COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and.

Slides:



Advertisements
Similar presentations
MANAGEMENT ACCOUNTING
Advertisements

Using Budgets for Planning and Coordination
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fourth Edition Wild, Shaw, and Chiappetta Fourth Edition McGraw-Hill/Irwin Copyright © 2011.
Financial and Managerial Accounting Wild, Shaw, and Chiappetta Fifth Edition Wild, Shaw, and Chiappetta Fifth Edition McGraw-Hill/Irwin Copyright © 2013.
Cost Management Chapter 10 Static and Flexible Budgets
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Operational Budgeting Chapter 22.
Foundations and Evolutions
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D., CPA Copyright.
Chapter9 Profit Planning.
OPERATIONAL BUDGETING
Profit Planning Chapter 9. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Planning and Control Planning -- involves developing objectives and.
Chapter 9 BUDGETING A budget is a formal written statement of management’s plans for a specified future time period, expressed in financial terms Control.
Functional and Activity-Based Budgeting
CHAPTER 10: STATIC AND FLEXIBLE BUDGETS Cost Management, Canadian Edition © John Wiley & Sons, 2009 Chapter 10: Static and Flexible Budgets Cost Management,
Master Budgeting Chapter 8
Lecture 5: Profit Planning (Budgeting)
6 - 1 Benefits of Budgeting Essentials of Effective Budgeting Master Budgetster Budget Budgeted Income Statement Cash Budget BudgetingBudgeting in a nonmanufac-
Profit Planning (Master Budgeting). Learning Objective 1 Understand why organizations budget and the processes they use to create budgets.
Operational Budgeting and Profit Planning
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University © Copyright 2007 Thomson South-Western,
The Master Budget and Flexible Budgeting
Chapter 20 The Budgeting Process.
ACCT 2302 Fundamentals of Accounting II Spring 2011 Lecture 12 Professor Jeff Yu.
Copyright © The McGraw-Hill Companies, Inc 2011 PROFIT PLANNING Chapter 8.
Master Budgets and Planning
22 Budgeting Accounting 26e C H A P T E R Warren Reeve Duchac
5 C H A P T E R Operating Budgets.
Budgeting - 1 BUDGETING Sales projections Business trends Inventory needs New competition ? ? ? ?
11-1 Operational Budgeting C hapter 11 Prepared by Douglas Cloud Pepperdine University.
8-1 HANSEN & MOWEN Cost Management ACCOUNTING AND CONTROL.
6-1 Operational and Financial Budgeting Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University 6.
© 2010 The McGraw-Hill Companies, Inc. Profit Planning Chapter 9.
Copyright © by Houghton Mifflin Company. All rights reserved.1 Financial & Managerial Accounting 2002e Belverd E. Needles, Jr. Marian Powers Susan Crosson.
8 -1 Functional and Activity- Based Budgeting CHAPTER.
Chapter Nine Profit Planning COPYRIGHT © 2012 Nelson Education Ltd.
Financial Planning and Analysis: The Master Budget
Budgetary Planning and Control
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
C H A P T E R 5 Operational Budgets. Learning Objective 1 Describe the importance of personal budgeting.
Principles of Cost Accounting 15 th edition Edward J. VanDerbeck © 2011 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated,
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Profit Planning Chapter Nine.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
© The McGraw-Hill Companies, Inc., 2002 Slide 24-1 McGraw-Hill/Irwin 24 Master Budgets and Planning.
McGraw-Hill/Irwin © The McGraw-Hill Companies, Inc., Master Budgets and Planning Chapter 23.
14-1 CHAPTER 14 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. Cost Analysis for Planning.
McGraw-Hill /Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 7 Profit Planning.
Profit Planning Chapter 8. © The McGraw-Hill Companies, Inc., 2003 McGraw-Hill/Irwin Budget Budget: A detailed plan for acquiring and using financial.
Profit Planning Management Accounting: The Cornerstone for Business Decisions Copyright ©2006 by South-Western, a division of Thomson Learning. All rights.
Copyright © 2008, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Nine Profit Planning.
Budgetary Planning and Control
PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker, Ph.D., CPA, CIA Cynthia J. Rooney, Ph.D.,
Copyright © 2006, The McGraw-Hill Companies, Inc.McGraw-Hill/Irwin Chapter Nine Profit Planning.
Profit Planning and Activity-Based Budgeting
8 BUDGETING FOR PLANNING & CONTROL
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 2 Basic Cost Management Concepts
© 2014 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Needles Powers Crosson Principles of Accounting 12e The Budgeting Process 22 C H A P T E R ©human/iStockphoto.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 17 Budgeting.
16-1 Activity- Based Budgeting Prepared by Douglas Cloud Pepperdine University Prepared by Douglas Cloud Pepperdine University.
McGraw-Hill/Irwin Chapter 8 Profit Planning. 9-2 Learning Objective 1 Understand why organizations budget and the processes they use to create budgets.
Profit Planning Chapter 9
1 Copyright © 2008 Cengage Learning South-Western. Mowen/Hansen Profit Planning Chapter Seven Fundamental Cornerstones of Managerial Accounting.
Master Budget Chapter 06 Chapter 8: Profit Planning
Budgeting for Planning and Control
Internal Planning and Measurement Tools
Planning for Profit and Cost Control
Budgeting for Planning and Control
BUDGETING ? ? ? ? Sales projections Inventory needs Business trends
The Master Budget and Flexible Budgeting
Presentation transcript:

COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and South-Western are trademarks used herein under license. 1 Chapter 8 Budgeting for Planning and Control

2 1.Define budgeting, and discuss its role in planning, controlling, and decision making. 2.Prepare the operating budget, identify its major components, and explain the interrelationships of the various components. 3.Identify the components of the financial budget, and prepare a cash budget. 4.Define flexible budgeting, and discuss its role in planning, control, and decision making. 5.Define activity-based budgeting, and discuss its role in planning, control, and decision making. 6.Identify and discuss the key features that a budgetary system should have to encourage managers to engage in goal-congruent behavior. Study Objectives

3 The Role of Budgeting in Planning and Control

4 Types of budgets –Master budget Operating budgets Financial budgets Time frame –Annual period –Multi-year rolling budget

5 The Role of Budgeting in Planning and Control Gathering information –Forecasting sales –Forecasting other variables The master budget starts with the sales forecast, which is basis for the sales budget. All other operating and most financial budgets are generated from the sales budget.

6 The Role of Budgeting in Planning and Control

7 The first budget is the sales budget which is based on the sales forecast. Starting point for Production Budget Starting point for Marketing Expense Budget Schedule 1 (in thousands) Goes to Budgeted Income Statement Preparing the Operating Budget

8 Starting point for Direct Materials Purchases Budget Starting point for Direct Labor Budget Schedule 2 (in thousands) Preparing the Operating Budget

9 Goes to Cost of Goods Sold Budget Schedule 3 (in thousands) Preparing the Operating Budget *Follows the inventory policy of having 8 million pounds of materials on hand at the end of the first and second quarters and 5 million pounds on hand at the end of the third and fourth quarters.

10 Goes to Cost of Goods Sold Budget Schedule 4 (in thousands) Starting point for Overhead Budget Preparing the Operating Budget

11 Goes to Cost of Goods Sold Budget Schedule 5 (in thousands) Preparing the Operating Budget *Includes $200,000 of depreciation in each quarter.

12 a Amounts taken from Schedule 3. b Amounts taken from Schedule 4. c Amounts taken from Schedule 5. d Budgeted fixed overhead (Schedule 5)/Budgeted direct labor hours (Schedule 4) = $1,280/240 = $5.33. Goes to Cost of Goods Sold Budget Schedule 6 (in thousands) Preparing the Operating Budget

13 *Production needs  $0.01 = 416,000  $0.01. Goes to Budgeted Income Statement Schedule 7 (in thousands) Preparing the Operating Budget

14 Goes to Budgeted Income Statement Schedule 8 (in thousands) Preparing the Operating Budget

15 Goes to Budgeted Income Statement Schedule 9 (in thousands) Preparing the Operating Budget

16 Goes to Budgeted Income Statement Schedule 10 (in thousands) Preparing the Operating Budget

17 Schedule 11 (in thousands) Preparing the Operating Budget

18 Operating Budgets for Merchandising and Service Firms Merchandising –Merchandise purchases replaces production –Direct materials and direct labor are not required For-profit service: –Sales budget is the production budget –Inventories are nonexistent Not-for-profit service: –Budget for level and types of services provided –Statement of sources and uses replaces income statement

