 Board of Regents - University of Wisconsin Six Sigma in Higher Education: UW Administrative Process Redesign Project Scott Converse University of Wisconsin.

Slides:



Advertisements
Similar presentations
Introducing, Launching QSEC: Innovative Statewide Educational Initiative In Quality Systems Quality Systems Education Collaboration Dr. John W. Sinn, Professor.
Advertisements

Service Process Improvement
Guide to Business Improvement Tools
Baldrige Performance Excellence Program | 2015
Lean Systems and Six Sigma Quality
Chapter 10 Quality Improvement.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
Lean Six Sigma: A Vision
1. 2 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
6 Sigma Presented by : Galing Priyatna Franky Mangihut Tua
Lean Six Sigma A Methodology for Cultural Change and Continuous Process Improvement (CPI)
Roadmap for Breakthrough Change
Quality Control and Improvement
Lean Sigma Overview and its Significance to Project Management Harjit Singh, PMP
Overview of Lean Six Sigma
Barry Murash MBBit Nortel 2007
Overview of DMAIC A Systematic Framework for Problem Solving
Quality Improvement: Problem Solving
Lean Six Sigma Black Belt Blended Learning Program Course Description Blended Learning FLEXIBLE: Class sessions can be 100% online or augmented with live.
Product Manufacturing CHEN 4470 – Process Design Practice Dr. Mario Richard Eden Department of Chemical Engineering Auburn University Lecture No. 22 –
© 2002 Systex Services Capability and Improvement - from Cpk to Six Sigma.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
Workshop A Performance Boosting Tools Reality Check: Are you a Lean, Mean Manufacturing Machine ? The Matrix: Performance Measurement System.
Total Quality Management. 2 A philosophy that involves everyone in an organization in a continual effort to improve quality and achieve customer satisfaction.
QUALITY These slides have been added to the standard MRU PM Cert materials and are made available to students who have attended my class. Robin Hornby.
Partnering and Collaborative Working An Introduction Dr Neil Jarrett.
Σ Six Sigma: Process Perfection Customer Satisfaction through Error Elimination.
CMMI Technology Conference and User Group November 2003 Experiences with Leveraging Six Sigma to Implement CMMI Levels 4 and 5 Jeff Facemire & Hortensia.
MTSU 1 TQM for Supply. MTSU 2 TQM for Supply What is supply management? How does it differ from operations management? How is the TQM implementation different.
Everyone Has A Role and Responsibility
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
ASQ Raleigh ASQ Raleigh Section 1113 Six Sigma SIG DMAIC Series.
Agenda Week 1 Define Day 1 Introductions & Agenda LSS Overview
 Name  Work experience  Background in continuous improvement activities  Expectations 1.
Problem Solving.
Radhakrishna.Thatavarti Six Sigma The Continuous Improvement Culture Presentation By Thatavarti Venkata RadhaKrishna
© 2001 Six Sigma Academy © 2003 Six Sigma Academy1 Champion Workshop Key Concepts.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Lean Six Sigma Tools and Techniques for Continuous Improvement Session Three (Best Practices Improvement Tools and Approaches) This product was funded.
1 SIX SIGMA "Delivering Tomorrow's Performance Today" AIR CDRE ABDUL WAHAB.
Total Quality Management. What is Quality? Quality is a relative concept. Quality is in the eye of the beholder Perfection Doing it right at the first.
Six Sigma by Aranyos Attila for MSc. Mérnök Informatika Production and Process Management class held by Vida Csaba.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
A Quick Review of the Components THE DMAIC CYCLE.
QUALITY MANAGEMENT/SYSTEMS
IENG 451 / 452 Exam Review: Six Sigma Philosophy Lectures 01 – 12
The DMAIC Method
Lean Six Sigma Road Map Improvement Process Road Map
Six-Sigma : DMAIC Cycle & Application
Statistical process control
Lunch Order Cycle Time Project Storyboard Bahama Bistro Example
Improving Existing Products & Services
Pick-Up Order Lead Time Project Storyboard The Bahama Bistro Sample Storyboard Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Chapter 2 Six Sigma Installation
Quality Certification
Workshop on Six Sigma Black Belt Training & Certification
Practical Assessment Project Template
DMAIC Project Template
Quality Improvement: Problem Solving
OPS/571 Operations Management
Managing Quality, Innovation and Knowledge
Quality Improvement: Problem Solving
Framework for Success: DMAIC
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Chapter 10 Quality Improvement.
OPEX DMAIC Routemap Slides
Lean-Green belt six sigma program
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

 Board of Regents - University of Wisconsin Six Sigma in Higher Education: UW Administrative Process Redesign Project Scott Converse University of Wisconsin – Madison June 12, 2008

 Board of Regents - University of Wisconsin Agenda My background in IT and Process Improvement What is Six Sigma What is the UW Administrative Process Redesign (APR) Initiative Examples of APR Six Sigma Projects Closing Thoughts

 Board of Regents - University of Wisconsin ITANA Six Sigma in Higher Education So … what’s a “sigma” and why do I need six of them?

