Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12.

Slides:



Advertisements
Similar presentations
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Advertisements

Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
JIT, TPS, and Lean Operations
Lean Systems Defined Just-in-time (JIT): an older name for lean systems Toyota Production System (TPS): another name for lean systems, specifically as.
Just-In-Time and Lean Systems
Operations Management Just-in-Time Systems Supplement 12
Just-in-time.
Just-In-Time Philosophy
Beni Asllani University of Tennessee at Chattanooga
Operations Management
Just-In-Time “Eliminate Waste”.
Just-in-Time and Lean Operations
Chapter 7 – Just-in-Time and Lean Systems Operations Management by R. Dan Reid & Nada R. Sander s 2 nd Edition © Wiley 2005 PowerPoint Presentation by.
Just-in-Time and Lean Operations
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 15 Just-In-Time Systems.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. OPIM 310 –Lecture #8 Just-In-Time.
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
1 Lean Thinking MGMT Lean Thinking A philosophy Principles Practices For the design, operation, management, control and continuous improvement.
CHAPTER 14 Just-In-Time Systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Lean Systems Operations Management Chapter 16 Roberta Russell.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Operations Management
JIT and Lean Operations
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Chapter 7, Lean Thinking and Lean Systems
Alissa Brink Gabriela Iasevoli Jason Oesterle Joey Tamburo
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 15 JIT and Lean Operations.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
Materials + Machine Time + Labor = Manufactured Goods Materials + Machine Time + Labor = Manufactured Goods.
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Just-in-Time Manufacturing. A. INTRODUCTION Why “Just-in-Time” manufacturing ? Why “Just-in-Time” manufacturing ? No large capital outlays required. No.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J Operations Management Just-in-Time and Lean Systems Chapter 16.
© 1997 Prentice-Hall, Inc Principles of Operations Management Just-In-Time Systems Chapter 11.
Just-in-Time and Lean Production Systems
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S12-1 Operations.
Manufacturing.  Manufacturing is all about converting raw material into consumer or industrial products.  A firms manufacturing competency is based.
Just-In-Time & Lean Systems
JIT and Lean Operations
PRODUCTION & OPERATIONS MANAGEMENT Module II JIT & LEAN PRODUCTION Prof. A.Das, MIMTS.
Just-in-Time and Lean Systems
Companies must provide customers with world-class quality, delivery and service. Customers won’t accept anything less. The globalization of markets means.
The philosophy of JIT can be traced back to Henry Ford, but formalized JIT originated in Japan as the Toyota Production System. W. Edwards Deming’s lesson.
Just in time manufacturing
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
1 Slides used in class may be different from slides in student pack Chapter 12 Just-in-Time and Lean Systems  JIT Defined  The Japanese Approach to Productivity.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
Lean Production.
13-1 Learning Objectives  Explain what is meant by the term lean operations system.  List each of the goals of JIT and explain its importance.  List.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Operations Fall 2015 Bruce Duggan Providence University College.
Reid & Sanders, Operations Management © Wiley 2002 Just-In-Time Systems 7 C H A P T E R.
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Just In Time ….. Just in Time Philosophy Salient features  The notion of waste in any operating system  JIT as a philosophy of elimination of waste.
Operations Management JIT & Lean Systems
Best Performing Consulting Organization by “JIT & Lean Manufacturing” Adding Value In Totality !!
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
LEAN OPERATIONS PROVIDE PRODUCTS OR SERVICES IN RIGHT QUANTITY OF RIGHT QUALITY AND AT RIGHT TIME.
Inputs and Outputs to Aggregate Production Planning
Pull Manufacturing and Just In Time
Just-In-Time and Lean Production
Just-in-Time and Lean Operations
Inputs and Outputs to APP
Presentation transcript:

Operations Management BA 301 – Spring 2003 Just-in-Time Systems Supplement 12

Who developed “Just-in Time”? What we know today as “Just-in-Time” is known in Japan as the “Toyota Production System”. The developers at Toyota were: 1. Taiichi Ohno – Shop Manager & VP 2. Eiji Toyoda – President 3. Shigeo Shingo - Consultant

Management philosophy of continuous and forced problem solving The production system is intentionally stressed in order to identify problems Supplies and components are ‘pulled’ through system to arrive where they are needed when they are needed. What is Just-in-Time today?

JIT Systems JIT systems were originally designed to reduce inventory levels at Toyota Motor Company. Toyoda understood that the Japanese were short on: –Capital to finance inventory –Storage space for inventory Toyoda launched a campaign to “eliminate waste” and inventory was the primary contributor to the “waste”.

