Risk-Based Maintenance-Centered Certification Bureau Veritas - VeriSTAR Machinery 1828 - 1999 PClassification for the 21st Century PModern Approach PModern.

Slides:



Advertisements
Similar presentations
Ben Poblete HSE Manager / Senior Risk Management Specialist
Advertisements

Module N° 3 – ICAO SARPs related to safety management
Steve White Urban Water Council US Conference of Mayors
Lloyd’s Register Canada Ltd. DELEGATION – is it working? Bud Streeter President Lloyd’s Register Canada Ltd. Presented by: Marcel LaRoche Marine Manager.
Emergency Response Service IASST Safety Seminar September the 20 th 2010 Alexis CARAUX Head of Emergency Response Service.
Our Services. Services Vessel Inspection 1. Sale and Purchase 2. Condition Assessment 3. Pre-charter 4. On-Hire and Off Hire.
Crane Operations Objective
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
Overview Lesson 10,11 - Software Quality Assurance
Chapter 10 Information Systems Management. Agenda Information Systems Department Plan the Use of IT Manage Computing Infrastructure Manage Enterprise.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Class and Statutory Surveys
First Practice - Information Security Management System Implementation and ISO Certification.
PIPELINE ENGINEERING COURSES DISTANCE LEARNING 12 WEEKS DR. ESAM AM AL-MATOUQ.
David Warne Independent Manufacturing Consultant.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
Protection of knowledge in the shipbuilding industry Leading expertise for a safer world A Classification Society perspective Vaughan Pomeroy, Technical.
Classification Societies – Contribution to Martime Safety Gesa Heinacher-Lindemann LL.M., Legal Director.
Quality Management Systems P.Suriya Prakash Final Mech Vcet
Western Regional Gas Conference August 25, 2010 Simple, Handy, Risk-based Integrity Management Plan (SHRIMP)
Regulatory Update Ellen Leinfuss SVP, Life Sciences.
Torkel Soma 25. August 2010 Can safety culture be measured? DNV Solutions DNV contact person:
VeriSTAR Project Management Intoduction
Standards. What is a standard? What are the benefits of using a standard? What are the costs? Do the costs exceed the benefits?
Occupational Health and Safety
The Herald of Free Enterprise capsized 6 March 1987, moments after leaving the Belgian port of Zeebrugge, killing 193 passengers and crew. This was the.
From Research Prototype to Production
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
Industrial Engineering
Asher Etkin DOE Accelerator Safety Workshop August , 2009 DRAFT DOE STANDARD APPLICATION OF SAFETY INSTRUMENTED SYSTEMS USED AT DOE NON-REACTOR.
OH&S Plant Regulations make Good Business Sense Robert Enchelmaier Capability By Design Peter Kohler Robert Enchelmaier.
David Baglee Dr. David Baglee. School of Computing & Technology E: T: Reliability Centred Maintenance.
SAFETY MANAGEMENT SYSTEM Non Conformance Reporting
1 Russian Maritime Register of Shipping N.A. Reshetov Director General, Russian Maritime Register of Shipping Quality Shipping: XXI Century Standard Saint-Petersburg.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Water Resource Management Company (WRM) Ministry of Energy Iranian Approach to Dam Safety - Practice - Achievements - Future plans.
Kngreddykngreddy Marine Engineering Technology & Solutions Pvt. Ltd.
PSPC/Coating Technical File (CTF)
Predictive Maintenance Panel International Newspaper Group 19 September 2007 Kansas City, MO Joe Bowman - ING Chairperson.
Use of Fieldbus in safety related systems, an evaluation study of WorldFIP according to proven-in-use concept of IEC Jean Pierre Froidevaux WorldFIP.
Software Integrity and Cyber Security NAMEPA: Managing Change in a Changing World Jim Watson Division President & COO, Americas Division Management New.
ISO/IEC 27001:2013 Annex A.8 Asset management
RTI, MUMBAI / CH 81 FOLLOW UP PROCEDURES DAY 8 SESSION NO.3 (THEORY) BASED ON CHAPTER 8 PERFORMANCE AUDITING GUIDELINES.
FEDIAF Guide to Good Practice for the Manufacture of Safe Pet Food TRAINING PACKAGE Module VII Purchasing and delivery for the Manufacture of Safe Pet.
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
Quality Assurance and Risk Management Services, Inc. 
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
Title of Powerpoint Subhead Name of Presenter Title of Presenter, Company Date of Event Location of Event ©2015 American Bureau of Shipping. All rights.
LECTURE 7 AVIATION SAFETY & SECURITY
LEGISLATIVE REQUIREMENT & CONVENTION
REPAIR & MAINTENANCE Marina Zanne, M.Sc.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Wind Composite Services Group/WindCom
Project Quality Management
OH&S Plant Obligations make
Pharmaceutical Quality in the 21st Century
Failure Modes and Effects Analysis (FMEA)
Software Requirements
BACKGROUND 1987 Joint MSC/MEPC working group on:
Standards.
Cyber Security - tackling the risks involved
Unit I Module 3 - RCM Terminology and Concepts
Classification Societies
KICK-OFF Overview and thematic approach 19th of June 2017
Configuration Management
© Oxford University Press All rights reserved.
Presentation transcript:

