MODERATE RISK WASTE FACILITY DESIGN EVOLUTION AT KING COUNTY James Neely NAHMMA 2012 Northwest Conference
PART ONE: PILOT HHW FACILITY MADE SEMI-PERMANENT
Factoria Transfer Station Pre-Development 2001
Pilot MRW Facility Opened Sept. 2002
Failure of Retractable Awning
2004: Pilot to Semi-Permanent Facility
INITIAL RESULTS
BE PREPARED FOR THE EXOTICS
CONSIDER OUTDOOR STORAGE NEEDS Type 4 Outdoor Explosives Magazine for Marine Flares
PART TWO: FINALLY A REAL FACILITY
REBUILT FACTORIA TRANSFER STATION AND MODERATE RISK WASTE FACILITY Opening Planned for 2015
DESIGN CONSIDERATIONS SUMMARY Size Ventilation and Fire Safety Ergonomics/Self Service Opportunities To Bulk or Not to Bulk Green Building Employee Comfort
CONCEPTUAL DESIGN
LOCAL EXHAUST VENTILATION
DIRECT VENTILATION- BEST