremental capacity reduction or size of avoided facilities  Timing (current year or date of avoided facilities) Computation of transmission and distribution avoided facilities/costs  Average embedded costs/rates or avoided planned facilities  Size and timing (similar to generation avoided costs)  System-wide assessment or analysis of specific circuits

77 DE Costs and Benefits – Methodologies (cont.) Stakeholders generally did not reach agreement on methodologies for computing costs and benefits (even when agreeing on categories) Avoided energy costs (simulated dispatch or market price) Electric system losses (average or marginal losses) Integration costs / ancillary services:  Incremental operating costs to respond to intermittent solar DE production  Value of voltage control from solar DE Treatment of avoided costs in current APS rates:  APS rates set through embedded not marginal cost treatment  Life-cycle benefits produced by DE installations are not permitted in rate setting

Technical Considerations DG Valuation

99 Comparison of Value of Solar DE Presented at APS DE/NEM Technical Conference Value of Solar for APS System – Expected / Base Case (¢/kWh) Cost-Benefit Category SAIC Update Nominal $ Crossborder Study 2014 $ Avoided Fuel, Var. O&M, Purchase Power Avoided Emission Costs Avoided Gen. Capacity, Fixed O&M, NG Trans Avoided Transmission Costs Avoided Distribution Costs Renewable Benefits n/a 4.5 Integration Cost n/a Total Value of Solar DE

10 Comparison of Value of Solar DE (cont.) Differences in Assumptions and Methodology Avoided Cost Crossborder StudySAIC Update All CategoriesProjected 20 year levelized costSingle year avoided cost Generation Energy Costs Market energy cost (blend of CT and CC energy costs) APS generation simulation Emission Costs Does not include CO2 costsIncludes avoided CO2 costs Generation Capacity Costs ELCC at 50%, 15% capacity reserves, avoided ancillary services ELCC at 30% (2020) and 21% (2025), includes capacity reserves Transmission Facility Cost Assumes marginal cost of transmission all years, 50% ELCC Small deferred expansion project in 2025 Distribution Facility Cost Assumes marginal cost of distribution all years, 50% ELCC No deferred expansion projects Renewable Benefits Includes incremental value of RPS, portfolio diversity, grid security, etc. No incremental RPS benefits

11 Technical Modeling Issues Effective Load Carrying Capability (ELCC) is expected to decline with additional DE/DG installations  ELCC is specific to the DE/DG technology being added  Capacity reserves should be added only if ELCC approach does not already encompass impact on reserves Avoided energy cost can be less than the average operating cost of CT and CC resources  Other lower-cost resources can contribute to a utility’s marginal costs (e.g., coal generation, purchased power)  Marginal operating costs of generating units are less than average operating costs  Significant DE/DG implementations can introduce inefficiencies in utility operations

12 Technical Modeling Issues (cont.) Avoided transmission and distribution costs require detailed study  Specific expansion/upgrade projects should be considered (do projects exist that can be deferred or avoided)  T&D facility costs should be segregated costs that can be avoided (e.g., wires) and those that cannot (e.g., metering)  ELCC or Peak Load Reduction (PLR) for T&D should be evaluated by feeder or line  System reliability and security must be considered (the impact of DE/DG intermittency at a feeder level should be evaluated)  Voltage control and other distributed grid benefits of DE/DG should be investigated

13 Coincidence of Solar DE Shape with Utility Loads

14 Dependable Capacity Diminishes with Increasing Solar DE Penetration

15 Dependable Capacity Diminishes with Increasing Solar DE Penetration

16 Dependable Capacity Diminishes with Increasing Solar DE Penetration

17 Dependable Capacity Diminishes with Increasing Solar DE Penetration

18 Dependable Capacity Diminishes with Increasing Solar DE Penetration

19 Dependable Capacity Diminishes with Increasing Solar DE Penetration

20 Dependable Capacity Diminishes with Increasing Solar DE Penetration

21 Dependable Capacity Diminishes with Increasing Solar DE Penetration

22 ELCC Decreases with Increasing Solar DE Penetration Expected Penetratio n in 2025

23 Rate Design Considerations One size does not fit all  Costs and benefits of DE/DG will vary by technology and application  Rate design, whether NEM or “value of” tariffs, need to accommodate different DE/DG technologies DE/DG impacts some areas of utility operations and costs more than others  Rates (or offsets) should be matched to the value received from DE/DG  Fixed and variable costs avoided through DE/DG are more readily assigned through energy and demand rates  Unbundled rates permit more direct assignment of DE/DG benefits Incremental impacts of DE/DG may need to be considered  Future DE/DG installations may reduce utility fixed costs less than installations made today (due to lower ELCC)  Rate design will need to consider whether to treat DE/DG customers on an average or incremental basis