Risk-Based Maintenance-Centered Certification

Bureau Veritas - VeriSTAR Machinery PClassification for the 21st Century PModern Approach PModern Techniques PRisk Analysis PSystems Auditing & Monitoring PClose Partnership PISM Code

Cost Benefits PCost-effective Surveying: PUn-necessary Dismantling Avoided PPossible Reduction in Off Hire Time PDynamic adjustment of: PMaintenance and Life Cycle Costs PEffective system for: PDamage Reporting and Trend Analysis PAdvice in New-buildings’ Design

Practical Benefits PImproved Safety of Crew, the Ship and the Environment PRisk Analysis of the Vessel as a System PDemonstration of Compliance with the ISM Code for Maintenance PIdentification of Critical Items - ISM Code PCloser liaison between Owner and Class PA step towards an Integrated Management Concept

Classification & the Owner’s Planned Maintenance System Risk Analysis: Significance Analysis Failure Mode Analysis ISM Code Damage Reporting & Trend Analysis VeriSTAR Machinery - Integrates

VeriSTAR Machinery - A New Concept PThe Concept: PA Shift from Prescriptive (Reactive) Approach to Goal-setting (Pro-active) Classification PA Shift from Final Inspection to Systems Analysis & Approval PA Living System: PPeriodic Review of the PMS PLearning from Experience (History Review) PAuditing and Monitoring of the Systems

Risk = Significance Probability VeriSTAR Machinery - Risk Management  - probability  - significance Modification Maintenance Combination

Maintenance Management

Ship Technical Information Ship Maintenance Program Risk Acceptable? YES NO Review (Owner, BV) of Maintenance, Use, or Design VeriSTAR Machinery - Initial Analysis

Ship Owner VSM - Initial Classification Procedure Technical Data Maintenance Plan Review of design, operation or maintenance Initial PMS Review Initial Audit Prepares data for the analysis Performs initial risk analysis

Initial Classification Procedure - Summary PRisk Analysis PReview of PMS PInitial audit PVerification of Chief Engineer’s Certificate PRevision of PMS

Ship Owner PMS Review Changes in the Maintenance Concept Exceptional Items Trends Analysis VSM - Maintenance of Classification Bureau Veritas’ Surveyor PMS Review Changes in the Maintenance Concept Exceptional Items Trends Analysis Bureau Veritas Surveyor Performance Monitoring Risk Analysis Review Confirmatory Survey Annual Audit

Maintenance of Classification - Summary PAnnual Shipboard Audit during Annual Surveys PPerformance Monitoring PRisk analysis review PConfirmatory surveys triggered by: PPerformance Monitoring PRisk analysis results PAudit of non-conformities PShip Specific Data Base - Trend Analysis

Software Modules Owner’s Maintenance Plan Ship’s Technical Data Technical Data and Maintenance Plan Maintenance Records Reliability Databases Manufacturer’s Databases Data (generic and specific) for analysis Analysis results and Maintenance Plan Integral Ships Database: - generic data - specific data Risk Analysis Software PMS Software Ship Modeling Software Data Broker Software Generic and Specific (application) data