Attacks waste –Anything not adding value to the product From the customer’s perspective Exposes problems and bottlenecks caused by variability –Deviation from optimum Achieves streamlined production –By reducing inventory What Does Just-in-Time Do?

Inventory Waiting Transportation Inefficient processing Over Production Unnecessary motion Product defects © 1995 Corel Corp. Types of Waste

The Ten Elements of JIT 1. Workers are cross-trained to use small, general- purpose machines. 2. Small general purpose machines are grouped into “cellular layouts” to process a “family” of parts. 3. Pull Production System produces parts and sub- assemblies only when needed by the next “customer”. This was designed after a US Supermarket. 4. Kanban Production Control – Workers are signaled to produce a fixed quantity for their customer by a signal (kanban). 5. Small-Lot Production – Required because of restrictions on both space and financial capital. Stressed system and exposed problems which were then solved.

The Ten Elements of JIT 6. Quick Setups – In order to produce in small-lots, machines have to be changed over frequently. Shingo’s “SMED” 7. Uniform Production Levels – Some type of each automobile is made each day and the system can be adjusted just before it begins. 8. Quality at the Source – Workers produce in small lots and inspect their own output. They are also empowered to halt the production process (Jidoka) when they discover problems. 9. Total Productive Maintenance – An advancement over “breakdown or preventive maintenance”. 10. Supplier Networks – Develop long-term relationships with a small number of suppliers, who are located near the manufacturing facility and practice JIT themselves.

Traditional View: inventory exists in case problems arise JIT objective: Eliminate inventory JIT requires –Small lot sizes (“order sizes”) –Low setup time –Containers for fixed number of parts JIT inventory: Minimum inventory to keep system running Inventory

Scrap Work in process inventory level (hides problems) Unreliable Vendors Capacity Imbalances Lowering Inventory Attacks “Waste”

Scrap Reducing inventory reveals problems so they can be solved. Unreliable Vendors Capacity Imbalances WIP Lowering Inventory Attacks Waste

Scrap Reducing inventory reveals problems so they can be solved. Unreliable Vendors Capacity Imbalances WIP Lowering Inventory Reduces Waste

Reducing Inventory results in Streamlined Production Flow with JIT Traditional Flow Customers Suppliers Customers Suppliers Production Process (stream of water) Inventory (stagnant ponds) Material (water in stream)

JIT Inventory Tactics Reduce the level of work-in-process (WIP) inventory by: Reducing lot size (How much you fabricate each time) But this will cost setup costs to increase unless you are able to: Reduce setup time

Shigeo Shingo Toyota Motor Company Toyota Camry front left doors: D = 300,000 Cost = $100 I = 25% WDPY = 300 d = 1,000 p = 4000 Setup time = 6 hours Setup labor cost = $500 per hour Calculate POQ and Annual Cost POQ = 9798 Annual Cost = $183,712 Shingo decides to attack “waste” by reducing WIP inventory Creates “SMED” process.

Steps to Reduce Setup Time: Shingo’s “Single Minute Exchange of Dies (SMED) Initial Setup Time Separate setup into preparation, and actual setup, doing as much as possible while the machine/ process is running (save 240 minutes) Move material closer and improve material handling (save 90 minutes) Standardize and improve tooling (save 20 minutes ) 360 min 120 min 30 min 10 min 5 min Use one-touch system to eliminate adjustments (save 10 minutes) One-touch system to minimize adjustments (save 5 min) Standardizing work procedures (save 2 min)) Step 1 Step 2 Step 3 Step 5 3 min Step 4

Shigeo Shingo Toyota Motor Company Using the “SMED” improvement process, Shingo reduced the setup time to three (3) minutes. What is the new POQ? 400 What is the new Annual Cost? $7,500 How much was saved on Toyota front left doors alone? $179,962

Toyota Camry - Front Left Doors Time Inventory Level Lot Size 9798 Lot Size 400 Old: Average inventory = 3674 New: Average inventory = 150 Average inventory = (Lot size)/2

Computer Motherboard Platform (A-62) D=3000/year; H=$5/unit/year; p=30; d=10 Based on a set up time of 2 hours and a labor cost of $100/hour, the set up cost is $200. The POQ was calculated to be 600 units. Average Inventory = 200 units Annual Inventory Holding Cost = $1000 Annual Set up Cost = $1000 Total Annual Costs = $2000 If Set up time could be reduced to 15 minutes, how much $ could be saved?

Computer Motherboard Platform (A-62) Calculate POQ with setup time =15 min. Setup cost = $25 POQ = sq rt ((2*3000*25)/(5*0.67))=212 Average Inventory = 141 Annual Inventory Holding Cost =$354 Annual Setup Cost =$354 Total Annual Cost =$708 Total Annual Savings =$1292