19 Preparing the Financial Budget Cash budget –Break down into short time periods –Forecast need for short-term borrowing –Forecast periods of high cash balances Beginning cash balance +Cash receipts Cash available –Cash disbursements –Minimum cash balance Excess or deficiency of cash –Repayments +Loans +Minimum cash balance Ending cash balance

20 (Continued on next slide) Schedule 12 (in thousands) Preparing the Financial Budget

21 (Continued from previous slide) (Continued on next slide) Schedule 12 (in thousands) Preparing the Financial Budget

22 (Continued from previous slide) Schedule 12 (in thousands) Preparing the Financial Budget

23 Preparing the Financial Budget Budgeted balance sheet –Current (actual) balance sheet –Integrate data from all other budgets

24 Schedule 13 (in thousands) Preparing the Financial Budget a Ending balance from Schedule 12. b 30 percent of fourth-quarter credit sales (0.30 × $800,000); see Schedules 1 and 12. c From Schedule 3 (5,000,000 lbs. × $0.01). d From Schedule 6. e From the December 31, 2009, balance sheet. f December 31, 2009, balance ($9,000,000) plus new equipment acquisition of $600,000; see the 2009 ending balance sheet and Schedule 12. g From the December 31, 2009, balance sheet and Schedules 5, 8, and 10 ($4,500,000 + $800,000 + $20,000 + $40,000). h 20% of fourth-quarter purchases; see Schedules 3 and 12. i From the December 31, 2009, balance sheet. j $6,825,000 + $894,000 (December 31, 2009, balance plus net income from Schedule 11).

25 Shortcomings of the Traditional Master Budget Process Departmental orientation –Plan from resources to outputs –Does not recognize interdependencies among departments Static budgets –Developed for a single level of activity –Based on incremental adjustments Results orientation –Disconnects the process from its output –Cost-cutting accomplished by across-the-board cuts

26 Flexible Budgets for Planning and Control Static budget Vital for planning Less useful for control Master budget Developed around a single level of activity Budgeted activity level rarely equals actual activity

27 Flexible Budgets for Planning and Control

28 Flexible Budgets for Planning and Control Static budgets Master budget Vital for planning Less useful for control Developed around a single level of activity Budgeted activity level rarely equals actual activity Flexible budgets Variable budget Provides expected costs for a range of activity Provides budgeted costs for the actual activity level

29 Flexible Budgets for Planning and Control

30 Flexible Budgets for Planning and Control Flexible budget performance report –Compare budgeted costs given the actual level of activity to the actual costs for the same level –Locate possible problem areas by examining the flexible budget variances –Examines efficiency

31 Flexible Budgets for Planning and Control

32 Flexible Budgets for Planning and Control Flexible budget performance report –Compare budgeted costs given the actual level of activity to the actual costs for the same level –Locate possible problem areas by examining the flexible budget variances –Examines efficiency Managerial performance report –Flexible budget variances –Actual results vs. flexible budget –Examines efficiency –Volume variances –Static budget vs. flexible budget –Examines effectiveness

33 Flexible Budgets for Planning and Control

34 Flexible Budgets for Planning and Control A flexible budget can be built for five overhead activities using three drivers; each is budgeted for two activity levels.

35 Flexible Budgets for Planning and Control The activity-based performance report measures budget variances for each of the overhead activities.

36 Activity-Based Budgets ABB begins with output and then determines the resources necessary to created that output. ABB works backwards from activities and their drivers to the underlying costs –Traditional budgeting relies on functional- based line items (salaries, supplies, etc.) –Flexible budget uses cost behavior to split functional-based line items into fixed and variable

37 Activity-Based Budgets Traditional budgeting relies on functional-based line items.

38 Activity-Based Budgets Flexible budgeting uses cost behavior to split functional-based line items into fixed and variable costs.

39 Activity-Based Budgets Steps to construct an ABB 1.Determine the unit’s output 2.Identify the activities (and related drivers) needed to deliver the output 3.Estimate the demand for each activity 4.Determine the cost of resources required to produce the relevant activities

40 Activity-Based Budgets

41 The Behavioral Dimension of Budgeting Characteristics of a good budgetary system –Frequent feedback on performance –Monetary and nonmonetary incentives –Participative budgeting –Realistic standards –Controllability of costs –Multiple measures of performance

COST MANAGEMENT Accounting & Control Hansen▪Mowen▪Guan COPYRIGHT © 2009 South-Western Publishing, a division of Cengage Learning. Cengage Learning and South-Western are trademarks used herein under license. 42 End Chapter 8