SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.

Slides:



Advertisements
Similar presentations
Thread Cutting Part 2: Cutting an external thread.
Advertisements

WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Flange-lok Installation Instructions Quick Installation Guide rev. DB.
Engineering Division 1 HFT Middle Support Cylinder Eric Anderssen, LBNL.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
ME 330 Manufacturing Processes MECHANICAL ASSEMBLY: Joining Methods using Fasteners.
TrailerBot is a robot that moves trailer as using connecting device on the back of a truck with only driving space. Learn about standard that divides vehicle’s.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Observations and next works from the recent tests of the insertion tools of Mini-Drawers at CERN Roméo Bonnefoy and François Vazeille Tilecal Operation.
Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
31 août 2011 Didier Laporte – LPNHE Paris 1 IBL Integration Stave Review Université de Genève.
MECHANICAL DRAWING Chapter 11: Threads Fasteners and Springs
Static and Fatigue Bolt Design
Installation. Indoor Unit Installation Typical Installation.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
MR. PATTERSON CONSTRUCTION TECH 1
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
FASTENERS.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
WG3 Insertion/Extraction Testing Program R. Vuillermet 11/04/20111.
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
Compressor Replacement – ODU
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
Motor Mounting MECH1200 Foot Mount: Simple and common Tabs or feet that are attached at the four corners of the motor and attaches to a bedplate. Sometimes.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Camera Motion System Requirement Design Details FEA.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Applied Metallurgy EBB440 MECHANICAL ASSEMBLY Prepared by : AAS.
Drawing of bolt and nut.
EC: 7 DISK concept Preliminary considerations
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
Baby-MIND Modules & Services
IBL project for DT Science-Techno Tea
“CENTRAL SUPPORT FRAME” -
STRAW TRACKER SYSTEM CAD STATUS :
Metalwork Threaded Fasteners.
Status and Progress of NSW HUB and Extension
Strip Petals: Local supports and prototype tests
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
826YD 21/2”-10”.
Easycliner (Motorized Version) Assembly Instruction
Integration issues at IHEP
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
MACHINE PARTS (FOR DCE / DIT)
Detail and Assembly Drawing
Integration and IR Hall
Preliminary PXL support models with assembly fixtures
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
Cryomodule Assembly Plan
880V 21/2”-10”.
Inner DET. Integration Inner detector envelope Radial clearances.
MACHINE DRAWING NAME : SYED AMER UR RAHMAN B.TECH 2 – 2
Senad Kudumovic Design engineer
Educational Power Point by D&T Within Schools
Neutron guide Shielding Concept
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Basics of Plumbing Pipe Joints Workshop - CIVL 222.
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
SNS PPU Cryomodule Space Frame
Presentation transcript:

SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti

Introduction The IST (Inner Support Tube) insertion will be done by mean of the LGT (Long Guiding Tube), once the current beam pipe will be removed The IST inner diameter is 85mm the outer diameter is 86mm The LGT outer diameter is 55mm + the rolling spheres. It’s envelope is 57.6mm There is the need for an interface between the IST and the LGT. This interface is called “Space Frame” 2

IBL insertion The macro steps of the IBL insertion will be: 1.Insertion of the LGT inside the current beam pipe (ᴓ 58mm) 2.Connection of the LGT to the motor and the tensioning wire 3.Extraction of the current beam pipe 4.Insertion of the IST + Space frame 5.Connection of the IST to the various supports 6.Extraction of the Space frame + the LGT 7.Insertion of the IBL 3

Space frame The current version of the Space frame is a carbon fibre pipe (L = 6620mm - ᴓ i = 58mm - ᴓ o = 60mm) with 7 peek flanges. Due to commercial sizes constraints (max length is 4000mm), the main pipe will be split in 2 parts and joined together with a joint (L = 300mm - ᴓ i = 60mm - ᴓ o = 64mm) Among the 7 flanges, there will be 2 special flanges (the external ones). These special flanges will slightly different from the others due to the presence of stopper rings screwed on them. 4

5 Main pipe Joint

6

7

Main pipe long part 8 Long pipe 4000mm

Main pipe long part + short part 9 Long pipe 4000mm Short pipe 2620mm

Main pipe 10 Long pipe 4000mm Joint 300mm N.B. The Joint will not be in a symmetric position with respect to the pipe Short pipe 2620mm

Main pipe 11 Long pipe 4000mm Short pipe 2620mm Joint 300mm N.B. The flanges will be in a symmetric position in respect to the pipe Special flange Flanges Special flange

Main pipe - detail 12 Main pipe Flange Special flange Each flange will be glued on the carbon fibre pipe

Flange 13 R i R o  m between the flange inner diameter and the main pipe outer diameter 200  m between the IST inner diameter and the flange outer diameter

Special flange 14 Stopper ring ᴓ o = 86mm Modified flange 3 x M3-30 screws 3 x M3 nuts 6 x 3-7 normal washers Either one of the following solution could be used: 1.Each nut could be weld to its washer and the washer glued to the modified flange 2.Thread directly the modified flange without the need for the nuts and second washers

Special flange 15 The stopper ring of the special flange is used for the fine positioning of the Space frame with respect to the IST. During the insertion of the Space frame inside the IST, one of the two stopper rings is removed. The Space frame is slid inside the IST and in the end the second stopper ring is added and tighten using the bolts.

IST 16

Space frame insertion 17 Modified flange (Stopper ring has been removed) IST Main pipe Flange

Space frame insertion 18 Main pipe Flange Special flange

Space frame insertion 19 IST Modified flange Stopper ring IST Special flange

LGT + IST + Space frame 20 Side C Side A

Front view 21 IST Special flange (Side A) Flange Main pipe of Space frame LGT

Further work Design and realize the connection interface between the LGT and the Space frame for the extraction of the LGT Realize a prototype of the Space frame in order to check gaps and clearance between the parts, and to control the response of the various material to our need Design and realize the interfaces with the extraction/insertion tables (intermediate table, pit table, etc.) 22