 Board of Regents - University of Wisconsin Achieving Performance Improvement in Service Organizations The Recipe for Implementing Performance Improvement Efforts in Service Organizations Q x A = E Quality Methodology Acceptance And Support Effective Results Work-Out

 Board of Regents - University of Wisconsin Six Sigma Example Pizza Chain Missing Its Promise If a pizza chain promises delivery in 30 minutes or the pizza is free, what is the pizza delivery problem shown below? 0 minutes 30 minutes 60 minutes Delivery time Customer’s Pizza D = 40 minutes

 Board of Regents - University of Wisconsin Six Sigma Example After collecting additional data on the problem, the following histogram was created. Now how would you solve the pizza delivery problem, specifically: 1) What should the curve look like for these pizza outlets to be making money? 2) Which variables do we need data on to understand the problem—ranked in order of importance?

 Board of Regents - University of Wisconsin Six Sigma Example

 Board of Regents - University of Wisconsin Lead Time L/T –The time it takes one unit of production to move through a process or value stream - start to finish Cycle Time C/T –The time it takes to complete a sub-process or process within the value stream - start to finish Value Creating Time VCT –The time within a cycle where work is being done to create value to the customer L/T > C/T > VCT Customer-Based Metrics and Whitespace

 Board of Regents - University of Wisconsin White Space is the time between process steps White Space represents the greatest opportunity for improvement Reducing White Space is “neutral” to all parties Lead time improvement is best achieved through managing white space Whitespace

 Board of Regents - University of Wisconsin Whitespace Example Scott submits Travel Expense form Department Personnel Process Form Department Personnel Inspect/Approve Form Central Personnel Inspect/Approve Form Central Personnel Process Form Accounting Cuts Check Check Delivered or Mailed to Scott Scott Deposits Check Time = 0Time = 6 weeks

 Board of Regents - University of Wisconsin Converse’s Observations on Successful Process Improvement Initiatives 1.It’s a process problem not a people problem 2.Focus on the customer not the process 3.From problem to solution is more than 2 steps 4.Broken processes can’t be seen sitting at your office desk; Walk the process 5.Process problems speak out in the data; Unfortunately that data isn’t usually collected 6.Effective results require more than a solution; It requires user acceptance 7.Automation and technology are good but see #5 8.A focused, measurable problem goal is the light during a dark journey

 Board of Regents - University of Wisconsin Content Covered in APR Process Improvement Training Change Management Module Stakeholder Analysis Innovation and Value Process Improvement Methodologies Leadership Techniques Group Dynamics Force Field Analysis Change Resistance Factors Equity Analysis Reward and Recognition Systems Stress and Yerkes-Dodson Law Learning Curves Emotional Loss Models Change Management Models Campaign Strategy for Change SC=CC+V+U+S+RR>BB Define and Measure Module Six Sigma Overview Fathers of Quality Movement Process vs People COQ – Cost of Poor Quality Sigma quality levels TQM vs Six Sigma Process Selection Matrix Team Charters Stretch Goals VOC Analysis Kano Model CTQ Analysis Affinity Diagrams Flowcharting Process Mapping SIPOC Diagram Value Analysis Define and Measure Module (continued) Performance Metrics QFD Functional Activity Flowchart Ishikawa Diagrams Check Sheets Pareto Diagrams Multi-voting Fast cycle time analysis Traveler Discrete and Continuous Measures Data Stratification Gage R&R Variation Standard Deviation Central Tendency Measures Histograms Statistical Sampling Service, Time, and Queue Based Process Analysis Module Service vs. Manufacturing Variability Accommodation Planned Capacity Utilization Throughput/Lead Time Analysis L/T vs. C/T vs. VCT metrics Batching Systems Push vs. Pull Demand Systems Queuing Paths Customer Focused Time Based Metrics Six Sigma vs Lean Tools Product Family Categorization QxA=E Formula for Change Value Stream Mapping Service, Information, and Resource Channels Queuing Theory Models Server Capacity Utilization Process Analysis Module (continued) Wait Time and Length Calculations Process Capability Customer Specification Limits Normal Distributions Empirical Rule Shifting vs. Narrowing Process Curves Lean Wastes Standard Work Analyze, Improve, Control and Workout Module Root Cause Analysis Causal Analysis Five Why Technique OFAT Experimentation DOE Process Variation Analysis Scatter Plots Regression Analysis Creativity Models Brainstorming Techniques Design and Creativity Techniques Idea Generation FMEA Implementation Options Run Charts Common Cause vs Special Cause Control Limits vs Spec Limits Control Charts Standard Operating Procedures Sustaining Gains Focused Workout Technique Nominal Group Technique Consensus Building

 Board of Regents - University of Wisconsin APR Six Sigma Projects Transferring Funds from Foundation to Department Accounts –Checking vs Savings Account –Cycle Time Reduction –Accuracy, Float, Transparency Grant Award-Sub Award Process Access to IT Resources –New Employee –Transferring Employee –Exiting Employee

 Board of Regents - University of Wisconsin Q&A and Closing Thoughts Scott Converse University of Wisconsin – Madison School of Business -Executive Education Final Comments